docs: record PI-090 review pass

This commit is contained in:
2026-08-23 16:17:54 +08:00
parent f9e21195c1
commit 7680bfb0cf

View File

@@ -102,6 +102,11 @@
non-zero exit, or output-limit rejection non-fatal: the Main snapshot keeps
the changed relative path and status while omitting only the unavailable
diff. The regression uses the same `Git output is too large` failure shape.
- Final planner review of `f9e2119` passed with zero Standards findings and
zero Spec findings. Independent reproduction with a real 9 MiB tracked-file
diff confirmed that an output-limit failure preserves `{ path, status }`
while omitting only the unavailable diff. PI-090 is Done; the exact Ready
Frontier is `{PI-100, PI-105}`, with PI-105 recommended next.
- The packaged smoke now has two halves: a staged production-closure Pi
process check and a controlled Electron-Node authenticated bridge check that
actually executes browser status/screenshot attachment and game asset
@@ -119,6 +124,9 @@
- Final focused PI-090/Pi projection/bridge/game/resource suite: 12 files,
71 tests passed. The planner's five minimal failure shapes are also covered
by the final 4-file 20-test tracker/bridge/runtime subset.
- Final planner verification: focused 4-file/20-test subset, typecheck, scoped
ESLint, documentation drift, and diff checks all passed; the worktree was
clean at the reviewed implementation commit.
- Final serial full suite
(`corepack pnpm vitest run --maxWorkers=1 --no-file-parallelism`): 203 files,
2226 tests passed, 2 skipped. Two preceding parallel full-suite runs each