Files
makelore/.project-docs/30-worklog/tasks/20260907-merge-all-changes-8f3c2a.md
T

166 lines
8.8 KiB
Markdown

# Task: Merge all completed changes into main
## Identity
- Task ID: 20260907-merge-all-changes-8f3c2a
- Mode: Integration
- Branch: codex/20260907-merge-all-changes-8f3c2a-merge-all-changes
- Worktree: /Users/inmanx/Documents/makelore-integrate-all-8f3c2a
- Base commit: f8eee430f4f4167dc2ecc682ece96c652cdde14b
- Owner: codex
- Status: Transferred to Final Integration Gate
## Scope
- Inventory every local worktree and branch against `main`, then integrate all
completed, current-product changes into one reviewed candidate.
- Reconcile the overlapping September 6 Code, Project Configuration, Plugin,
and Canvas changes semantically rather than by file-order preference.
- Promote accepted task facts into canonical project memory, run the required
verification, and advance the local `main` branch without rewriting history.
## Intent And Constraints
- Preserve the Code, Canvas, and Robot product boundary. Do not restore the
retired Learning module, the retired Prompt Museum product route, or other
superseded historical branches merely because their refs still exist.
- Preserve Main-owned backend/runtime authority, `.makelore` project ownership,
the single light visual system, and ADR-007/ADR-008 trust boundaries.
- Treat the latest explicit user direction as authoritative where completed
Canvas explorations differ: Works remains on the right and the implemented
prompt/reference plan supersedes the earlier left-rail concept.
- Preserve source histories with ordinary commits/merges; do not reset, rebase,
force-push, delete worktrees, or discard unknown changes.
## Project Context Loaded
Task context:
- Task ID: `20260907-merge-all-changes-8f3c2a`
- Mode: Integration
- Branch: `codex/20260907-merge-all-changes-8f3c2a-merge-all-changes`
- Worktree: `/Users/inmanx/Documents/makelore-integrate-all-8f3c2a`
- Base commit: `f8eee430f4f4167dc2ecc682ece96c652cdde14b`
- Other active local tasks: nine September 6 feature/audit tasks and the
September 5 development-start task reported by `task_context.py status`.
- Overlap or semantic-conflict assessment: Plugin rehoming, project-gate
removal, and the Coding landing page overlap in App/Sidebar/configuration
paths but express compatible confirmed behavior. Canvas inspiration removal
overlaps the implemented right-Works/reference-plan redesign and must be
reconciled. The earlier left-Works concept is explicitly superseded by the
later right-Works direction; the audit's unconfirmed stage proposal is not a
canonical promotion source. No unresolved product-direction conflict remains.
Read:
- `.project-docs/05-agent-entry/{read-before-planning,memory-index,planning-gate,integration-gate}.md`
- `.project-docs/00-brief/{project-positioning,success-criteria}.md`
- `.project-docs/30-worklog/current-state.md` and every active peer task record
- `.project-docs/10-decisions/{decision-index,adr-007-ai-design-living-form-v2,adr-008-interactive-ai-app-scaffold}.md`
- `.project-docs/20-architecture/{system-overview,module-map,data-flow}.md`
- `.project-docs/40-domain/{business-rules,glossary}.md`
- `.project-docs/80-commitments/commitments.md`
- `.project-docs/90-maintenance/{stale-items,doc-update-policy}.md`
- The Plugin navigation task-owned decision proposal.
Relevant understanding:
- Project goal: ship one Electron product with Code, Canvas, and Robot while
keeping Renderer access behind Main-owned APIs and project state in
`.makelore`.
- Current integrated focus: a conversation-first Canvas governed by one Current
Specification and immutable Quotes, a Pi-only Code runtime, and minimal
interactive-AI project creation with an optional explicit Scaffold Skill.
- Active task scope: consolidate all completed current-product local changes,
reconcile canonical memory, verify the result, and promote it to local main.
- Active constraints: preserve history and unknown work, keep Learning retired,
avoid direct Renderer IPC/runtime access, and do not change backend contracts
incidentally.
- Decisions affecting this task: ADR-007 controls Canvas semantic authority;
ADR-008 controls project creation/Scaffold/release authority and is amended by
the confirmed simplified user-facing setup flow.
- Evidence, reflections, or commitments affecting this task: source task
verification is strong, but production service/package gates remain pending;
Prompt Museum's mixed commitment must retain Canvas deletion/re-Quote checks
while dropping the retired Museum UI smoke.
- Files or modules likely involved: `src/App.tsx`, layout/sidebar/title-bar,
Project Configuration and Plugins pages, Code chat entry, Canvas page/store
components, focused unit/Electron tests, README, and canonical project docs.
- Unknowns, stale docs, or conflicts: several ready-for-integration branches may
still hold uncommitted work; old local branch refs include explicitly
superseded Learning work and must be classified rather than blindly merged.
Gate result:
- Passed.
## Outcome
- Inventoried every local worktree and branch against `main`, including dirty
feature worktrees, audit-only artifacts, and historical refs. Committed each
completed product source in its owning worktree before integration:
`af13aca` (project gate), `ce90f57` (Code landing), `be1764e` (Plugin
rehoming), `1562a49` (Canvas plan/reference redesign), and `b22559a`
(Canvas inspiration removal). The existing startup record was preserved as
`1dfa922` on `main`.
- Integrated those sources with ordinary merges `39d7b7e`, `a91c7e3`,
`f6c5961`, `ea1219c`, and `e069ec6`. Conflict resolutions preserve the
directory-only project flow, direct valid-project chat entry, no-Agent empty
state, Project Configuration-owned Plugin sheet, right-side Canvas Works rail,
central active plan, editable final Prompt/reference aliases, and retired
Prompt Museum Renderer surface.
- Reconciled overlapping files semantically. In particular, the new
`DesignWorksRail` also had its inspiration action removed even though that file
did not exist on the inspiration-removal source branch; the Plugin sheet keeps
Project Configuration mounted without restoring duplicate Plugin Services;
and valid projects no longer branch on the legacy `initialized` Boolean.
- Fixed two integration-only verification defects: restored the missing `Bot`
icon import in the Code empty-Agent state, and made the Canvas unit fixture
establish a complete authenticated identity. Updated Electron journeys whose
assertions still assumed pre-integration project routing, Canvas shell, or
non-exact accessible names.
- Promoted accepted facts into README, ADR-007, ADR-008, the decision index,
architecture maps/flows, business rules, glossary, commitments, and current
state. Prompt Museum production smoke was removed from the mixed commitment
while Canvas reference/re-Quote/deletion smoke remains pending.
- Excluded `codex/20260903-remove-learning-7a91` and
`codex/learning-player-release-fix`: both are historical Learning refs
superseded by the already integrated complete Learning removal and would
violate the current Code/Canvas/Robot boundary. Unconfirmed Canvas audit
concepts, generated reports, and source-worktree artifacts were also left
uncommitted and untouched.
## Verification
- `corepack pnpm install --frozen-lockfile` — passed with pinned pnpm 10.33.4.
- `corepack pnpm run typecheck` — passed.
- Focused Vitest across 15 affected files — 184/184 passed.
- `corepack pnpm test` — 223 ordinary files, 1,882 passed and 3 skipped;
isolated pressure suite 1/1 passed.
- `corepack pnpm run lint:check` — 0 errors; 5 pre-existing warnings remain in
`src/pages/Home/index.tsx` and `src/pages/Makelore/index.tsx`.
- `corepack pnpm run build:vite` — Renderer, Electron Main, Preload, and release
utility worker builds passed; only existing Browserslist, mixed-import, and
chunk-size warnings were emitted.
- Targeted Electron E2E across Code identity/navigation, Project Configuration,
Plugin lifecycle/navigation, and Canvas — 12/12 passed.
- `git diff --check` passed after conflict and follow-up fixes.
## Follow-ups
- Existing production/install gates remain unchanged: real-account Canvas V2
reference/Quote/deletion smoke, Plugin server availability, signed platform
packages, and the source+built+contract publication chain are still external
follow-ups. This integration does not claim them.
- Local `main` promotion is in scope for this task. Remote push is not authorized
by the user's request and is not performed.
- Because the ownership checker audits every merge-parent change since this
task's pre-merge base, its expected foreign-task-record finding is transferred
to fresh Integration task `20260907-finalize-merge-all-4d72c1`, based on this
reconciled candidate. No history is rewritten to bypass that audit.
## Promotion Candidates
- None. This Integration task applies the reviewed source-task outcomes directly
to canonical project memory.