Files
makelore/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md

110 lines
4.2 KiB
Markdown

# Task: 拉取远程主分支、合并并推送
## Identity
- Task ID: 20260813-sync-push-main-9c2f71
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9
- Owner: codex
- Status: In Progress
## Scope
- Fetch the authoritative remote `main`, inspect all commits not present in the
local branch, and merge them into the reviewed local `main` without rewriting
either history.
- Resolve any code or project-memory conflicts semantically, re-run verification
proportionate to the fetched changes, obtain an independent final review, and
push the resulting `main` to its configured remote.
- Record the exact fetched remote tip, merge topology, verification, and push
result in this task record.
## Intent And Constraints
- Do not rebase, reset, stash, force-push, or discard either local or remote
commits. The user authorized a normal pull/merge/push workflow.
- Treat the current `origin/main` value as a stale local tracking reference until
`git fetch origin main` succeeds.
- Preserve the already reviewed Updater and image-to-image behavior and the
repository's Main-owned security boundaries.
- Source/peer task records remain read-only. This integration task may update
only its own task record and any canonical documents that genuinely require
semantic reconciliation.
- Push only after the merge result is clean, verified, and independently
reviewed. Never use `--force`.
## Project Context Loaded
Task context:
- Task ID: `20260813-sync-push-main-9c2f71`
- Mode: Integration
- Branch: `main`
- Worktree: `D:\Datas\OthersProjects\makelore`
- Base commit: `4fbd1d3b24493532ce479729da2c5e5e1709c8a9`
- Other active local tasks: all are isolated in separate registered worktrees;
their Scope, Intent And Constraints, and Promotion Candidates were reviewed.
- Overlap or semantic-conflict assessment: no peer owns this worktree or has an
unresolved decision that changes this synchronization plan. Remote overlap
remains unknown until fetch and will be inspected before merge.
Read:
- `.project-docs/05-agent-entry/read-before-planning.md`
- `.project-docs/05-agent-entry/memory-index.md`
- this active task record
- `.project-docs/00-brief/project-positioning.md`
- `.project-docs/30-worklog/current-state.md`
- `.project-docs/10-decisions/decision-index.md`
- `.project-docs/20-architecture/system-overview.md`
- `.project-docs/05-agent-entry/integration-gate.md`
- `.project-docs/50-evidence/evidence-index.md`
- `.project-docs/60-reflection/reflection-index.md`
- `.project-docs/80-commitments/commitments.md`
- `.project-docs/90-maintenance/stale-items.md`
- all registry-owned peer task records through the required planning sections
Relevant understanding:
- Project goal: keep the reviewed local Makelore client history while
incorporating legitimate remote `main` work and publishing one coherent tip.
- Current integrated focus: local `main` already contains the reviewed Updater
and single-reference image-to-image changes; external production smoke remains
pending and must not be overclaimed by this Git synchronization.
- Active constraints: preserve Main-owned updater/workspace boundaries, existing
canonical decisions, and source task records; push must be non-forced.
- Evidence and commitments: the local tip passed 84 focused tests, typecheck,
scoped lint, `build:vite`, project-document gates, and independent Sol review;
three full-suite failures match the documented pre-existing baseline.
- Unknowns: the latest remote tip and its semantic overlap are not verified
until fetch.
Gate result:
- Passed.
## Plan
1. Commit this integration ownership record, fetch `origin/main`, and inspect
remote-only commits, paths, and topology.
2. Merge `origin/main` normally with local `main` as first parent; resolve any
conflict semantically and inspect the combined tree.
3. Run focused/full checks required by the fetched changes plus project-document
gates, then obtain a final independent Sol PASS/FAIL review.
4. Complete documentation, push `main` without force, verify local/remote tip
equality, and release the clean integration task.
## Outcome
- Not completed.
## Verification
- Not run.
## Follow-ups
- None recorded.
## Promotion Candidates
- None recorded.