Files
makelore/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md

159 lines
7.7 KiB
Markdown

# Task: 拉取远程主分支、合并并推送
## Identity
- Task ID: 20260813-sync-push-main-9c2f71
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9
- Owner: codex
- Status: In Progress
## Scope
- Fetch the authoritative remote `main`, inspect all commits not present in the
local branch, and merge them into the reviewed local `main` without rewriting
either history.
- Resolve any code or project-memory conflicts semantically, re-run verification
proportionate to the fetched changes, obtain an independent final review, and
push the resulting `main` to its configured remote.
- Record the exact fetched remote tip, merge topology, verification, and push
result in this task record.
## Intent And Constraints
- Do not rebase, reset, stash, force-push, or discard either local or remote
commits. The user authorized a normal pull/merge/push workflow.
- Treat the current `origin/main` value as a stale local tracking reference until
`git fetch origin main` succeeds.
- Preserve the already reviewed Updater and image-to-image behavior and the
repository's Main-owned security boundaries.
- Source/peer task records remain read-only. This integration task may update
only its own task record and any canonical documents that genuinely require
semantic reconciliation.
- Push only after the merge result is clean, verified, and independently
reviewed. Never use `--force`.
## Project Context Loaded
Task context:
- Task ID: `20260813-sync-push-main-9c2f71`
- Mode: Integration
- Branch: `main`
- Worktree: `D:\Datas\OthersProjects\makelore`
- Base commit: `4fbd1d3b24493532ce479729da2c5e5e1709c8a9`
- Other active local tasks: all are isolated in separate registered worktrees;
their Scope, Intent And Constraints, and Promotion Candidates were reviewed.
- Overlap or semantic-conflict assessment: no peer owns this worktree or has an
unresolved decision that changes this synchronization plan. Remote overlap
remains unknown until fetch and will be inspected before merge.
Read:
- `.project-docs/05-agent-entry/read-before-planning.md`
- `.project-docs/05-agent-entry/memory-index.md`
- this active task record
- `.project-docs/00-brief/project-positioning.md`
- `.project-docs/30-worklog/current-state.md`
- `.project-docs/10-decisions/decision-index.md`
- `.project-docs/20-architecture/system-overview.md`
- `.project-docs/05-agent-entry/integration-gate.md`
- `.project-docs/50-evidence/evidence-index.md`
- `.project-docs/60-reflection/reflection-index.md`
- `.project-docs/80-commitments/commitments.md`
- `.project-docs/90-maintenance/stale-items.md`
- all registry-owned peer task records through the required planning sections
Relevant understanding:
- Project goal: keep the reviewed local Makelore client history while
incorporating legitimate remote `main` work and publishing one coherent tip.
- Current integrated focus: local `main` already contains the reviewed Updater
and single-reference image-to-image changes; external production smoke remains
pending and must not be overclaimed by this Git synchronization.
- Active constraints: preserve Main-owned updater/workspace boundaries, existing
canonical decisions, and source task records; push must be non-forced.
- Evidence and commitments: the local tip passed 84 focused tests, typecheck,
scoped lint, `build:vite`, project-document gates, and independent Sol review;
three full-suite failures match the documented pre-existing baseline.
- Unknowns: the latest remote tip and its semantic overlap are not verified
until fetch.
Gate result:
- Passed.
## Plan
1. Commit this integration ownership record, fetch `origin/main`, and inspect
remote-only commits, paths, and topology.
2. Merge `origin/main` normally with local `main` as first parent; resolve any
conflict semantically and inspect the combined tree.
3. Run focused/full checks required by the fetched changes plus project-document
gates, then obtain a final independent Sol PASS/FAIL review.
4. Complete documentation, push `main` without force, verify local/remote tip
equality, and release the clean integration task.
## Outcome
- `git fetch origin main --prune` resolved the authoritative remote tip to
`f4113a872f7cd6aee6829c9597c882846bc4085b`. The histories had diverged at
`253bad8b40c8cd20a25362006f5d80a4e5c4cd4a`: local `main` contained 18
integration/preparation commits not on the remote, while the remote contained
one consolidation commit not on local `main`.
- Merged `origin/main` with `--no-ff --no-commit`, keeping local `main` as the
first parent. The only textual conflicts were `README.md` and
`.project-docs/20-architecture/data-flow.md`; both were reconciled
semantically instead of choosing either side wholesale.
- Accepted the remote product consolidation that removes the independent Device
Preview capability and the bundled Superpowers distribution, while retaining
the reviewed local Updater, image-to-image, first-chat, AI-proxy, publishing,
and `/deliverables` behavior. Canonical architecture/current-state documents
were updated to remove stale live Device Preview claims and record remote tip
`f4113a8` under `Integrated Through`.
- Preserved the remote startup warmup, curated course skills, per-Agent model
ownership, recursive Skill details, OpenCode path resolution, authentication
hardening, light visual consolidation, fonts, and window material changes.
- Corrected an upstream course-skill manifest mismatch by retiring the absent
`deploy-publish-check` skill instead of advertising it as bundled, with a
regression assertion in the manager suite.
- Corrected merge-exposed test defects without weakening production behavior:
project-config request mocking now receives `RequestInit`; the Windows runtime
queue test injects a deterministic port-owner lookup; the legacy agent-folder
test accepts the intentionally absent directory; and an unused test binding
was removed.
- Rebased the Electron E2E contract on the consolidated UI: Code/Canvas enter
through the module chooser, hidden module actions are expanded before use,
Models is reached through the account/settings flow, Provider seeding uses the
Main-owned Host API, and project-backed chat mocks return valid initialized
configuration. Two Channels specs were removed because the remote product
consolidation removed their UI, route, and Host API rather than relocating
them. Stable test IDs were restored to the retained proxy settings controls.
- The merge is fully verified and ready for an independent final review and
normal push. The final merge commit and remote equality are recorded after
those operations complete.
## Verification
- `pnpm install --frozen-lockfile` — passed.
- High-risk focused Vitest selection — 19 files, 494/494 passed.
- `pnpm test` — 146 files, 1574/1574 passed.
- `pnpm run typecheck` — passed.
- `pnpm run lint:check` — passed with 0 errors and 6 existing warnings.
- `pnpm run build:vite` — passed.
- `pnpm run test:electron:windows` — 3/3 passed.
- `pnpm run test:e2e` — rebuilt Renderer/Main/Preload and passed 24/24.
- `git diff --check` and `git diff --cached --check` — passed.
## Follow-ups
- Signed packaged updater smoke and live Works Square/Bailian image-to-image
smoke remain external release gates; this Git synchronization does not claim
that either production environment has been exercised.
- A cancelled-before-spawn OpenCode restart can still spend roughly one second
probing a Windows port owner. The queue regression is now deterministic; a
future performance change should distinguish an attached runtime before
skipping that lookup so attached-runtime restart behavior remains intact.
## Promotion Candidates
- None recorded.