166 lines
8.8 KiB
Markdown
166 lines
8.8 KiB
Markdown
# Task: Merge all completed changes into main
|
|
|
|
## Identity
|
|
|
|
- Task ID: 20260907-merge-all-changes-8f3c2a
|
|
- Mode: Integration
|
|
- Branch: codex/20260907-merge-all-changes-8f3c2a-merge-all-changes
|
|
- Worktree: /Users/inmanx/Documents/makelore-integrate-all-8f3c2a
|
|
- Base commit: f8eee430f4f4167dc2ecc682ece96c652cdde14b
|
|
- Owner: codex
|
|
- Status: Transferred to Final Integration Gate
|
|
|
|
## Scope
|
|
|
|
- Inventory every local worktree and branch against `main`, then integrate all
|
|
completed, current-product changes into one reviewed candidate.
|
|
- Reconcile the overlapping September 6 Code, Project Configuration, Plugin,
|
|
and Canvas changes semantically rather than by file-order preference.
|
|
- Promote accepted task facts into canonical project memory, run the required
|
|
verification, and advance the local `main` branch without rewriting history.
|
|
|
|
## Intent And Constraints
|
|
|
|
- Preserve the Code, Canvas, and Robot product boundary. Do not restore the
|
|
retired Learning module, the retired Prompt Museum product route, or other
|
|
superseded historical branches merely because their refs still exist.
|
|
- Preserve Main-owned backend/runtime authority, `.makelore` project ownership,
|
|
the single light visual system, and ADR-007/ADR-008 trust boundaries.
|
|
- Treat the latest explicit user direction as authoritative where completed
|
|
Canvas explorations differ: Works remains on the right and the implemented
|
|
prompt/reference plan supersedes the earlier left-rail concept.
|
|
- Preserve source histories with ordinary commits/merges; do not reset, rebase,
|
|
force-push, delete worktrees, or discard unknown changes.
|
|
|
|
## Project Context Loaded
|
|
|
|
Task context:
|
|
|
|
- Task ID: `20260907-merge-all-changes-8f3c2a`
|
|
- Mode: Integration
|
|
- Branch: `codex/20260907-merge-all-changes-8f3c2a-merge-all-changes`
|
|
- Worktree: `/Users/inmanx/Documents/makelore-integrate-all-8f3c2a`
|
|
- Base commit: `f8eee430f4f4167dc2ecc682ece96c652cdde14b`
|
|
- Other active local tasks: nine September 6 feature/audit tasks and the
|
|
September 5 development-start task reported by `task_context.py status`.
|
|
- Overlap or semantic-conflict assessment: Plugin rehoming, project-gate
|
|
removal, and the Coding landing page overlap in App/Sidebar/configuration
|
|
paths but express compatible confirmed behavior. Canvas inspiration removal
|
|
overlaps the implemented right-Works/reference-plan redesign and must be
|
|
reconciled. The earlier left-Works concept is explicitly superseded by the
|
|
later right-Works direction; the audit's unconfirmed stage proposal is not a
|
|
canonical promotion source. No unresolved product-direction conflict remains.
|
|
|
|
Read:
|
|
|
|
- `.project-docs/05-agent-entry/{read-before-planning,memory-index,planning-gate,integration-gate}.md`
|
|
- `.project-docs/00-brief/{project-positioning,success-criteria}.md`
|
|
- `.project-docs/30-worklog/current-state.md` and every active peer task record
|
|
- `.project-docs/10-decisions/{decision-index,adr-007-ai-design-living-form-v2,adr-008-interactive-ai-app-scaffold}.md`
|
|
- `.project-docs/20-architecture/{system-overview,module-map,data-flow}.md`
|
|
- `.project-docs/40-domain/{business-rules,glossary}.md`
|
|
- `.project-docs/80-commitments/commitments.md`
|
|
- `.project-docs/90-maintenance/{stale-items,doc-update-policy}.md`
|
|
- The Plugin navigation task-owned decision proposal.
|
|
|
|
Relevant understanding:
|
|
|
|
- Project goal: ship one Electron product with Code, Canvas, and Robot while
|
|
keeping Renderer access behind Main-owned APIs and project state in
|
|
`.makelore`.
|
|
- Current integrated focus: a conversation-first Canvas governed by one Current
|
|
Specification and immutable Quotes, a Pi-only Code runtime, and minimal
|
|
interactive-AI project creation with an optional explicit Scaffold Skill.
|
|
- Active task scope: consolidate all completed current-product local changes,
|
|
reconcile canonical memory, verify the result, and promote it to local main.
|
|
- Active constraints: preserve history and unknown work, keep Learning retired,
|
|
avoid direct Renderer IPC/runtime access, and do not change backend contracts
|
|
incidentally.
|
|
- Decisions affecting this task: ADR-007 controls Canvas semantic authority;
|
|
ADR-008 controls project creation/Scaffold/release authority and is amended by
|
|
the confirmed simplified user-facing setup flow.
|
|
- Evidence, reflections, or commitments affecting this task: source task
|
|
verification is strong, but production service/package gates remain pending;
|
|
Prompt Museum's mixed commitment must retain Canvas deletion/re-Quote checks
|
|
while dropping the retired Museum UI smoke.
|
|
- Files or modules likely involved: `src/App.tsx`, layout/sidebar/title-bar,
|
|
Project Configuration and Plugins pages, Code chat entry, Canvas page/store
|
|
components, focused unit/Electron tests, README, and canonical project docs.
|
|
- Unknowns, stale docs, or conflicts: several ready-for-integration branches may
|
|
still hold uncommitted work; old local branch refs include explicitly
|
|
superseded Learning work and must be classified rather than blindly merged.
|
|
|
|
Gate result:
|
|
|
|
- Passed.
|
|
|
|
## Outcome
|
|
|
|
- Inventoried every local worktree and branch against `main`, including dirty
|
|
feature worktrees, audit-only artifacts, and historical refs. Committed each
|
|
completed product source in its owning worktree before integration:
|
|
`af13aca` (project gate), `ce90f57` (Code landing), `be1764e` (Plugin
|
|
rehoming), `1562a49` (Canvas plan/reference redesign), and `b22559a`
|
|
(Canvas inspiration removal). The existing startup record was preserved as
|
|
`1dfa922` on `main`.
|
|
- Integrated those sources with ordinary merges `39d7b7e`, `a91c7e3`,
|
|
`f6c5961`, `ea1219c`, and `e069ec6`. Conflict resolutions preserve the
|
|
directory-only project flow, direct valid-project chat entry, no-Agent empty
|
|
state, Project Configuration-owned Plugin sheet, right-side Canvas Works rail,
|
|
central active plan, editable final Prompt/reference aliases, and retired
|
|
Prompt Museum Renderer surface.
|
|
- Reconciled overlapping files semantically. In particular, the new
|
|
`DesignWorksRail` also had its inspiration action removed even though that file
|
|
did not exist on the inspiration-removal source branch; the Plugin sheet keeps
|
|
Project Configuration mounted without restoring duplicate Plugin Services;
|
|
and valid projects no longer branch on the legacy `initialized` Boolean.
|
|
- Fixed two integration-only verification defects: restored the missing `Bot`
|
|
icon import in the Code empty-Agent state, and made the Canvas unit fixture
|
|
establish a complete authenticated identity. Updated Electron journeys whose
|
|
assertions still assumed pre-integration project routing, Canvas shell, or
|
|
non-exact accessible names.
|
|
- Promoted accepted facts into README, ADR-007, ADR-008, the decision index,
|
|
architecture maps/flows, business rules, glossary, commitments, and current
|
|
state. Prompt Museum production smoke was removed from the mixed commitment
|
|
while Canvas reference/re-Quote/deletion smoke remains pending.
|
|
- Excluded `codex/20260903-remove-learning-7a91` and
|
|
`codex/learning-player-release-fix`: both are historical Learning refs
|
|
superseded by the already integrated complete Learning removal and would
|
|
violate the current Code/Canvas/Robot boundary. Unconfirmed Canvas audit
|
|
concepts, generated reports, and source-worktree artifacts were also left
|
|
uncommitted and untouched.
|
|
|
|
## Verification
|
|
|
|
- `corepack pnpm install --frozen-lockfile` — passed with pinned pnpm 10.33.4.
|
|
- `corepack pnpm run typecheck` — passed.
|
|
- Focused Vitest across 15 affected files — 184/184 passed.
|
|
- `corepack pnpm test` — 223 ordinary files, 1,882 passed and 3 skipped;
|
|
isolated pressure suite 1/1 passed.
|
|
- `corepack pnpm run lint:check` — 0 errors; 5 pre-existing warnings remain in
|
|
`src/pages/Home/index.tsx` and `src/pages/Makelore/index.tsx`.
|
|
- `corepack pnpm run build:vite` — Renderer, Electron Main, Preload, and release
|
|
utility worker builds passed; only existing Browserslist, mixed-import, and
|
|
chunk-size warnings were emitted.
|
|
- Targeted Electron E2E across Code identity/navigation, Project Configuration,
|
|
Plugin lifecycle/navigation, and Canvas — 12/12 passed.
|
|
- `git diff --check` passed after conflict and follow-up fixes.
|
|
|
|
## Follow-ups
|
|
|
|
- Existing production/install gates remain unchanged: real-account Canvas V2
|
|
reference/Quote/deletion smoke, Plugin server availability, signed platform
|
|
packages, and the source+built+contract publication chain are still external
|
|
follow-ups. This integration does not claim them.
|
|
- Local `main` promotion is in scope for this task. Remote push is not authorized
|
|
by the user's request and is not performed.
|
|
- Because the ownership checker audits every merge-parent change since this
|
|
task's pre-merge base, its expected foreign-task-record finding is transferred
|
|
to fresh Integration task `20260907-finalize-merge-all-4d72c1`, based on this
|
|
reconciled candidate. No history is rewritten to bypass that audit.
|
|
|
|
## Promotion Candidates
|
|
|
|
- None. This Integration task applies the reviewed source-task outcomes directly
|
|
to canonical project memory.
|