Files
makelore/.project-docs/30-worklog/tasks/20260907-integrate-remote-before-push-a4c9e27b.md
inman 918f8f80dc
Some checks failed
Electron E2E / Electron E2E (macos-latest) (push) Has been cancelled
Electron E2E / Electron E2E (ubuntu-latest) (push) Has been cancelled
Electron E2E / Electron E2E (windows-latest) (push) Has been cancelled
Merge origin/main and preserve nonblocking project entry
2026-09-07 12:53:55 +08:00

4.2 KiB

Task: Integrate remote main before push

Identity

  • Task ID: 20260907-integrate-remote-before-push-a4c9e27b
  • Mode: Integration
  • Branch: main
  • Worktree: /Users/inmanx/Documents/makelore
  • Base commit: 6366fc28dc
  • Owner: codex
  • Status: Ready for integration gate

Scope

  • Reconcile local main@6366fc2 with fetched origin/main@da29294, preserving the local cleanup/product history and the compatible remote product work.
  • Resolve the one semantic conflict in Coding project entry/onboarding before forming and pushing an ordinary two-parent merge.
  • Exclude read-only source task records from any final integration changes when required by the task-document ownership boundary, while keeping them reachable through the remote merge parent.

Intent And Constraints

  • Never force-push or rewrite either history.
  • Preserve .makelore/project.json authority, Electron Main/Renderer boundaries, Pi 0.84.2, the three enabled product modules, and the single light visual system.
  • Do not choose between contradictory product rules by timestamp, merge order, or an automatic ours/theirs strategy.
  • The user confirmed on 2026-09-07 that the local non-blocking project-entry behavior remains authoritative; reconcile all affected code, tests, and canonical memory to that decision.

Outcome

  • Fetched both histories and confirmed divergence of 14 remote-only and 29 local-only commits from their merge base.
  • Read all ten remote task records and the local project-creation source record. Remote official-plugin project scope, automatic game-resource delivery, Agent Browser restoration, and Token Points V2 are compatible with the local product direction.
  • Found one contradictory product rule. Local source af13aca and its accepted integration state require directory-only project creation, immediate /chat entry, initialized as compatibility-only, and a non-blocking no-Agent setup link. Remote source 8042d2b integrated by da29294 requires initialized=true plus a fully configured enabled Agent before Conversation entry and makes the first-Agent flow a required gate.
  • The user confirmed directory-only creation, immediate /chat, non-blocking no-Agent setup, and compatibility-only initialized as authoritative.
  • Started an ordinary --no-commit --no-ff merge of origin/main@da29294. The semantic resolution rejects the remote required-Agent readiness gate and retains the compatible official project-wide Plugin activation, automatic Game Resource delivery, Agent Browser restoration, and Token Points V2.
  • Removed the remote-only task-record copies from the final tree without editing them; they remain reachable through the remote merge parent.

Verification

  • Concurrent Task Gate: passed; this worktree holds the exclusive integration lock and no peer owns the repository.
  • Remote fetch: passed; origin/main resolved to da29294.
  • Divergence audit at merge start: 14 remote-only / 29 local-only commits.
  • Source-record semantic review: completed for all remote-only task records and local task 20260906-remove-project-gate-7c31.
  • Conflict-marker and whitespace checks: passed after semantic resolution.
  • Typecheck: passed with the exact pinned pnpm@10.33.4 via Corepack.
  • Focused unit tests: 346 passed and one Plugin-copy expectation failed; the copy was aligned without changing behavior and its 17-test file then passed.
  • Full unit suite: 226 files / 1,912 passed / 3 skipped; the isolated pressure suite passed 1/1.
  • Lint: passed with 0 errors and 5 pre-existing warnings.
  • Production Vite build: passed for Renderer, Main, Preload, and utility worker.
  • Targeted Electron E2E: 6/6 passed across first-chat/runtime behavior, Agent Browser UI, project-config Skill details, and project-wide Plugin enablement.
  • Project-doc gates, merge commit, remote race check, and push remain pending.

Follow-ups

  • Complete the project-doc integration gates, ordinary merge commit, remote race check, and normal main:main push.

Promotion Candidates

  • Promote the confirmed non-blocking project-entry invariant together with the compatible project-wide official Plugin, Game Resource delivery, Agent Browser, and Token Points V2 boundaries recorded in the canonical documents.