Task: Integrate project setup UX

Identity

  • Task ID: 20260906-integrate-project-setup-ux-4b7d2e91
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 83ad10d95e
  • Owner: codex
  • Status: Ready for Integration

Scope

  • Integrate source task 20260906-project-setup-ux-90fe6cf2 at 8042d2be265e40288e628fcdc755e9f29151306b onto main at 83ad10d95e607c10973fed543cc5fa09afdcb9f7.
  • Preserve the Token Point V2 sidebar behavior already on main while adopting the shared Coding Project conversation-readiness gate and project-setup onboarding flow.
  • Promote the source task's accepted readiness invariant into .project-docs/30-worklog/current-state.md.
  • Verify the exact merged tree and leave the three pre-existing adopted task records unchanged and outside the integration commit.

Intent And Constraints

  • Use a normal non-history-rewriting merge; do not squash, rebase, force-push, package, deploy, or push remotely.
  • Treat the source task record as read-only source evidence until it is intentionally adopted as part of the merge commit.
  • Preserve the accepted .makelore/project.json authority, Pi runtime structure, Main-owned boundaries, and single light visual system.
  • Do not modify or commit the adopted records 20260901-package-122-c5e8.md, 20260901-package-123-d7f3.md, or 20260902-client-hang-diagnosis-a47c9e2b.md.
  • Re-run focused onboarding/readiness tests, typecheck, lint, Renderer build, the relevant Electron E2E, and the full unit suite because the source and destination both modify Sidebar.tsx.

Outcome

  • Merged codex/20260906-project-setup-ux-90fe6cf2-project-setup-ux into the current main with --no-commit --no-ff; Git reconciled the shared src/components/layout/Sidebar.tsx change without conflicts.
  • Preserved the Token Point V2 version of Sidebar and added only the shared Coding Project conversation-readiness import and navigation predicate from the source.
  • Integrated the shared readiness contract, required first-Agent setup card, deterministic configuration exits, and Coding chat recovery state together with their focused unit and Electron E2E coverage.
  • Registered the unchanged source task record as an adopted integration input and promoted its accepted readiness invariant into canonical current-state.md.
  • Kept the three pre-existing adopted task records unstaged and unchanged.

Verification

  • Focused Vitest passed 5 files / 63 tests for readiness, App and MainLayout gates, Project Configuration onboarding, and Coding chat recovery.
  • Full pnpm test passed 231 files / 1,936 tests with 2 skipped; the separately serialized Coding chat pressure test passed 1/1.
  • pnpm run typecheck passed.
  • pnpm run lint:check passed with 0 errors and the 5 unchanged warnings in src/pages/Home/index.tsx and src/pages/Makelore/index.tsx.
  • pnpm run build:vite passed for Renderer, Electron Main, preload, and utility bundles; only the repository's existing Browserslist, dynamic-import, and chunk-size advisories were reported.
  • Electron E2E tests/e2e/project-configuration-skills.spec.ts passed 1/1.
  • check_project_docs.py, task-aware check_doc_drift.py, the unchanged source-task record comparison, and git diff --check all passed before the merge commit.

Follow-ups

  • None recorded.

Promotion Candidates

  • None. This Integration Gate applies the accepted source promotion directly to .project-docs/30-worklog/current-state.md.