2.2 KiB
Evidence Topic: Markdown current source and July release recheck
- Date: 2026-07-31 14:14–14:17 Asia/Shanghai
- Scope: Current Booking pointer, open-review state, July company-report period distribution and read-only processor preview
- Mutation: None
Evidence
- A direct read-only repository check found
booking.current_source_batchstill selecting batch 1,expected_fixture, with 867 source rows, six worksheets, 348 distinct Group Codes and total room quantity 867. - The current-review query returned no reviewing Booking Excel draft. The previously observed draft is therefore no longer a live company-task blocker, and no Booking source switch occurred.
- The July 31 company-report snapshot now contains 986 supported-company Finance facts. Their C/O dates range from
2026-07-21 through 2026-07-30: zero facts are in
01-10, zero are in11-20and all 986 are in21-month-end. - A read-only in-memory processor 1.2.0 preview remains valid for all five companies:
| Company | Output rows | Booking Room filled | Booking Room blank | Errors |
|---|---|---|---|---|
| LianTai | 311 | 144 | 167 | 0 |
| QBD | 159 | 31 | 128 | 0 |
| DY-AI-Easy-KB | 67 | 39 | 28 | 0 |
| FengRun | 38 | 5 | 33 | 0 |
| HanaTour | 23 | 5 | 18 | 0 |
| Total | 598 | 224 | 374 | 0 |
- The Web release rule opens July
21-month-endat 2026-08-01 00:00 Asia/Bangkok, which is 2026-08-01 01:00 Asia/Shanghai. At the time of the check the period was not released.
Finding
Markdown remains the current Booking lookup source and the deterministic processor can already be tested directly.
Because all currently relevant Finance facts fall in 21-month-end, the earlier released July periods can only produce
empty results. A formal Web-created populated job must wait for the release boundary.
The frozen 314-row Markdown package remains a valid, immutable result for its pinned five-version Finance snapshot. It must not be mistaken for the later live 986-fact projection; the current read-only preview has 598 output rows.
Open Item
After 2026-08-01 01:00 Asia/Shanghai, create one July 21-month-end five-company Web job while Markdown batch 1 remains
current, then verify persistence, five downloads and output counts against the job's own pinned snapshot.