diff --git a/.project-docs/30-worklog/tasks/20260823-pi-product-tools-a9c4e7d2.md b/.project-docs/30-worklog/tasks/20260823-pi-product-tools-a9c4e7d2.md index f4fe064..25496b8 100644 --- a/.project-docs/30-worklog/tasks/20260823-pi-product-tools-a9c4e7d2.md +++ b/.project-docs/30-worklog/tasks/20260823-pi-product-tools-a9c4e7d2.md @@ -102,6 +102,11 @@ non-zero exit, or output-limit rejection non-fatal: the Main snapshot keeps the changed relative path and status while omitting only the unavailable diff. The regression uses the same `Git output is too large` failure shape. +- Final planner review of `f9e2119` passed with zero Standards findings and + zero Spec findings. Independent reproduction with a real 9 MiB tracked-file + diff confirmed that an output-limit failure preserves `{ path, status }` + while omitting only the unavailable diff. PI-090 is Done; the exact Ready + Frontier is `{PI-100, PI-105}`, with PI-105 recommended next. - The packaged smoke now has two halves: a staged production-closure Pi process check and a controlled Electron-Node authenticated bridge check that actually executes browser status/screenshot attachment and game asset @@ -119,6 +124,9 @@ - Final focused PI-090/Pi projection/bridge/game/resource suite: 12 files, 71 tests passed. The planner's five minimal failure shapes are also covered by the final 4-file 20-test tracker/bridge/runtime subset. +- Final planner verification: focused 4-file/20-test subset, typecheck, scoped + ESLint, documentation drift, and diff checks all passed; the worktree was + clean at the reviewed implementation commit. - Final serial full suite (`corepack pnpm vitest run --maxWorkers=1 --no-file-parallelism`): 203 files, 2226 tests passed, 2 skipped. Two preceding parallel full-suite runs each