docs: close main merge integration gate
Some checks failed
Electron E2E / Electron E2E (macos-latest) (push) Has been cancelled
Electron E2E / Electron E2E (ubuntu-latest) (push) Has been cancelled
Electron E2E / Electron E2E (windows-latest) (push) Has been cancelled

This commit is contained in:
2026-08-31 15:17:18 +08:00
parent 0313261bfb
commit bf32fecd60

View File

@@ -0,0 +1,68 @@
# Task: Finalize local main remote merge documentation gate
## Identity
- Task ID: 20260831-finalize-main-merge-8c4e2a71
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 0313261bfb7482366622d89d59659d8b564a1b59
- Owner: codex
- Status: Ready for Integration
## Scope
- Close the Task Documentation Gate after the verified local/remote merge, takeover,
canonical promotion, and source task records are already present in the recorded base.
- Verify final `main` topology and ownership boundaries without changing product code,
shared canonical memory, remote refs, deployment state, or production activation gates.
## Intent And Constraints
- Concurrent Task Gate: PASS. This task owns `main` and the sole Integration lock at base
`0313261bfb7482366622d89d59659d8b564a1b59`.
- Planning Gate: PASS using the immediately preceding full startup/source/ADR/architecture/
domain/evidence/peer assessment. All 195 peer records remained readable; 32 peers were
planning and 163 were ready for integration, with no semantic conflict or worktree
overlap. `project-positioning.md` remains a known placeholder.
- The exact known foreign task record
`.project-docs/30-worklog/tasks/20260827-plugin-ml07-spec-7c5a2e91.md` remains
byte-preserved and untracked. Its exact path is locally excluded in `.git/info/exclude`
so future task gates do not accidentally stage it.
- Do not amend, reset, rebase, force-update, push, deploy, publish, or change any source
task record or canonical conclusion.
## Outcome
- Confirmed local `main` contains fetched `origin/main`
`38f85f6b5e4dc4e2c5e5b9f8f4506554cfd578f5`, local hosted Game Resource Plugin
delivery, shared Pi Agent Server integration, canonical hosted-Plugin promotion, and
all takeover/integration records through
`0313261bfb7482366622d89d59659d8b564a1b59`.
- No further code, architecture, domain, or product-state change was required. This task
adds only its own final Integration Gate record.
- No push, deployment, production Provider request, package activation, or publication
was performed.
## Verification
- `origin/main` is an ancestor of local `main`; unresolved merge paths and conflict
markers are zero.
- Repository-pinned `pnpm@10.33.4` typecheck passed; merge-focused Vitest passed 12 files
/ 145 tests with 2 skipped.
- Identical verified product-tree evidence: full unit suite passed 212 files / 1,721 tests
with 2 skipped; lint passed with 0 errors and 5 existing warnings; Renderer/Main/
Preload/utility Vite build passed.
- The final documentation commit is limited to this task record; task-aware drift and
required-project-doc checks are run after the commit.
## Follow-ups
- Push local `main` only when explicitly requested.
- Keep production Marketplace activation closed until the official signing key, rotated
credential, positive pricing, Admission, packaged lifecycle, uncertain-result, and real
Provider gates pass.
## Promotion Candidates
- None. Canonical promotion was completed by the preceding Integration Gate.