docs: close final main integration gate

This commit is contained in:
inman
2026-09-07 11:10:30 +08:00
parent 0fb1dac245
commit 860c97d466

View File

@@ -0,0 +1,75 @@
# Task: Finalize all changes main integration
## Identity
- Task ID: 20260907-finalize-merge-all-4d72c1
- Mode: Integration
- Branch: codex/20260907-merge-all-changes-8f3c2a-merge-all-changes
- Worktree: /Users/inmanx/Documents/makelore-integrate-all-8f3c2a
- Base commit: 0fb1dac245b69966777edf4fc208840ae7af73bb
- Owner: codex
- Status: Completed
## Scope
- Close the project-document ownership gate from reconciled integration commit
`0fb1dac245b69966777edf4fc208840ae7af73bb`.
- Verify source-commit ancestry, the intentionally excluded historical branches,
clean worktrees, and fast-forward safety, then advance local `main` to the
finalized candidate.
## Intent And Constraints
- Make no new product or architecture change. This task exists because the prior
integration task necessarily saw foreign task records in its merge-parent
history; the fresh base makes the final ownership audit meaningful without
rewriting history.
- Preserve all source branches, worktrees, untracked audit/report artifacts, and
ordinary merge commits. Do not rebase, reset, force-push, delete, or publish.
- Keep the two superseded Learning branches outside `main` and keep the active
product boundary at Code, Canvas, and Robot.
- Promote only local `main`; the user did not authorize a remote push.
## Project Context Loaded
- Read the prior integration task record, canonical current state, ADR-007,
ADR-008, decision index, architecture maps/flows, business rules, glossary,
commitments, and Integration Gate requirements from candidate `0fb1dac`.
- Confirmed the prior task already reconciled every completed product source and
ran focused/full unit, lint, typecheck, build, and targeted Electron gates.
- Other active task worktrees are source/audit histories already classified by
the prior task. This final task changes only its own record and local branch
placement, so no new semantic overlap remains.
- Gate result: Passed. The fresh task's drift check reports only this task-owned
record and holds the Integration lock.
## Outcome
- Finalized the reconciled integration candidate without altering product code.
- Confirmed all five accepted source commits and their ordinary merge commits are
ancestors of the candidate, while only the two superseded Learning refs remain
outside it.
- Advanced local `main` by fast-forward to this task's final commit; no history
was rewritten and no remote push was made.
## Verification
- Fresh `check_doc_drift.py` ownership check — passed.
- Inherited candidate verification at `0fb1dac`: typecheck passed; 184 focused
tests passed; full unit passed 1,882 with 3 skips plus pressure 1/1; lint had 0
errors and 5 existing warnings; all Vite targets built; targeted Electron E2E
passed 12/12.
- Source ancestry, `git diff --check`, candidate cleanliness, `main` fast-forward
relationship, final `main` equality, and remaining unmerged-branch inventory
were checked during promotion.
## Follow-ups
- Remote `origin/main` remains unchanged. Push only on a separate explicit user
request.
- Existing production/service/package commitments remain as recorded in
canonical project memory; this local merge does not satisfy them.
## Promotion Candidates
- None recorded.