Files
makelore/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md

4.2 KiB

Task: 拉取远程主分支、合并并推送

Identity

  • Task ID: 20260813-sync-push-main-9c2f71
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 4fbd1d3b24
  • Owner: codex
  • Status: In Progress

Scope

  • Fetch the authoritative remote main, inspect all commits not present in the local branch, and merge them into the reviewed local main without rewriting either history.
  • Resolve any code or project-memory conflicts semantically, re-run verification proportionate to the fetched changes, obtain an independent final review, and push the resulting main to its configured remote.
  • Record the exact fetched remote tip, merge topology, verification, and push result in this task record.

Intent And Constraints

  • Do not rebase, reset, stash, force-push, or discard either local or remote commits. The user authorized a normal pull/merge/push workflow.
  • Treat the current origin/main value as a stale local tracking reference until git fetch origin main succeeds.
  • Preserve the already reviewed Updater and image-to-image behavior and the repository's Main-owned security boundaries.
  • Source/peer task records remain read-only. This integration task may update only its own task record and any canonical documents that genuinely require semantic reconciliation.
  • Push only after the merge result is clean, verified, and independently reviewed. Never use --force.

Project Context Loaded

Task context:

  • Task ID: 20260813-sync-push-main-9c2f71
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9
  • Other active local tasks: all are isolated in separate registered worktrees; their Scope, Intent And Constraints, and Promotion Candidates were reviewed.
  • Overlap or semantic-conflict assessment: no peer owns this worktree or has an unresolved decision that changes this synchronization plan. Remote overlap remains unknown until fetch and will be inspected before merge.

Read:

  • .project-docs/05-agent-entry/read-before-planning.md
  • .project-docs/05-agent-entry/memory-index.md
  • this active task record
  • .project-docs/00-brief/project-positioning.md
  • .project-docs/30-worklog/current-state.md
  • .project-docs/10-decisions/decision-index.md
  • .project-docs/20-architecture/system-overview.md
  • .project-docs/05-agent-entry/integration-gate.md
  • .project-docs/50-evidence/evidence-index.md
  • .project-docs/60-reflection/reflection-index.md
  • .project-docs/80-commitments/commitments.md
  • .project-docs/90-maintenance/stale-items.md
  • all registry-owned peer task records through the required planning sections

Relevant understanding:

  • Project goal: keep the reviewed local Makelore client history while incorporating legitimate remote main work and publishing one coherent tip.
  • Current integrated focus: local main already contains the reviewed Updater and single-reference image-to-image changes; external production smoke remains pending and must not be overclaimed by this Git synchronization.
  • Active constraints: preserve Main-owned updater/workspace boundaries, existing canonical decisions, and source task records; push must be non-forced.
  • Evidence and commitments: the local tip passed 84 focused tests, typecheck, scoped lint, build:vite, project-document gates, and independent Sol review; three full-suite failures match the documented pre-existing baseline.
  • Unknowns: the latest remote tip and its semantic overlap are not verified until fetch.

Gate result:

  • Passed.

Plan

  1. Commit this integration ownership record, fetch origin/main, and inspect remote-only commits, paths, and topology.
  2. Merge origin/main normally with local main as first parent; resolve any conflict semantically and inspect the combined tree.
  3. Run focused/full checks required by the fetched changes plus project-document gates, then obtain a final independent Sol PASS/FAIL review.
  4. Complete documentation, push main without force, verify local/remote tip equality, and release the clean integration task.

Outcome

  • Not completed.

Verification

  • Not run.

Follow-ups

  • None recorded.

Promotion Candidates

  • None recorded.