Files
makelore/.project-docs/30-worklog/tasks/20260907-integrate-remote-before-push-a4c9e27b.md
T
inman 918f8f80dc
Electron E2E / Electron E2E (macos-latest) (push) Has been cancelled
Electron E2E / Electron E2E (ubuntu-latest) (push) Has been cancelled
Electron E2E / Electron E2E (windows-latest) (push) Has been cancelled
Merge origin/main and preserve nonblocking project entry
2026-09-07 12:53:55 +08:00

88 lines
4.2 KiB
Markdown

# Task: Integrate remote main before push
## Identity
- Task ID: 20260907-integrate-remote-before-push-a4c9e27b
- Mode: Integration
- Branch: main
- Worktree: /Users/inmanx/Documents/makelore
- Base commit: 6366fc28dc81a71ac60a71becfeee781fcd8890e
- Owner: codex
- Status: Ready for integration gate
## Scope
- Reconcile local `main@6366fc2` with fetched `origin/main@da29294`, preserving
the local cleanup/product history and the compatible remote product work.
- Resolve the one semantic conflict in Coding project entry/onboarding before
forming and pushing an ordinary two-parent merge.
- Exclude read-only source task records from any final integration changes when
required by the task-document ownership boundary, while keeping them reachable
through the remote merge parent.
## Intent And Constraints
- Never force-push or rewrite either history.
- Preserve `.makelore/project.json` authority, Electron Main/Renderer boundaries,
Pi `0.84.2`, the three enabled product modules, and the single light visual
system.
- Do not choose between contradictory product rules by timestamp, merge order,
or an automatic `ours`/`theirs` strategy.
- The user confirmed on 2026-09-07 that the local non-blocking project-entry
behavior remains authoritative; reconcile all affected code, tests, and
canonical memory to that decision.
## Outcome
- Fetched both histories and confirmed divergence of 14 remote-only and 29
local-only commits from their merge base.
- Read all ten remote task records and the local project-creation source record.
Remote official-plugin project scope, automatic game-resource delivery, Agent
Browser restoration, and Token Points V2 are compatible with the local product
direction.
- Found one contradictory product rule. Local source `af13aca` and its accepted
integration state require directory-only project creation, immediate `/chat`
entry, `initialized` as compatibility-only, and a non-blocking no-Agent setup
link. Remote source `8042d2b` integrated by `da29294` requires `initialized=true`
plus a fully configured enabled Agent before Conversation entry and makes the
first-Agent flow a required gate.
- The user confirmed directory-only creation, immediate `/chat`, non-blocking
no-Agent setup, and compatibility-only `initialized` as authoritative.
- Started an ordinary `--no-commit --no-ff` merge of `origin/main@da29294`.
The semantic resolution rejects the remote required-Agent readiness gate and
retains the compatible official project-wide Plugin activation, automatic
Game Resource delivery, Agent Browser restoration, and Token Points V2.
- Removed the remote-only task-record copies from the final tree without editing
them; they remain reachable through the remote merge parent.
## Verification
- Concurrent Task Gate: passed; this worktree holds the exclusive integration
lock and no peer owns the repository.
- Remote fetch: passed; `origin/main` resolved to `da29294`.
- Divergence audit at merge start: 14 remote-only / 29 local-only commits.
- Source-record semantic review: completed for all remote-only task records and
local task `20260906-remove-project-gate-7c31`.
- Conflict-marker and whitespace checks: passed after semantic resolution.
- Typecheck: passed with the exact pinned `pnpm@10.33.4` via Corepack.
- Focused unit tests: 346 passed and one Plugin-copy expectation failed; the
copy was aligned without changing behavior and its 17-test file then passed.
- Full unit suite: 226 files / 1,912 passed / 3 skipped; the isolated pressure
suite passed 1/1.
- Lint: passed with 0 errors and 5 pre-existing warnings.
- Production Vite build: passed for Renderer, Main, Preload, and utility worker.
- Targeted Electron E2E: 6/6 passed across first-chat/runtime behavior, Agent
Browser UI, project-config Skill details, and project-wide Plugin enablement.
- Project-doc gates, merge commit, remote race check, and push remain pending.
## Follow-ups
- Complete the project-doc integration gates, ordinary merge commit, remote race
check, and normal `main:main` push.
## Promotion Candidates
- Promote the confirmed non-blocking project-entry invariant together with the
compatible project-wide official Plugin, Game Resource delivery, Agent Browser,
and Token Points V2 boundaries recorded in the canonical documents.