Files
makelore/.project-docs/30-worklog/tasks/20260819-promote-design-freeze-main-91c2e4.md
T
brother7 1907924203
Electron E2E / Electron E2E (macos-latest) (push) Has been cancelled
Electron E2E / Electron E2E (ubuntu-latest) (push) Has been cancelled
Electron E2E / Electron E2E (windows-latest) (push) Has been cancelled
docs(integration): record main promotion
2026-08-19 13:08:06 +08:00

44 lines
2.4 KiB
Markdown

# Task: Promote AI design freeze fix to main
## Identity
- Task ID: 20260819-promote-design-freeze-main-91c2e4
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 9ff79e96813ebadade0aecb8f407edf5aee0144a
- Owner: codex-root
- Status: Completed
## Scope
- Fast-forward `main` from `9ff79e96813ebadade0aecb8f407edf5aee0144a` to the verified integration branch `codex/20260819-integrate-design-freeze-3f8b7c-integrate-design-freeze`.
- Record and verify the exact promoted commit without changing the already-reviewed implementation or canonical decisions.
## Intent And Constraints
- Preserve the complete native password/SMS login, temporary `disable-http2`, AI Design 30-second request/token-refresh deadline, and safe-read-only low-level fetch fallback.
- Perform only a fast-forward promotion; do not rewrite history or discard unrelated work.
- Keep installed-client Quote retry/confirm smoke and the permanent HTTP/2 policy as explicit follow-ups.
## Outcome
- `main` fast-forwarded without conflict from `9ff79e96813ebadade0aecb8f407edf5aee0144a` to verified integration commit `5bff5d3`.
- The default branch now contains native password/SMS login, temporary `disable-http2`, bounded AI Design Workspace/token-refresh requests, and no implicit mutation replay through low-level transport fallback.
- The integration task's owned record remains on its integration branch and is excluded from `main` as required by project-doc ownership boundaries; durable facts are present in canonical project memory.
## Verification
- Fast-forward-only merge — PASS; no conflicts or history rewrite.
- Promoted integration verification — 7 files / 134 focused tests, 184 files / 2190 full tests, typecheck, lint with 0 errors / 7 existing warnings, and Renderer/Main/Preload/utility production build all passed before promotion.
- Final branch identity, whitespace, project-doc integrity, and task-aware drift checks pending after this task record is committed.
## Follow-ups
- Run installed-client real-account Quote PATCH / retry quote / continue-adjusting smoke and verify a stalled request releases the UI within 30 seconds without blocking unrelated calls.
- Restore HTTP/2 for a controlled comparison after the finite-lifecycle fix is confirmed; keep `disable-http2` temporary until that evidence exists.
## Promotion Candidates
- None. Canonical promotion was completed in integration commit `5bff5d3` before the fast-forward.