Files
makelore/.project-docs/30-worklog/tasks/20260903-design-message-send-client-integration-6f3a8c21.md

7.4 KiB

Task: Integrate AI Design command outcome fix

Identity

  • Task ID: 20260903-design-message-send-client-integration-6f3a8c21
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 4d8b19eeb5
  • Owner: codex-root
  • Status: Ready for Integration

Scope

  • Integrate completed client source commit 83f3f134a6779251aaa18f3290308cd9221b038f from task 20260903-design-message-send-client-8d3f2a71 onto the current main frontier 4d8b19eeb5e70c97d40d2db68f37ee9f425b54f0.
  • Verify the Main-to-Renderer command-outcome contract on the integrated tree, record the source under the canonical integrated-state snapshot, and close the source/integration task ownership lifecycle.
  • Do not modify Works Square server code, Plugin navigation behavior, packaging, deployment, publication, or remote branches.

Intent And Constraints

  • Preserve ADR-007: definitive Agent-run failures settle the matching pending operation, while accepted commands whose result is transport-unknown retain the same stable operation identity. Neither case may be described as a generic message-send failure.
  • Cherry-pick only the exact reviewed source commit. Its parent is e9875145b41a2cb1827de10d27a4fc6a352704ea, which is the exact merge base with current main; subsequent mainline product changes have no path overlap with the source's Main/Renderer Design files or focused tests.
  • Preserve the unified Plugin workspace, Coding runtime/reconciliation fixes, and every other current-main behavior. The source task has no promotion candidate and does not change architecture direction or public server DTOs.
  • Preserve these three pre-existing foreign untracked task records byte-for-byte and never stage them: .project-docs/30-worklog/tasks/20260901-package-122-c5e8.md, .project-docs/30-worklog/tasks/20260901-package-123-d7f3.md, and .project-docs/30-worklog/tasks/20260902-client-hang-diagnosis-a47c9e2b.md.
  • Do not use a destructive reset, stash, clean, rebase, force-update, push, package, deploy, publish, or call a paid Provider. One soft reset of this task's newly created local commit was later separately authorized by the user; it kept the index and worktree intact so the source task record could be registered before recommitting the identical patch.

Concurrent Task Gate

  • Task 20260903-design-message-send-client-integration-6f3a8c21 exclusively owns the root main worktree at base 4d8b19eeb5e70c97d40d2db68f37ee9f425b54f0 and holds the Integration lock.
  • The previous root Integration task was already ready_for_integration; its normal release was blocked only by the three adopted foreign records. After the user explicitly authorized recovery, it was released with --force; no file was modified or removed. This task then adopted the same exact foreign records.
  • Source task 20260903-design-message-send-client-8d3f2a71 is clean and ready_for_integration in its isolated worktree. Its task record, outcome, verification, and empty Promotion Candidates were read.
  • The only owner created after the immediately preceding all-peer root Integration gate is 20260903-package-129-a6f2; it is ready and explicitly owns no product source change. Plugin implementation/acceptance sources are already represented in current main and do not overlap this source.
  • Gate result: Passed.

Project Context Loaded

  • Read the active task, project positioning, success criteria, current state, decision index, ADR-007, system overview, module map, data flow, business rules, evidence index, reflection index, commitments, stale-items register, and the source task record.
  • Current authority is one Main-owned Works Square V2 transport and one server-owned Current Specification. Renderer drafts remain local until a canonical success; transport ambiguity must retain the original operation ID.
  • project-positioning.md remains an unfilled repository template, while the concrete product boundary is supplied by AGENTS.md, current state, ADRs, architecture, business rules, and success criteria. This stale placeholder does not conflict with the requested bounded integration.
  • No source promotion candidate, accepted-decision conflict, or active semantic ownership conflict was found.
  • Planning Gate result: Passed. Integration plan: cherry-pick the exact source, resolve only if a real conflict appears, run focused and repository-required verification, update this record and current-state.md, commit documentation, then complete and release both task contexts from clean worktrees.

Outcome

  • Released the stale completed root Integration owner only after the user explicitly authorized the required force recovery; verified that the three existing foreign untracked records remained present and unchanged, then acquired this task's exclusive Integration lock.
  • Cherry-picked exact reviewed source 83f3f134a6779251aaa18f3290308cd9221b038f without conflict onto current main, creating product commit a16dfd0d6f48b99899ba84ac63bde4dcd661d067. No later Plugin, Coding, package, or project memory behavior was replaced.
  • The first automatic cherry-pick committed the source task record before it could be registered as an unchanged foreign source, so the documentation drift gate blocked. With explicit user approval, soft-reset only that new unpushed commit, registered the staged source record through --adopt-existing, and recommitted the identical source patch. No file content was discarded or rewritten.
  • The integrated client now distinguishes a definitive failed/cancelled Agent Run from a command accepted before an uncertain poll/refresh result. Definitive failures settle pending state and partial streams while preserving the draft; unknown results preserve the original pending ID, draft, and stream. Youth-facing copy no longer misreports either outcome as a generic send failure.
  • Recorded the exact source and integrated behavior in current-state.md. No promotion candidate or accepted decision required modification; this implements ADR-007's existing stable-operation and authority rules.
  • No Works Square server code, database/API DTO, Plugin navigation, package, deployment, publication, push, or paid Provider call changed.

Verification

  • Source-path comparison between 83f3f134 and the integrated working tree showed the source task's files are identical after the conflict-free cherry-pick.
  • Focused Vitest: 6 files / 61 tests passed.
  • corepack pnpm run typecheck passed.
  • ESLint over all changed TypeScript/TSX source and test files passed with no output.
  • corepack pnpm run build:vite passed for Renderer, Electron Main, Preload, and utility bundles; only existing Browserslist, mixed-import, and chunk-size warnings were emitted.
  • tests/e2e/image-workspace-v2.spec.ts passed 2/2 against the production build.
  • Full ordinary Vitest executed 225 files: 224 files / 1,865 tests passed, 2 tests skipped, and the unrelated Pi real-process Bash-batch test exceeded its existing 2,000 ms timing assertion at 2,433 ms while tests, typecheck, and ESLint competed for resources. The exact real-process file immediately passed 5/5 in isolation; its files and behavior are outside this integration diff.
  • The isolated pressure suite passed 1/1.
  • Independent source-task review had no remaining supported-path P1/P2 finding.

Follow-ups

  • None recorded.

Promotion Candidates

  • None recorded.