3.3 KiB
3.3 KiB
Task: Finalize repository pull integration
Identity
- Task ID: 20260905-finalize-pull-integration-c49a71
- Mode: Integration
- Branch: main
- Worktree: /Users/inmanx/Documents/makelore
- Base commit:
8064add242 - Owner: codex
- Status: Ready for Integration
Scope
- Close the project-document ownership gate from synchronized base
8064add2420e5a2f571c1bb99e64589b66473c75, which already contains the remote merge and canonical reconciliation. - Verify remote ancestry, ahead/behind state, Git whitespace, task-registry consistency, and the final worktree without changing product behavior.
Intent And Constraints
- Treat prior integration task
20260905-integrate-remote-main-b83d6fand mergea2cb07fas immutable source evidence. - Make no additional canonical-document, product-code, package, deployment, publication, push, rebase, reset, or history-rewrite change.
- Keep only this task's own record as new project documentation.
Project Context Loaded
- Concurrent Task Gate: passed for this exact
mainworktree, Integration mode, base commit, and exclusive integration lock. - Planning Gate: passed after re-reading the active and source task records, current integrated state, decision index, and system overview.
- Other active local tasks: none.
- Semantic-conflict assessment: none remains. ADR-008 and the Project Scaffold integration coexist with the authoritative three-module product boundary and retired Learning implementation.
Outcome
- Confirmed that local
maincontains remoteorigin/main@d642d76as an ancestor and preserves the ordinary two-parent mergea2cb07fplus documentation reconciliation8064add. - Confirmed that the two remote task records remain recoverable in remote parent history but are absent from the current default tree, satisfying task-owned document boundaries without changing their contents.
- Added no product or canonical state changes. This record is the only change made from the fresh closure baseline.
Verification
check_project_docs.pypassed before claiming the closure task.git rev-list --left-right --count main...origin/mainreturned9 0before committing this final task record; local is not behind the fetched remote.git merge-base --is-ancestor origin/main mainpassed.git showconfirmed mergea2cb07fhas parents53f3db3andd642d76.git diff --check origin/main..mainpassed.task_context.py doctorreported a consistent task registry.check_doc_drift.py --task-id 20260905-finalize-pull-integration-c49a71passed from the fresh post-merge baseline.- Product verification is inherited unchanged from the immediately preceding integration task: focused Vitest 228/228, canonical-path scaffold tests 12/12, typecheck, full unit 1,859 with 3 skips plus pressure 1/1, lint 0 errors, Vite production build, and targeted Electron E2E 1/1 all passed.
Follow-ups
- The macOS
/varversus/private/varcopied-script test-path portability issue and production Works Square migration20260904_project_scaffold_0085remain the two explicit follow-ups recorded by the source integration task.
Promotion Candidates
- None. Canonical reconciliation was completed by the source integration task; this task only closes the ownership gate from a clean baseline.