Files
wyndham-ARR/.project-docs/50-evidence/evidence-index.md

19 KiB
Raw Blame History

Evidence Index

Use this index for searchable, traceable evidence records.

Date Topic Status Source Detail
2026-08-03 Public mobile H5 dashboard boundary Implemented; deployment/restart pending Evidence topic Anonymous H5 page/assets and purpose-built /api/public/h5/* aggregate routes are allowed. The projection omits source_monthly_sha256; desktop, generic/legacy APIs, detailed health, jobs/traces, downloads and writes remain protected. test_arr_web* discovery passes 71 tests; no live service or business data was changed.
2026-08-03 ARR job trace semantics for internet deployment Implemented; live deployment acceptance pending Evidence topic Trace projection adds execution_scope, processor_mode and remote_dispatch; artifact_callback is identified as ARR fixed-processor runtime execution and legacy direct_mcp as remote Agent/MCP delivery. “本地处理” copy is removed, pending downstream explicitly follows Finance commit, and persisted local-... delivery identities are retained. Focused trace/Web tests pass; no live task or business write occurred.
2026-08-03 Booking Excel to company-report traceability Implemented; authenticated browser acceptance pending Evidence topic New report jobs persist a safe source summary captured at submission; current source, job detail and history expose the filename/batch context. Identical active uploads refresh context without re-extraction or automatic generation. Full discovery passes 360 tests with 10 optional skips; no live mutation or restart occurred.
2026-08-03 2026-07 company-report retry publication failure Implemented; live historical rerun pending Evidence topic July 11-20 job 60bcda9c… failed for all five companies at publish after an earlier same-period success. Publisher idempotency now validates and reuses a complete matching archive/result pair despite different rebuilt XLSX bytes, while partial or conflicting state fails closed.
2026-08-02 Cross-month history visibility Implemented and runtime-active Evidence topic Three independent history-month navigators now default to the latest non-empty month through a read-only count endpoint; company generation/history months are separated. July resolves to 30 daily/4 monthly/4 company jobs, 356 tests pass, 1440/900/390 browser QA is overflow-free, port 8766 is ready and no business write occurred.
2026-07-31 Channel BI header utilities and compact month selector Implemented; focused static checks pass Evidence topic The visible BI panel heading and ready-state 数据库已连接 copy are gone from desktop/H5 while the navigation label, browser metadata and status dot remain. The month selector is compact; task-log/logout use low-emphasis accessible links, and the desktop BI panel now sits 20px closer to the tab bar with a 10px mobile adjustment. No API or business data changed.
2026-07-31 Channel BI copy and data coverage Implemented; focused checks pass Evidence topic Desktop and H5 remove the BI-only CHANNEL PERFORMANCE, snapshot watermark and visible BI TOTAL PRICE labels. The company-sales panels show localized 数据范围 from additive min_arrival_date plus existing max_arrival_date values returned by the same repeatable-read current-version snapshot.
2026-07-31 ARR Web 中英泰国际化实现 Implemented; scoped Web regression passes Evidence topic Desktop、H5、登录页共用三语词典/runtime支持 locale 持久化、动态提示/API 错误/日期数字格式化和切回中文;ARR Report、专有名词、业务逻辑及 XLSX 契约保持不变。
2026-07-31 2131 same-room-category multi-price warning Active data-review finding; reports still succeed Evidence topic Job 8aa1fdef… emitted 13 pricing warnings across 116 Finance records: one Finance room category has multiple prices within an output segment. Booking Room is independent; no Booking-match error was found.
2026-07-31 Live 2131 company-job Booking Room diagnostic No Booking-write defect found Evidence topic Published job 8aa1fdef… contains 598 rows: 224 Booking Room values and 374 expected blanks. Of 986 Finance facts, 372 have no Group Code and two other output rows carry unmatched codes. Total Booking Price is Finance-derived, not a Booking-price calculation.
2026-07-31 Company-channel early generation and period completeness state Implemented; focused and project-venv full checks pass Evidence topic Current-month incomplete C/O periods can be generated from the current committed Finance snapshot using fixed as_of_date boundaries; later facts require rerun, and future months remain blocked. UI states are 周期未结束 / 周期已结束, with an early-generation confirmation note. No report or business data was generated during verification.
2026-07-31 Company-channel period card copy and result details Implemented; focused/full checks, month-boundary and deduplication checks pass Evidence topic Removed stage labels, made the C/O ranges month-aware, collapsed duplicate review problems for display, and replaced the user-facing version number with generation time. Internal period keys, API version metadata, release rules and generation payloads are unchanged.
2026-07-31 Company-channel card row and generation confirmation Implemented; focused/full checks and isolated responsive QA pass Evidence topic Upload plus three C/O periods share one responsive card row; the month picker is compact and visually unlabeled in the setup card's upper-right; period CTAs read 生成; native confirmation is replaced by an in-page dialog with cancel/backdrop/Escape dismissal. No report or business data was submitted during QA.
2026-07-31 Markdown current source and July release recheck Historical pre-change read-only state; superseded by early-generation behavior Evidence topic Batch 1 remains the current 867-row/348-code Markdown source and no review draft is open. The later live Finance projection has 986 facts, all with C/O 7/217/30; processor 1.2.0 previews valid 5/5 with 598 output rows, 224 filled Booking Rooms and 374 blanks. The original 14:1414:17 check recorded the prior release gate; current behavior is documented in the early-generation topic above.
2026-07-31 Company-detail title and upload rail Implemented; focused/full checks and isolated responsive QA pass Evidence topic Fixed-company context is shown beside the page title in pale small text; the Excel dropzone/action rail is capped at 760px on desktop and stacks to the panel width on mobile. 报表月份 remains the C/O month selector and 刷新任务 remains read-only, with a tooltip documenting its refresh scope. No report/upload/database mutation occurred.
2026-07-31 Company-channel action button compacting Implemented; focused/full checks and isolated responsive QA pass Evidence topic Period generation CTAs are 104124px wide and centered in each card; 提取并核对 shares the 42px compact button family and centers in the upload action grid. Desktop/mobile geometry has zero center delta, one-line labels, no horizontal overflow or console warnings, and no business action was invoked.
2026-07-31 Daily KPI card size refinement Implemented; focused checks pass Evidence topic ARRIVAL DATE, processing duration and NO. OF ROOM retain their original grid-column widths and stretch to the same compact desktop grid-row height as the ARR.XML upload panel. The upload internals are compressed into a horizontal dropzone; mobile behavior and processing are unchanged.
2026-07-31 Daily overview layout and copy cleanup Implemented; focused checks pass Evidence topic The duplicate top Daily Report title and THIS MONTH eyebrow are gone; the history heading is Daily Report, and the upload station plus ARRIVAL DATE, processing duration and NO. OF ROOM cards share one responsive desktop row. Upload/progress/task-log behavior and all APIs are unchanged.
2026-07-31 Standard monthly page cleanup Implemented; focused checks pass Evidence topic The desktop monthly surface now keeps only a live-status rail, a six-column download table and 50-row pagination. Obsolete standard-monthly/version-history copy, the monthly version column and the C/O-period footer note are absent; 更新至 is backed by the explicit maximum-ARRIVAL API field. No report or business data changed.
2026-07-31 Daily upload progress and task-log behavior Implemented; focused checks pass Evidence topic ARR.XML submission stays on the daily page, the existing task-log dialog remains on-demand, and the upload card shows an accessible stage-based estimate with success/error states. JavaScript syntax plus 15 focused Web/static/trace tests pass.
2026-07-31 Markdown company-channel baseline freeze Frozen and independently verified; live publication intentionally excluded Evidence topic Exact Markdown hash/current batch 1 plus five Finance version pins produced five XLSX files and 314 rows. Independent Markdown comparison found zero Booking Room mismatches; all files pass SHA-256/ZIP checks and all 15 sheets passed visual review. One reviewing Excel draft remained isolated and no business/report write occurred.
2026-07-31 Booking Excel extraction program Implemented, migrated and runtime-active; first real source activation pending Evidence topic Supplied workbook yields 26 Tour Codes/37 items/7 pending; review pages at 50, atomically batch-deletes 1-50 selected items and identifies the records with the draft's uploaded filename instead of a historical-source status. A real-PostgreSQL create/edit/activate slice rolled back cleanly, 346 tests pass, isolated desktop/mobile QA is green, and live July data previews valid 5/5.
2026-07-31 Booking manual-review schema audit Superseded implementation snapshot; audit-depth finding remains active Evidence topic The audit correctly found a PATCH/DELETE transport gap, which the later extraction-program implementation repaired. Its live-schema facts and reviewer/reason/revision-history gap remain valid.
2026-07-31 Booking import dimensions and live database inventory Booking findings active; Finance counts superseded by later live recheck Evidence topic The 867-row/348-code Booking inventory and normalized intake model remain valid. Its 417-row Finance count is a historical snapshot; the later read-only release recheck found 986 current supported-company facts.
2026-07-30 Daily page visual polish Active Evidence topic The daily surface now preserves workspace-title hierarchy, exposes task log as a real button and centers a simplified upload station with a compact action. Thirty-three focused tests and four responsive live widths passed without overflow or browser issues.
2026-07-30 Web login runtime mismatch Resolved; authenticated runtime active Evidence topic Keychain-backed login is active under detached Screen on *:8766. A 2026-07-31 Keychain-only rotation and controlled restart reject the prior pair, accept the new pair and pass session/readiness/logout plus loopback/LAN checks without business writes. DHCP has the current LAN entry at .48; the password is still not distinct from the username, and reboot-persistent supervision remains open.
2026-07-30 Daily upload filename provenance Implemented/migrated; post-restart write acceptance pending Evidence topic Migration 013 separates processing_runs.uploaded_filename from canonical artifact source.xml; history/trace use only the upload provenance and old rows render unknown. The authenticated runtime is active; one controlled no-PII upload remains to verify the live write path.
2026-07-30 Task-log relocation and daily-only scope Historical before-state; superseded by the 2026-07-31 upload interaction update Evidence topic The desktop header opens the black task console as a native modal, and history selection still reveals the matching job. The earlier upload-triggered opening is superseded; query inspection still proves both history and trace roots are limited to pipeline_type = 'opera_daily'.
2026-07-30 Company-report path and July month-end readiness Historical pre-change readiness snapshot; current generation rule superseded Evidence topic Missing/unmatched Group Codes leave Booking Room blank and current July projection previews valid 5/5. The topic records the prior July completion boundary and the remaining acceptance work; current-month incomplete periods are now also generatable, with rerun after completion when needed.
2026-07-30 Channel BI post-update data contamination Active; repair not yet authorized Evidence topic Four hash-matched real files total 416 rooms; live API/monthly V04 show 417 because active Finance version 2 is a one-room local fixture. An open BI view can also stay at pre-07-23 value 308 because analytics does not refresh after upload.
2026-07-30 Monthly publication live acceptance Implemented; current data caveat active Evidence topic Publication mechanics remain verified. Later runs reached V04 active with 417 rows and five published events; 416 are real and one is the known fixture. Browser/access logs previously proved automatic list discovery without refresh.
2026-07-30 First live ARR2 user-run trace Historical before-state; resolved Evidence topic The daily commit was real but the then-current monthly action was local-only. This diagnosis led to migration 012 and the now-complete publication/worker/formula repair.
2026-07-30 ARR2.0 programmatic pipeline Implemented; local vertical slices pass Evidence topic Independent no-Agent runtime runs the fixed processor, validates/stores artifacts and commits atomically. Success/failure, lifecycle SQL, private OSS behavior, trace, downloads and deployment contracts are covered.
2026-07-30 SuperAgent OSS fetch Prompt experiment Fetch/Skill/MCP reached; large payload rejected Evidence topic The latest v3 job fetched the exact 629434-byte XML once and generated a valid 135-record result. After repeated reads of the roughly 124 KB JSON, the Agent submitted only 20 records. ARR rejected it as RESULT_CONTRACT_INVALID, wrote no Finance version and terminalized the job. XML allowlisting and MCP reachability are proven; exact large-payload transport through model arguments is the current blocker.
2026-07-29 Full-flow task trace terminal Verified locally and against live SuperAgent trace contract Evidence topic New tasks use include_trace=true, persist only sanitized run/task/step events, and merge them with authoritative upload/writeback/Finance/outbox facts in one black console. POST-only semantics, non-deduplicating stream keys, background SSE handoff, 38 targeted tests and 275 full-suite tests with 2 skips were verified. On 2026-07-30 the same plain console gained one-click full-text copy with 15 Web tests and live button-state/feedback verification.
2026-07-29 Repeated XML artifact identity fix Upload fixed; MCP E2E blocked Evidence topic Migration 011 fixed equal-content cross-run identity and a real 0721.XML upload reached SuperAgent. The remote run returned success under MCP config 53 but made no submission; its grant expired unconsumed and Finance remained empty.
2026-07-29 SuperAgent manual XML runs Historical; production implication superseded by ADR-002 Evidence topic The exports remain factual processor/chat evidence, but the user confirmed direct chat upload is outside the dedicated Agent contract; production acceptance starts at the controlled ARR entrypoint.
2026-07-29 Local XML upload runtime re-enabled Active until local restart/config change Evidence topic The old launchd process omitted --enable-processing; its controlled launcher was corrected and restarted, health now reports database/processing ready, and the XML chooser is enabled without submitting a file.
2026-07-29 Channel BI database runtime verification Superseded after fact changes Evidence topic The database connection finding remains true, but its one-row fixture projection is historical; use the 2026-07-30 post-update contamination evidence for current values.
2026-07-29 Controlled public deployment repository Historical baseline; current server E2E still pending Evidence topic Dockerfile/Compose processing and fail-closed readiness evidence remains valid. Its Caddy Basic Auth/MCP topology is superseded: current deployment uses Caddy HTTPS plus ARR application login and no active MCP service.
2026-07-29 Live synthetic XML upload vertical slice Active blocker Evidence topic Public MCP reachability and one-tool discovery are restored; stale SuperAgent config version 33 must now be refreshed before the next commit test.

When To Add Evidence

Add a topic file when a task depends on logs, commits, test output, external docs, bug reproduction, experiments, or postmortem-level reasoning.

Keep task progress in 30-worklog/; keep reusable workflow lessons in 60-reflection/.