Files
makelore/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md
brother7 0148b91a15
Some checks failed
Electron E2E / Electron E2E (macos-latest) (push) Has been cancelled
Electron E2E / Electron E2E (ubuntu-latest) (push) Has been cancelled
Electron E2E / Electron E2E (windows-latest) (push) Has been cancelled
记录远程主分支推送认证阻塞
2026-08-13 17:24:25 +08:00

9.1 KiB

Task: 拉取远程主分支、合并并推送

Identity

  • Task ID: 20260813-sync-push-main-9c2f71
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 4fbd1d3b24
  • Owner: codex
  • Status: Blocked

Scope

  • Fetch the authoritative remote main, inspect all commits not present in the local branch, and merge them into the reviewed local main without rewriting either history.
  • Resolve any code or project-memory conflicts semantically, re-run verification proportionate to the fetched changes, obtain an independent final review, and push the resulting main to its configured remote.
  • Record the exact fetched remote tip, merge topology, verification, and push result in this task record.

Intent And Constraints

  • Do not rebase, reset, stash, force-push, or discard either local or remote commits. The user authorized a normal pull/merge/push workflow.
  • Treat the current origin/main value as a stale local tracking reference until git fetch origin main succeeds.
  • Preserve the already reviewed Updater and image-to-image behavior and the repository's Main-owned security boundaries.
  • Source/peer task records remain read-only. This integration task may update only its own task record and any canonical documents that genuinely require semantic reconciliation.
  • Push only after the merge result is clean, verified, and independently reviewed. Never use --force.

Project Context Loaded

Task context:

  • Task ID: 20260813-sync-push-main-9c2f71
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9
  • Other active local tasks: all are isolated in separate registered worktrees; their Scope, Intent And Constraints, and Promotion Candidates were reviewed.
  • Overlap or semantic-conflict assessment: no peer owns this worktree or has an unresolved decision that changes this synchronization plan. Remote overlap remains unknown until fetch and will be inspected before merge.

Read:

  • .project-docs/05-agent-entry/read-before-planning.md
  • .project-docs/05-agent-entry/memory-index.md
  • this active task record
  • .project-docs/00-brief/project-positioning.md
  • .project-docs/30-worklog/current-state.md
  • .project-docs/10-decisions/decision-index.md
  • .project-docs/20-architecture/system-overview.md
  • .project-docs/05-agent-entry/integration-gate.md
  • .project-docs/50-evidence/evidence-index.md
  • .project-docs/60-reflection/reflection-index.md
  • .project-docs/80-commitments/commitments.md
  • .project-docs/90-maintenance/stale-items.md
  • all registry-owned peer task records through the required planning sections

Relevant understanding:

  • Project goal: keep the reviewed local Makelore client history while incorporating legitimate remote main work and publishing one coherent tip.
  • Current integrated focus: local main already contains the reviewed Updater and single-reference image-to-image changes; external production smoke remains pending and must not be overclaimed by this Git synchronization.
  • Active constraints: preserve Main-owned updater/workspace boundaries, existing canonical decisions, and source task records; push must be non-forced.
  • Evidence and commitments: the local tip passed 84 focused tests, typecheck, scoped lint, build:vite, project-document gates, and independent Sol review; three full-suite failures match the documented pre-existing baseline.
  • Unknowns: the latest remote tip and its semantic overlap are not verified until fetch.

Gate result:

  • Passed.

Plan

  1. Commit this integration ownership record, fetch origin/main, and inspect remote-only commits, paths, and topology.
  2. Merge origin/main normally with local main as first parent; resolve any conflict semantically and inspect the combined tree.
  3. Run focused/full checks required by the fetched changes plus project-document gates, then obtain a final independent Sol PASS/FAIL review.
  4. Complete documentation, push main without force, verify local/remote tip equality, and release the clean integration task.

Outcome

  • git fetch origin main --prune resolved the authoritative remote tip to f4113a872f7cd6aee6829c9597c882846bc4085b. The histories had diverged at 253bad8b40c8cd20a25362006f5d80a4e5c4cd4a: local main contained 18 integration/preparation commits not on the remote, while the remote contained one consolidation commit not on local main.
  • Merged origin/main with --no-ff --no-commit, keeping local main as the first parent. The only textual conflicts were README.md and .project-docs/20-architecture/data-flow.md; both were reconciled semantically instead of choosing either side wholesale.
  • Accepted the remote product consolidation that removes the independent Device Preview capability and the bundled Superpowers distribution, while retaining the reviewed local Updater, image-to-image, first-chat, AI-proxy, publishing, and /deliverables behavior. Canonical architecture/current-state documents were updated to remove stale live Device Preview claims and record remote tip f4113a8 under Integrated Through.
  • Preserved the remote startup warmup, curated course skills, per-Agent model ownership, recursive Skill details, OpenCode path resolution, authentication hardening, light visual consolidation, fonts, and window material changes.
  • Corrected an upstream course-skill manifest mismatch by retiring the absent deploy-publish-check skill instead of advertising it as bundled, with a regression assertion in the manager suite.
  • Corrected merge-exposed test defects without weakening production behavior: project-config request mocking now receives RequestInit; the Windows runtime queue test injects a deterministic port-owner lookup; the legacy agent-folder test accepts the intentionally absent directory; and an unused test binding was removed.
  • Rebased the Electron E2E contract on the consolidated UI: Code/Canvas enter through the module chooser, hidden module actions are expanded before use, Models is reached through the account/settings flow, Provider seeding uses the Main-owned Host API, and project-backed chat mocks return valid initialized configuration. Two Channels specs were removed because the remote product consolidation removed their UI, route, and Host API rather than relocating them. Stable test IDs were restored to the retained proxy settings controls.
  • Created merge commit 29c458f07dd40bf8f66d4fbb2acb6fe2a1277cd7 with local preparation commit 1c85bc04547a72ec76074480245f623e37f9cd30 as first parent and fetched remote tip f4113a872f7cd6aee6829c9597c882846bc4085b as second parent.
  • Independent read-only Sol review returned PASS with no P0-P3 findings after checking topology, retained local features, remote consolidation, course skill parity, documentation, E2E strength, security boundaries, and dependency consistency.
  • A normal git push origin main was attempted and rejected by the remote with Failed to authenticate user. A read-only batch SSH check also returned Permission denied (publickey,...); the configured HTTPS credential helper has no usable username/secret for this host. No force option was used and no remote ref changed. Local main and the completed merge remain intact.
  • Completion is blocked only on the user authenticating this machine for git.nianxx.cn. Keep this integration task owned and do not release it until a normal push succeeds and origin/main is verified equal to local HEAD.

Verification

  • pnpm install --frozen-lockfile — passed.
  • High-risk focused Vitest selection — 19 files, 494/494 passed.
  • pnpm test — 146 files, 1574/1574 passed.
  • pnpm run typecheck — passed.
  • pnpm run lint:check — passed with 0 errors and 6 existing warnings.
  • pnpm run build:vite — passed.
  • pnpm run test:electron:windows — 3/3 passed.
  • pnpm run test:e2e — rebuilt Renderer/Main/Preload and passed 24/24.
  • git diff --check and git diff --cached --check — passed.
  • Independent final review — PASS, no P0-P3 findings.
  • Merge topology — verified first parent 1c85bc0, second parent f4113a8.
  • Push — attempted normally, rejected before ref update because remote authentication is unavailable on this machine.

Follow-ups

  • Signed packaged updater smoke and live Works Square/Bailian image-to-image smoke remain external release gates; this Git synchronization does not claim that either production environment has been exercised.
  • A cancelled-before-spawn OpenCode restart can still spend roughly one second probing a Windows port owner. The queue regression is now deterministic; a future performance change should distinguish an attached runtime before skipping that lookup so attached-runtime restart behavior remains intact.
  • Authenticate git.nianxx.cn through the local Git credential manager or an authorized SSH key, then resume this same task to push and verify remote tip equality. Do not paste a personal access token into the task conversation.

Promotion Candidates

  • None recorded.