76 lines
3.2 KiB
Markdown
76 lines
3.2 KiB
Markdown
# Task: Finalize all changes main integration
|
|
|
|
## Identity
|
|
|
|
- Task ID: 20260907-finalize-merge-all-4d72c1
|
|
- Mode: Integration
|
|
- Branch: codex/20260907-merge-all-changes-8f3c2a-merge-all-changes
|
|
- Worktree: /Users/inmanx/Documents/makelore-integrate-all-8f3c2a
|
|
- Base commit: 0fb1dac245b69966777edf4fc208840ae7af73bb
|
|
- Owner: codex
|
|
- Status: Completed
|
|
|
|
## Scope
|
|
|
|
- Close the project-document ownership gate from reconciled integration commit
|
|
`0fb1dac245b69966777edf4fc208840ae7af73bb`.
|
|
- Verify source-commit ancestry, the intentionally excluded historical branches,
|
|
clean worktrees, and fast-forward safety, then advance local `main` to the
|
|
finalized candidate.
|
|
|
|
## Intent And Constraints
|
|
|
|
- Make no new product or architecture change. This task exists because the prior
|
|
integration task necessarily saw foreign task records in its merge-parent
|
|
history; the fresh base makes the final ownership audit meaningful without
|
|
rewriting history.
|
|
- Preserve all source branches, worktrees, untracked audit/report artifacts, and
|
|
ordinary merge commits. Do not rebase, reset, force-push, delete, or publish.
|
|
- Keep the two superseded Learning branches outside `main` and keep the active
|
|
product boundary at Code, Canvas, and Robot.
|
|
- Promote only local `main`; the user did not authorize a remote push.
|
|
|
|
## Project Context Loaded
|
|
|
|
- Read the prior integration task record, canonical current state, ADR-007,
|
|
ADR-008, decision index, architecture maps/flows, business rules, glossary,
|
|
commitments, and Integration Gate requirements from candidate `0fb1dac`.
|
|
- Confirmed the prior task already reconciled every completed product source and
|
|
ran focused/full unit, lint, typecheck, build, and targeted Electron gates.
|
|
- Other active task worktrees are source/audit histories already classified by
|
|
the prior task. This final task changes only its own record and local branch
|
|
placement, so no new semantic overlap remains.
|
|
- Gate result: Passed. The fresh task's drift check reports only this task-owned
|
|
record and holds the Integration lock.
|
|
|
|
## Outcome
|
|
|
|
- Finalized the reconciled integration candidate without altering product code.
|
|
- Confirmed all five accepted source commits and their ordinary merge commits are
|
|
ancestors of the candidate, while only the two superseded Learning refs remain
|
|
outside it.
|
|
- Advanced local `main` by fast-forward to this task's final commit; no history
|
|
was rewritten and no remote push was made.
|
|
|
|
## Verification
|
|
|
|
- Fresh `check_doc_drift.py` ownership check — passed.
|
|
- Inherited candidate verification at `0fb1dac`: typecheck passed; 184 focused
|
|
tests passed; full unit passed 1,882 with 3 skips plus pressure 1/1; lint had 0
|
|
errors and 5 existing warnings; all Vite targets built; targeted Electron E2E
|
|
passed 12/12.
|
|
- Source ancestry, `git diff --check`, candidate cleanliness, `main` fast-forward
|
|
relationship, final `main` equality, and remaining unmerged-branch inventory
|
|
were checked during promotion.
|
|
|
|
## Follow-ups
|
|
|
|
- Remote `origin/main` remains unchanged. Push only on a separate explicit user
|
|
request.
|
|
- Existing production/service/package commitments remain as recorded in
|
|
canonical project memory; this local merge does not satisfy them.
|
|
|
|
## Promotion Candidates
|
|
|
|
- None recorded.
|