Files
makelore/.project-docs/30-worklog/tasks/20260907-integrate-remote-before-push-a4c9e27b.md
T

3.3 KiB

Task: Integrate remote main before push

Identity

  • Task ID: 20260907-integrate-remote-before-push-a4c9e27b
  • Mode: Integration
  • Branch: main
  • Worktree: /Users/inmanx/Documents/makelore
  • Base commit: 6366fc28dc
  • Owner: codex
  • Status: Blocked pending human decision

Scope

  • Reconcile local main@6366fc2 with fetched origin/main@da29294, preserving the local cleanup/product history and the compatible remote product work.
  • Resolve the one semantic conflict in Coding project entry/onboarding before forming and pushing an ordinary two-parent merge.
  • Exclude read-only source task records from any final integration changes when required by the task-document ownership boundary, while keeping them reachable through the remote merge parent.

Intent And Constraints

  • Never force-push or rewrite either history.
  • Preserve .makelore/project.json authority, Electron Main/Renderer boundaries, Pi 0.84.2, the three enabled product modules, and the single light visual system.
  • Do not choose between contradictory product rules by timestamp, merge order, or an automatic ours/theirs strategy.
  • Do not modify canonical project memory or product files until the user resolves the conflict.

Outcome

  • Fetched both histories and confirmed divergence of 14 remote-only and 28 local-only commits from their merge base.
  • Read all ten remote task records and the local project-creation source record. Remote official-plugin project scope, automatic game-resource delivery, Agent Browser restoration, and Token Points V2 are compatible with the local product direction.
  • Found one contradictory product rule. Local source af13aca and its accepted integration state require directory-only project creation, immediate /chat entry, initialized as compatibility-only, and a non-blocking no-Agent setup link. Remote source 8042d2b integrated by da29294 requires initialized=true plus a fully configured enabled Agent before Conversation entry and makes the first-Agent flow a required gate.
  • Integration and push remain paused at the human-decision gate; no merge or product/canonical edit has been made.

Verification

  • Concurrent Task Gate: passed; this worktree holds the exclusive integration lock and no peer owns the repository.
  • Remote fetch: passed; origin/main resolved to da29294.
  • Divergence audit: 14 remote-only / 28 local-only commits.
  • Source-record semantic review: completed for all remote-only task records and local task 20260906-remove-project-gate-7c31.
  • Merge, product tests, typecheck, lint, build, and push: intentionally not run while the semantic decision is unresolved.

Follow-ups

  • Human confirmation is required on whether the current local non-blocking project-entry behavior remains authoritative or the remote required-Agent readiness gate should replace it.
  • After confirmation, merge and reconcile the chosen rule, run focused readiness and onboarding tests plus repository-required typecheck/lint/build/full tests, complete the project-doc integration gate, and push main:main normally.

Promotion Candidates

  • Pending integration after the conflict is resolved: promote only the chosen project-entry/readiness invariant; compatible remote promotions retain their verified scope and constraints.