# Task: Integrate Next and Go architecture design into main ## Identity - Task ID: 20260812-integrate-go-design-c12e7b - Mode: Integration - Branch: codex/20260812-integrate-go-design-c12e7b-integrate-go-design - Worktree: D:\Datas\OthersProjects\NianAIGC-go-docs-integration-c12e7b - Base commit: a235266bed8f1a7e19518cdd3aa5ed3e0a309b82 - Owner: codex - Status: Superseded by final validation task ## Scope - Integrate the approved Next.js frontend plus Go backend design and the explicit implementation progress into canonical project memory. - Preserve the distinction between the implemented ACK-001 topology and the accepted-but-unimplemented ADR-003 target. - Merge documentation only; exclude all interrupted Go, Docker, Compose, ACK, package, SQL, and application drafts. ## Intent And Constraints - The user explicitly requested design and progress documentation only, merged to `main`. - Promote the human-confirmed architecture without claiming that the Go backend exists. - Retain RDS-001 and RDS-002; mark ACK-001 as current transition state until implementation and cutover. - Preserve the occupied `main` worktree's unrelated untracked runtime configuration task record. ## Outcome - Added ADR-003 as an accepted target with implementation pending. - Added current-versus-target sections to system overview, module map, and data flow. - Updated current state, task history, decision index, and commitments with explicit not-implemented progress. - Integrated the feature task record and detailed architecture proposal. - No runtime, application, database, build, package, or deployment file changed. - The first drift check correctly reported that source task-owned records were introduced after this task's recorded base. The prepared canonical state will be committed as a fixed read-only base, this integration lock released, and a fresh Integration Gate task will perform final validation without treating source records as integration-owned edits. ## Verification - Source documentation commit `ed60e74` was cherry-picked as `4485899` onto the integration base. - Source feature drift check passed before completion. - Canonical changes preserve current ACK-001 facts while recording ADR-003 as future target. - Initial integration drift check: blocked on source-record base ordering, not on document content. - A fresh Integration Gate based on the fixed source/canonical candidate commit is required before merging `main`. ## Follow-ups - Implement ADR-003 in a separate future task only after compatibility tests are executable. - Live RDS/ACK/OSS/provider validation remains outside this documentation-only integration. ## Promotion Candidates - None recorded.