chore(coding): record ML-09 final review

This commit is contained in:
2026-08-27 01:19:20 +08:00
parent bb832c6666
commit 2f346687b1

View File

@@ -8,7 +8,7 @@
- Worktree: D:\Datas\OthersProjects\makelore-data-service-client-b72e4c19
- Base commit: f2456039230f68e3ecb2c8653fc3379c23bbe5ce
- Owner: codex-root
- Status: In Progress (ML-01 through ML-09 integrated; review/X-01 pending)
- Status: In Progress (ML-00 through ML-09 product/review complete; X-01 pending)
## Scope
@@ -175,6 +175,12 @@
deleted from this coordinator while its source record remains in
`D:\Datas\OthersProjects\makelore-ml09-data-service-remediation-5e7c2a91`.
The product frontier after this merge is `38843e091fbbe68ec934336b8ed3a08c955afb28`.
- Final ML-09 repository-local review is complete over the fixed client review
range `f2456039230f68e3ecb2c8653fc3379c23bbe5ce`
`bb832c66660d993baa6147cf058078a5cd89fcb2`. Standards: PASS. Spec: PASS.
ML-00 through ML-09 product delivery, review, and the single remediation
pass are complete; this conclusion does not claim the external X-01 live
acceptance.
## Verification
@@ -437,28 +443,23 @@
audit matched the expected 15 source paths with no extra or missing path,
and the added-lines scope scan found no Firebase, Redis, retry/cache, or
published-runtime expansion.
- Final ML-09 review ledger: fixed range
`f2456039230f68e3ecb2c8653fc3379c23bbe5ce` →
`bb832c66660d993baa6147cf058078a5cd89fcb2`; Standards PASS and Spec PASS.
ML-00 through ML-09 product/review scope is complete. This documentation
update changes no product files; the worktree remains held for X-01.
## Follow-ups
- ML-02 identity choice and legacy/independent-copy UX, ML-03 Main Data
Service, ML-04 Pi Data Service tools, ML-05 preview data sessions, ML-06
Agent Browser pre-document injection, and ML-07 generated SDK/Skill assets
are integrated. ML-04 consumed the `DataServiceOperations` seam from the
recorded ML-03 frontier and preserves its active-project identity and
trusted project-path constraints. ML-05 and ML-06 preserve the Main-owned
credential boundary; ML-06 supplies the narrow exact-Origin injection seam
and ML-07 consumes only that local capability while keeping ordinary
arbitrary URL opens data-free.
- The broader ML-00 through ML-09 coordinator task remains in progress; this
record now has ML-08 and ML-09 verification but does not claim review
closure, release proof, or live acceptance. The client/server draft PR
promotion is externally blocked in this environment because GitLab HTTPS
credentials are unavailable non-interactively and `gh`/`glab` are not
installed; no draft PR is claimed from this worktree.
- ML-09 remediation is integrated; review closure remains pending, including
the known Pi model-combobox E2E deviation. X-01 remains a TODO after review:
exercise real PostgreSQL with a signed-in MakeLore preview and record live
acceptance separately; repository E2E results cannot substitute for it.
- X-01 live acceptance remains pending: exercise real PostgreSQL with a
signed-in MakeLore preview and record the live result separately;
repository tests and E2E cannot substitute for this acceptance.
- GitLab HTTPS PR authentication remains unavailable non-interactively in this
environment and `gh`/`glab` are not installed; draft PR promotion remains
blocked and no draft PR is claimed from this worktree.
- The existing full E2E deviation remains: 25 passed / 1 failed at
`tests/e2e/pi-coding-first-chat.spec.ts:575` because the `当前对话模型`
combobox stays disabled until the 30s selector timeout.
## Promotion Candidates