110 lines
4.2 KiB
Markdown
110 lines
4.2 KiB
Markdown
# Task: 拉取远程主分支、合并并推送
|
|
|
|
## Identity
|
|
|
|
- Task ID: 20260813-sync-push-main-9c2f71
|
|
- Mode: Integration
|
|
- Branch: main
|
|
- Worktree: D:\Datas\OthersProjects\makelore
|
|
- Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9
|
|
- Owner: codex
|
|
- Status: In Progress
|
|
|
|
## Scope
|
|
|
|
- Fetch the authoritative remote `main`, inspect all commits not present in the
|
|
local branch, and merge them into the reviewed local `main` without rewriting
|
|
either history.
|
|
- Resolve any code or project-memory conflicts semantically, re-run verification
|
|
proportionate to the fetched changes, obtain an independent final review, and
|
|
push the resulting `main` to its configured remote.
|
|
- Record the exact fetched remote tip, merge topology, verification, and push
|
|
result in this task record.
|
|
|
|
## Intent And Constraints
|
|
|
|
- Do not rebase, reset, stash, force-push, or discard either local or remote
|
|
commits. The user authorized a normal pull/merge/push workflow.
|
|
- Treat the current `origin/main` value as a stale local tracking reference until
|
|
`git fetch origin main` succeeds.
|
|
- Preserve the already reviewed Updater and image-to-image behavior and the
|
|
repository's Main-owned security boundaries.
|
|
- Source/peer task records remain read-only. This integration task may update
|
|
only its own task record and any canonical documents that genuinely require
|
|
semantic reconciliation.
|
|
- Push only after the merge result is clean, verified, and independently
|
|
reviewed. Never use `--force`.
|
|
|
|
## Project Context Loaded
|
|
|
|
Task context:
|
|
- Task ID: `20260813-sync-push-main-9c2f71`
|
|
- Mode: Integration
|
|
- Branch: `main`
|
|
- Worktree: `D:\Datas\OthersProjects\makelore`
|
|
- Base commit: `4fbd1d3b24493532ce479729da2c5e5e1709c8a9`
|
|
- Other active local tasks: all are isolated in separate registered worktrees;
|
|
their Scope, Intent And Constraints, and Promotion Candidates were reviewed.
|
|
- Overlap or semantic-conflict assessment: no peer owns this worktree or has an
|
|
unresolved decision that changes this synchronization plan. Remote overlap
|
|
remains unknown until fetch and will be inspected before merge.
|
|
|
|
Read:
|
|
- `.project-docs/05-agent-entry/read-before-planning.md`
|
|
- `.project-docs/05-agent-entry/memory-index.md`
|
|
- this active task record
|
|
- `.project-docs/00-brief/project-positioning.md`
|
|
- `.project-docs/30-worklog/current-state.md`
|
|
- `.project-docs/10-decisions/decision-index.md`
|
|
- `.project-docs/20-architecture/system-overview.md`
|
|
- `.project-docs/05-agent-entry/integration-gate.md`
|
|
- `.project-docs/50-evidence/evidence-index.md`
|
|
- `.project-docs/60-reflection/reflection-index.md`
|
|
- `.project-docs/80-commitments/commitments.md`
|
|
- `.project-docs/90-maintenance/stale-items.md`
|
|
- all registry-owned peer task records through the required planning sections
|
|
|
|
Relevant understanding:
|
|
- Project goal: keep the reviewed local Makelore client history while
|
|
incorporating legitimate remote `main` work and publishing one coherent tip.
|
|
- Current integrated focus: local `main` already contains the reviewed Updater
|
|
and single-reference image-to-image changes; external production smoke remains
|
|
pending and must not be overclaimed by this Git synchronization.
|
|
- Active constraints: preserve Main-owned updater/workspace boundaries, existing
|
|
canonical decisions, and source task records; push must be non-forced.
|
|
- Evidence and commitments: the local tip passed 84 focused tests, typecheck,
|
|
scoped lint, `build:vite`, project-document gates, and independent Sol review;
|
|
three full-suite failures match the documented pre-existing baseline.
|
|
- Unknowns: the latest remote tip and its semantic overlap are not verified
|
|
until fetch.
|
|
|
|
Gate result:
|
|
- Passed.
|
|
|
|
## Plan
|
|
|
|
1. Commit this integration ownership record, fetch `origin/main`, and inspect
|
|
remote-only commits, paths, and topology.
|
|
2. Merge `origin/main` normally with local `main` as first parent; resolve any
|
|
conflict semantically and inspect the combined tree.
|
|
3. Run focused/full checks required by the fetched changes plus project-document
|
|
gates, then obtain a final independent Sol PASS/FAIL review.
|
|
4. Complete documentation, push `main` without force, verify local/remote tip
|
|
equality, and release the clean integration task.
|
|
|
|
## Outcome
|
|
|
|
- Not completed.
|
|
|
|
## Verification
|
|
|
|
- Not run.
|
|
|
|
## Follow-ups
|
|
|
|
- None recorded.
|
|
|
|
## Promotion Candidates
|
|
|
|
- None recorded.
|