diff --git a/.project-docs/30-worklog/tasks/20260907-finalize-merge-all-4d72c1.md b/.project-docs/30-worklog/tasks/20260907-finalize-merge-all-4d72c1.md new file mode 100644 index 0000000..23263dd --- /dev/null +++ b/.project-docs/30-worklog/tasks/20260907-finalize-merge-all-4d72c1.md @@ -0,0 +1,75 @@ +# Task: Finalize all changes main integration + +## Identity + +- Task ID: 20260907-finalize-merge-all-4d72c1 +- Mode: Integration +- Branch: codex/20260907-merge-all-changes-8f3c2a-merge-all-changes +- Worktree: /Users/inmanx/Documents/makelore-integrate-all-8f3c2a +- Base commit: 0fb1dac245b69966777edf4fc208840ae7af73bb +- Owner: codex +- Status: Completed + +## Scope + +- Close the project-document ownership gate from reconciled integration commit + `0fb1dac245b69966777edf4fc208840ae7af73bb`. +- Verify source-commit ancestry, the intentionally excluded historical branches, + clean worktrees, and fast-forward safety, then advance local `main` to the + finalized candidate. + +## Intent And Constraints + +- Make no new product or architecture change. This task exists because the prior + integration task necessarily saw foreign task records in its merge-parent + history; the fresh base makes the final ownership audit meaningful without + rewriting history. +- Preserve all source branches, worktrees, untracked audit/report artifacts, and + ordinary merge commits. Do not rebase, reset, force-push, delete, or publish. +- Keep the two superseded Learning branches outside `main` and keep the active + product boundary at Code, Canvas, and Robot. +- Promote only local `main`; the user did not authorize a remote push. + +## Project Context Loaded + +- Read the prior integration task record, canonical current state, ADR-007, + ADR-008, decision index, architecture maps/flows, business rules, glossary, + commitments, and Integration Gate requirements from candidate `0fb1dac`. +- Confirmed the prior task already reconciled every completed product source and + ran focused/full unit, lint, typecheck, build, and targeted Electron gates. +- Other active task worktrees are source/audit histories already classified by + the prior task. This final task changes only its own record and local branch + placement, so no new semantic overlap remains. +- Gate result: Passed. The fresh task's drift check reports only this task-owned + record and holds the Integration lock. + +## Outcome + +- Finalized the reconciled integration candidate without altering product code. +- Confirmed all five accepted source commits and their ordinary merge commits are + ancestors of the candidate, while only the two superseded Learning refs remain + outside it. +- Advanced local `main` by fast-forward to this task's final commit; no history + was rewritten and no remote push was made. + +## Verification + +- Fresh `check_doc_drift.py` ownership check — passed. +- Inherited candidate verification at `0fb1dac`: typecheck passed; 184 focused + tests passed; full unit passed 1,882 with 3 skips plus pressure 1/1; lint had 0 + errors and 5 existing warnings; all Vite targets built; targeted Electron E2E + passed 12/12. +- Source ancestry, `git diff --check`, candidate cleanliness, `main` fast-forward + relationship, final `main` equality, and remaining unmerged-branch inventory + were checked during promotion. + +## Follow-ups + +- Remote `origin/main` remains unchanged. Push only on a separate explicit user + request. +- Existing production/service/package commitments remain as recorded in + canonical project memory; this local merge does not satisfy them. + +## Promotion Candidates + +- None recorded.