51 lines
2.6 KiB
Markdown
51 lines
2.6 KiB
Markdown
# Task: Integrate Next and Go architecture design into main
|
|
|
|
## Identity
|
|
|
|
- Task ID: 20260812-integrate-go-design-c12e7b
|
|
- Mode: Integration
|
|
- Branch: codex/20260812-integrate-go-design-c12e7b-integrate-go-design
|
|
- Worktree: D:\Datas\OthersProjects\NianAIGC-go-docs-integration-c12e7b
|
|
- Base commit: a235266bed8f1a7e19518cdd3aa5ed3e0a309b82
|
|
- Owner: codex
|
|
- Status: Superseded by final validation task
|
|
|
|
## Scope
|
|
|
|
- Integrate the approved Next.js frontend plus Go backend design and the explicit implementation progress into canonical project memory.
|
|
- Preserve the distinction between the implemented ACK-001 topology and the accepted-but-unimplemented ADR-003 target.
|
|
- Merge documentation only; exclude all interrupted Go, Docker, Compose, ACK, package, SQL, and application drafts.
|
|
|
|
## Intent And Constraints
|
|
|
|
- The user explicitly requested design and progress documentation only, merged to `main`.
|
|
- Promote the human-confirmed architecture without claiming that the Go backend exists.
|
|
- Retain RDS-001 and RDS-002; mark ACK-001 as current transition state until implementation and cutover.
|
|
- Preserve the occupied `main` worktree's unrelated untracked runtime configuration task record.
|
|
|
|
## Outcome
|
|
|
|
- Added ADR-003 as an accepted target with implementation pending.
|
|
- Added current-versus-target sections to system overview, module map, and data flow.
|
|
- Updated current state, task history, decision index, and commitments with explicit not-implemented progress.
|
|
- Integrated the feature task record and detailed architecture proposal.
|
|
- No runtime, application, database, build, package, or deployment file changed.
|
|
- The first drift check correctly reported that source task-owned records were introduced after this task's recorded base. The prepared canonical state will be committed as a fixed read-only base, this integration lock released, and a fresh Integration Gate task will perform final validation without treating source records as integration-owned edits.
|
|
|
|
## Verification
|
|
|
|
- Source documentation commit `ed60e74` was cherry-picked as `4485899` onto the integration base.
|
|
- Source feature drift check passed before completion.
|
|
- Canonical changes preserve current ACK-001 facts while recording ADR-003 as future target.
|
|
- Initial integration drift check: blocked on source-record base ordering, not on document content.
|
|
- A fresh Integration Gate based on the fixed source/canonical candidate commit is required before merging `main`.
|
|
|
|
## Follow-ups
|
|
|
|
- Implement ADR-003 in a separate future task only after compatibility tests are executable.
|
|
- Live RDS/ACK/OSS/provider validation remains outside this documentation-only integration.
|
|
|
|
## Promotion Candidates
|
|
|
|
- None recorded.
|