docs: close repository pull integration

This commit is contained in:
inman
2026-09-05 12:45:53 +08:00
parent 8064add242
commit c501403076

View File

@@ -0,0 +1,76 @@
# Task: Finalize repository pull integration
## Identity
- Task ID: 20260905-finalize-pull-integration-c49a71
- Mode: Integration
- Branch: main
- Worktree: /Users/inmanx/Documents/makelore
- Base commit: 8064add2420e5a2f571c1bb99e64589b66473c75
- Owner: codex
- Status: Ready for Integration
## Scope
- Close the project-document ownership gate from synchronized base
`8064add2420e5a2f571c1bb99e64589b66473c75`, which already contains the remote
merge and canonical reconciliation.
- Verify remote ancestry, ahead/behind state, Git whitespace, task-registry
consistency, and the final worktree without changing product behavior.
## Intent And Constraints
- Treat prior integration task `20260905-integrate-remote-main-b83d6f` and merge
`a2cb07f` as immutable source evidence.
- Make no additional canonical-document, product-code, package, deployment,
publication, push, rebase, reset, or history-rewrite change.
- Keep only this task's own record as new project documentation.
## Project Context Loaded
- Concurrent Task Gate: passed for this exact `main` worktree, Integration mode,
base commit, and exclusive integration lock.
- Planning Gate: passed after re-reading the active and source task records,
current integrated state, decision index, and system overview.
- Other active local tasks: none.
- Semantic-conflict assessment: none remains. ADR-008 and the Project Scaffold
integration coexist with the authoritative three-module product boundary and
retired Learning implementation.
## Outcome
- Confirmed that local `main` contains remote `origin/main@d642d76` as an ancestor
and preserves the ordinary two-parent merge `a2cb07f` plus documentation
reconciliation `8064add`.
- Confirmed that the two remote task records remain recoverable in remote parent
history but are absent from the current default tree, satisfying task-owned
document boundaries without changing their contents.
- Added no product or canonical state changes. This record is the only change made
from the fresh closure baseline.
## Verification
- `check_project_docs.py` passed before claiming the closure task.
- `git rev-list --left-right --count main...origin/main` returned `9 0` before
committing this final task record; local is not behind the fetched remote.
- `git merge-base --is-ancestor origin/main main` passed.
- `git show` confirmed merge `a2cb07f` has parents `53f3db3` and `d642d76`.
- `git diff --check origin/main..main` passed.
- `task_context.py doctor` reported a consistent task registry.
- `check_doc_drift.py --task-id 20260905-finalize-pull-integration-c49a71`
passed from the fresh post-merge baseline.
- Product verification is inherited unchanged from the immediately preceding
integration task: focused Vitest 228/228, canonical-path scaffold tests 12/12,
typecheck, full unit 1,859 with 3 skips plus pressure 1/1, lint 0 errors, Vite
production build, and targeted Electron E2E 1/1 all passed.
## Follow-ups
- The macOS `/var` versus `/private/var` copied-script test-path portability issue
and production Works Square migration `20260904_project_scaffold_0085` remain the
two explicit follow-ups recorded by the source integration task.
## Promotion Candidates
- None. Canonical reconciliation was completed by the source integration task;
this task only closes the ownership gate from a clean baseline.