77 lines
3.3 KiB
Markdown
77 lines
3.3 KiB
Markdown
# Task: Finalize repository pull integration
|
|
|
|
## Identity
|
|
|
|
- Task ID: 20260905-finalize-pull-integration-c49a71
|
|
- Mode: Integration
|
|
- Branch: main
|
|
- Worktree: /Users/inmanx/Documents/makelore
|
|
- Base commit: 8064add2420e5a2f571c1bb99e64589b66473c75
|
|
- Owner: codex
|
|
- Status: Ready for Integration
|
|
|
|
## Scope
|
|
|
|
- Close the project-document ownership gate from synchronized base
|
|
`8064add2420e5a2f571c1bb99e64589b66473c75`, which already contains the remote
|
|
merge and canonical reconciliation.
|
|
- Verify remote ancestry, ahead/behind state, Git whitespace, task-registry
|
|
consistency, and the final worktree without changing product behavior.
|
|
|
|
## Intent And Constraints
|
|
|
|
- Treat prior integration task `20260905-integrate-remote-main-b83d6f` and merge
|
|
`a2cb07f` as immutable source evidence.
|
|
- Make no additional canonical-document, product-code, package, deployment,
|
|
publication, push, rebase, reset, or history-rewrite change.
|
|
- Keep only this task's own record as new project documentation.
|
|
|
|
## Project Context Loaded
|
|
|
|
- Concurrent Task Gate: passed for this exact `main` worktree, Integration mode,
|
|
base commit, and exclusive integration lock.
|
|
- Planning Gate: passed after re-reading the active and source task records,
|
|
current integrated state, decision index, and system overview.
|
|
- Other active local tasks: none.
|
|
- Semantic-conflict assessment: none remains. ADR-008 and the Project Scaffold
|
|
integration coexist with the authoritative three-module product boundary and
|
|
retired Learning implementation.
|
|
|
|
## Outcome
|
|
|
|
- Confirmed that local `main` contains remote `origin/main@d642d76` as an ancestor
|
|
and preserves the ordinary two-parent merge `a2cb07f` plus documentation
|
|
reconciliation `8064add`.
|
|
- Confirmed that the two remote task records remain recoverable in remote parent
|
|
history but are absent from the current default tree, satisfying task-owned
|
|
document boundaries without changing their contents.
|
|
- Added no product or canonical state changes. This record is the only change made
|
|
from the fresh closure baseline.
|
|
|
|
## Verification
|
|
|
|
- `check_project_docs.py` passed before claiming the closure task.
|
|
- `git rev-list --left-right --count main...origin/main` returned `9 0` before
|
|
committing this final task record; local is not behind the fetched remote.
|
|
- `git merge-base --is-ancestor origin/main main` passed.
|
|
- `git show` confirmed merge `a2cb07f` has parents `53f3db3` and `d642d76`.
|
|
- `git diff --check origin/main..main` passed.
|
|
- `task_context.py doctor` reported a consistent task registry.
|
|
- `check_doc_drift.py --task-id 20260905-finalize-pull-integration-c49a71`
|
|
passed from the fresh post-merge baseline.
|
|
- Product verification is inherited unchanged from the immediately preceding
|
|
integration task: focused Vitest 228/228, canonical-path scaffold tests 12/12,
|
|
typecheck, full unit 1,859 with 3 skips plus pressure 1/1, lint 0 errors, Vite
|
|
production build, and targeted Electron E2E 1/1 all passed.
|
|
|
|
## Follow-ups
|
|
|
|
- The macOS `/var` versus `/private/var` copied-script test-path portability issue
|
|
and production Works Square migration `20260904_project_scaffold_0085` remain the
|
|
two explicit follow-ups recorded by the source integration task.
|
|
|
|
## Promotion Candidates
|
|
|
|
- None. Canonical reconciliation was completed by the source integration task;
|
|
this task only closes the ownership gate from a clean baseline.
|