docs: record takeover merge

This commit is contained in:
2026-08-31 15:07:36 +08:00
parent 03a9e866d4
commit 2ca60445d4

View File

@@ -8,7 +8,7 @@
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 62304dc85b3c1069cd656dfacb61ee820e216fa2
- Owner: codex-root-meowa-client
- Status: Ready for Integration
- Status: Transferred to Integration Gate
## Scope
@@ -20,6 +20,9 @@
- Remove the direct always-mounted Meowa proxy, local credential configuration, embedded
credential source, and packaging-time plaintext key path.
- Preserve existing local game-asset review UI behavior where it is reached by Plugin tools.
- On the human-authorized takeover, finish the already-started `origin/main` merge in
this worktree without discarding its staged remote changes or the unrelated untracked
task record.
## Intent And Constraints
@@ -43,6 +46,11 @@
- Planning Gate: PASS after reading required client project memory/AGENTS, Marketplace
Release B contract, current package store/effective resolver/registry/Pi composition,
prior Meowa audit, and official Meowa public contracts.
- Takeover gate: PASS. The in-progress merge was verified to use local parent
`421c8254d51318355faec3ae94f8e1cfd4d054c5` and fetched `origin/main`
`38f85f6b5e4dc4e2c5e5b9f8f4506554cfd578f5`, exactly matching the previously
verified isolated integration. No abort, reset, stash, clean, rebase, or force-update
was used.
## Outcome
@@ -67,6 +75,12 @@
- Preserved the unrelated untracked
`.project-docs/30-worklog/tasks/20260827-plugin-ml07-spec-7c5a2e91.md` without editing,
staging, deleting, stashing, or cleaning it.
- Completed the inherited remote merge as
`03a9e866d4366e0a1cb416e26b424fe981071310`. The sole conflict retained the remote
shared Agent Server factory/runtime flags and local dynamic Plugin registration, while
omitting the obsolete static `game_asset_browser` and `game_asset_review` tools. Its
product and canonical-document tree matches verified merge `372b534` except for that
isolated task's own `20260831-pull-remote-merge-4a91c7e2.md` record.
## Verification
@@ -85,6 +99,9 @@
bytes with SHA-256 `66C3802040643C35F419CD0EF5D6CB804DD69A34F8338FE0C997EE8CA895632C`.
- `git diff --check` passed for the task changes. No real Provider request, production
Marketplace signature, production install, push, deploy, or publication was performed.
- Takeover merge verification: unresolved paths 0; conflict markers 0; staged and
unstaged `git diff --check` passed; repository-pinned `pnpm@10.33.4` typecheck passed;
12 merge-focused files passed 145 tests with 2 skipped.
## Follow-ups
@@ -95,6 +112,9 @@
response-loss/pending-review, and real Provider acceptance using the packaged client.
- Keep production installation/activation fail closed until the official Ed25519 public
key is built into `trusted-keys.ts` through the normal reviewed release process.
- Complete canonical promotion under an Integration Gate task. The feature-mode drift
gate must not be bypassed merely because the fetched remote history contains accepted
canonical documentation.
## Promotion Candidates