docs: record remote main semantic conflict

This commit is contained in:
inman
2026-09-07 12:07:14 +08:00
parent 6366fc28dc
commit f53683a586

View File

@@ -0,0 +1,75 @@
# Task: Integrate remote main before push
## Identity
- Task ID: 20260907-integrate-remote-before-push-a4c9e27b
- Mode: Integration
- Branch: main
- Worktree: /Users/inmanx/Documents/makelore
- Base commit: 6366fc28dc81a71ac60a71becfeee781fcd8890e
- Owner: codex
- Status: Blocked pending human decision
## Scope
- Reconcile local `main@6366fc2` with fetched `origin/main@da29294`, preserving
the local cleanup/product history and the compatible remote product work.
- Resolve the one semantic conflict in Coding project entry/onboarding before
forming and pushing an ordinary two-parent merge.
- Exclude read-only source task records from any final integration changes when
required by the task-document ownership boundary, while keeping them reachable
through the remote merge parent.
## Intent And Constraints
- Never force-push or rewrite either history.
- Preserve `.makelore/project.json` authority, Electron Main/Renderer boundaries,
Pi `0.84.2`, the three enabled product modules, and the single light visual
system.
- Do not choose between contradictory product rules by timestamp, merge order,
or an automatic `ours`/`theirs` strategy.
- Do not modify canonical project memory or product files until the user resolves
the conflict.
## Outcome
- Fetched both histories and confirmed divergence of 14 remote-only and 28
local-only commits from their merge base.
- Read all ten remote task records and the local project-creation source record.
Remote official-plugin project scope, automatic game-resource delivery, Agent
Browser restoration, and Token Points V2 are compatible with the local product
direction.
- Found one contradictory product rule. Local source `af13aca` and its accepted
integration state require directory-only project creation, immediate `/chat`
entry, `initialized` as compatibility-only, and a non-blocking no-Agent setup
link. Remote source `8042d2b` integrated by `da29294` requires `initialized=true`
plus a fully configured enabled Agent before Conversation entry and makes the
first-Agent flow a required gate.
- Integration and push remain paused at the human-decision gate; no merge or
product/canonical edit has been made.
## Verification
- Concurrent Task Gate: passed; this worktree holds the exclusive integration
lock and no peer owns the repository.
- Remote fetch: passed; `origin/main` resolved to `da29294`.
- Divergence audit: 14 remote-only / 28 local-only commits.
- Source-record semantic review: completed for all remote-only task records and
local task `20260906-remove-project-gate-7c31`.
- Merge, product tests, typecheck, lint, build, and push: intentionally not run
while the semantic decision is unresolved.
## Follow-ups
- Human confirmation is required on whether the current local non-blocking
project-entry behavior remains authoritative or the remote required-Agent
readiness gate should replace it.
- After confirmation, merge and reconcile the chosen rule, run focused readiness
and onboarding tests plus repository-required typecheck/lint/build/full tests,
complete the project-doc integration gate, and push `main:main` normally.
## Promotion Candidates
- Pending integration after the conflict is resolved: promote only the chosen
project-entry/readiness invariant; compatible remote promotions retain their
verified scope and constraints.