# Task: 拉取远程主分支、合并并推送 ## Identity - Task ID: 20260813-sync-push-main-9c2f71 - Mode: Integration - Branch: main - Worktree: D:\Datas\OthersProjects\makelore - Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9 - Owner: codex - Status: In Progress ## Scope - Fetch the authoritative remote `main`, inspect all commits not present in the local branch, and merge them into the reviewed local `main` without rewriting either history. - Resolve any code or project-memory conflicts semantically, re-run verification proportionate to the fetched changes, obtain an independent final review, and push the resulting `main` to its configured remote. - Record the exact fetched remote tip, merge topology, verification, and push result in this task record. ## Intent And Constraints - Do not rebase, reset, stash, force-push, or discard either local or remote commits. The user authorized a normal pull/merge/push workflow. - Treat the current `origin/main` value as a stale local tracking reference until `git fetch origin main` succeeds. - Preserve the already reviewed Updater and image-to-image behavior and the repository's Main-owned security boundaries. - Source/peer task records remain read-only. This integration task may update only its own task record and any canonical documents that genuinely require semantic reconciliation. - Push only after the merge result is clean, verified, and independently reviewed. Never use `--force`. ## Project Context Loaded Task context: - Task ID: `20260813-sync-push-main-9c2f71` - Mode: Integration - Branch: `main` - Worktree: `D:\Datas\OthersProjects\makelore` - Base commit: `4fbd1d3b24493532ce479729da2c5e5e1709c8a9` - Other active local tasks: all are isolated in separate registered worktrees; their Scope, Intent And Constraints, and Promotion Candidates were reviewed. - Overlap or semantic-conflict assessment: no peer owns this worktree or has an unresolved decision that changes this synchronization plan. Remote overlap remains unknown until fetch and will be inspected before merge. Read: - `.project-docs/05-agent-entry/read-before-planning.md` - `.project-docs/05-agent-entry/memory-index.md` - this active task record - `.project-docs/00-brief/project-positioning.md` - `.project-docs/30-worklog/current-state.md` - `.project-docs/10-decisions/decision-index.md` - `.project-docs/20-architecture/system-overview.md` - `.project-docs/05-agent-entry/integration-gate.md` - `.project-docs/50-evidence/evidence-index.md` - `.project-docs/60-reflection/reflection-index.md` - `.project-docs/80-commitments/commitments.md` - `.project-docs/90-maintenance/stale-items.md` - all registry-owned peer task records through the required planning sections Relevant understanding: - Project goal: keep the reviewed local Makelore client history while incorporating legitimate remote `main` work and publishing one coherent tip. - Current integrated focus: local `main` already contains the reviewed Updater and single-reference image-to-image changes; external production smoke remains pending and must not be overclaimed by this Git synchronization. - Active constraints: preserve Main-owned updater/workspace boundaries, existing canonical decisions, and source task records; push must be non-forced. - Evidence and commitments: the local tip passed 84 focused tests, typecheck, scoped lint, `build:vite`, project-document gates, and independent Sol review; three full-suite failures match the documented pre-existing baseline. - Unknowns: the latest remote tip and its semantic overlap are not verified until fetch. Gate result: - Passed. ## Plan 1. Commit this integration ownership record, fetch `origin/main`, and inspect remote-only commits, paths, and topology. 2. Merge `origin/main` normally with local `main` as first parent; resolve any conflict semantically and inspect the combined tree. 3. Run focused/full checks required by the fetched changes plus project-document gates, then obtain a final independent Sol PASS/FAIL review. 4. Complete documentation, push `main` without force, verify local/remote tip equality, and release the clean integration task. ## Outcome - Not completed. ## Verification - Not run. ## Follow-ups - None recorded. ## Promotion Candidates - None recorded.