3.5 KiB
3.5 KiB
Task: Integrate project setup UX
Identity
- Task ID: 20260906-integrate-project-setup-ux-4b7d2e91
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit:
83ad10d95e - Owner: codex
- Status: Ready for Integration
Scope
- Integrate source task
20260906-project-setup-ux-90fe6cf2at8042d2be265e40288e628fcdc755e9f29151306bontomainat83ad10d95e607c10973fed543cc5fa09afdcb9f7. - Preserve the Token Point V2 sidebar behavior already on
mainwhile adopting the shared Coding Project conversation-readiness gate and project-setup onboarding flow. - Promote the source task's accepted readiness invariant into
.project-docs/30-worklog/current-state.md. - Verify the exact merged tree and leave the three pre-existing adopted task records unchanged and outside the integration commit.
Intent And Constraints
- Use a normal non-history-rewriting merge; do not squash, rebase, force-push, package, deploy, or push remotely.
- Treat the source task record as read-only source evidence until it is intentionally adopted as part of the merge commit.
- Preserve the accepted
.makelore/project.jsonauthority, Pi runtime structure, Main-owned boundaries, and single light visual system. - Do not modify or commit the adopted records
20260901-package-122-c5e8.md,20260901-package-123-d7f3.md, or20260902-client-hang-diagnosis-a47c9e2b.md. - Re-run focused onboarding/readiness tests, typecheck, lint, Renderer build, the relevant Electron E2E, and the full unit suite because the source and destination both modify
Sidebar.tsx.
Outcome
- Merged
codex/20260906-project-setup-ux-90fe6cf2-project-setup-uxinto the currentmainwith--no-commit --no-ff; Git reconciled the sharedsrc/components/layout/Sidebar.tsxchange without conflicts. - Preserved the Token Point V2 version of Sidebar and added only the shared Coding Project conversation-readiness import and navigation predicate from the source.
- Integrated the shared readiness contract, required first-Agent setup card, deterministic configuration exits, and Coding chat recovery state together with their focused unit and Electron E2E coverage.
- Registered the unchanged source task record as an adopted integration input and
promoted its accepted readiness invariant into canonical
current-state.md. - Kept the three pre-existing adopted task records unstaged and unchanged.
Verification
- Focused Vitest passed 5 files / 63 tests for readiness, App and MainLayout gates, Project Configuration onboarding, and Coding chat recovery.
- Full
pnpm testpassed 231 files / 1,936 tests with 2 skipped; the separately serialized Coding chat pressure test passed 1/1. pnpm run typecheckpassed.pnpm run lint:checkpassed with 0 errors and the 5 unchanged warnings insrc/pages/Home/index.tsxandsrc/pages/Makelore/index.tsx.pnpm run build:vitepassed for Renderer, Electron Main, preload, and utility bundles; only the repository's existing Browserslist, dynamic-import, and chunk-size advisories were reported.- Electron E2E
tests/e2e/project-configuration-skills.spec.tspassed 1/1. check_project_docs.py, task-awarecheck_doc_drift.py, the unchanged source-task record comparison, andgit diff --checkall passed before the merge commit.
Follow-ups
- None recorded.
Promotion Candidates
- None. This Integration Gate applies the accepted source promotion directly to
.project-docs/30-worklog/current-state.md.