Files
makelore/.project-docs/30-worklog/tasks/20260903-complete-remote-merge-b41e7c92.md
T
brother7 4d8b19eeb5
Electron E2E / Electron E2E (macos-latest) (push) Has been cancelled
Electron E2E / Electron E2E (ubuntu-latest) (push) Has been cancelled
Electron E2E / Electron E2E (windows-latest) (push) Has been cancelled
merge: integrate remote main
2026-09-03 17:19:21 +08:00

7.5 KiB

Task: Complete remote main merge

Identity

  • Task ID: 20260903-complete-remote-merge-b41e7c92
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: 7a37593e4b
  • Owner: codex-root
  • Status: Ready for Integration

Scope

  • Complete the already-started normal merge of fetched origin/main 8e947b4f0e1ff0409e52a9d528ae3bb240ceb687 into local main 7a37593e4be3c39a9782975de53f56a76dd53ef0.
  • Resolve all product, test, README, and canonical project-memory conflicts by preserving both compatible intents: the reviewed unified /plugins workspace and the remote Pi/runtime/Conversation fixes.
  • Run integration-focused and repository-required verification, create the merge commit, and close the project-documentation gate. Do not push.

Intent And Constraints

  • The user explicitly authorized takeover of the dirty root worktree and completion of its existing merge. The prior integration owner was released with the bundled task-context recovery command; this task now exclusively owns the worktree and integration lock.
  • Preserve normal two-parent history. Do not abort, rebase, reset, force-update, stash, or discard staged/working content.
  • ML-PLUGIN-NAV-001 and its R4 zero-finding acceptance are the authority for the Plugin conflict: keep one canonical /plugins page and one sidebar entry, exact replace redirects, and deletion of the three superseded page implementations.
  • Preserve remote packaged Pi runtime-root resolution, foreground Snapshot reconciliation, attention-only Conversation markers, bounded missing-settlement recovery, and serialized write-leased tool batches under ADR-006.
  • Keep Catalog, Account Library, official Package Store, Device Packages, project enablement, Agent assignment, runtime admission, and billing as independent authorities. Keep selected-model native Web Search outside the Plugin projection.
  • Preserve the three pre-existing untracked foreign task records exactly. Do not package, install, deploy, publish, open a PR, or push.

Project Context Loaded

  • Concurrent Task Gate passed for this exact integration task, main worktree, branch, base commit, and exclusive integration lock.
  • Planning Gate passed after reading the startup memory, active record, integrated snapshot, accepted decisions, architecture/domain/evidence/reflection/commitment records, all planning peer scopes, both merge histories, the Plugin implementation specification, source handoffs, and final R4 acceptance.
  • All 212 peer records are readable. Twenty-nine remain registered as planning; none has unresolved semantic ownership over this merge. One historical Data Service scope names obsolete .niancode ownership, which is overridden for this task by repository guidance and accepted ADR-006 rather than treated as current authority.
  • The remote Project Configuration Plugin Services design is superseded by the later user-confirmed unified /plugins specification. The remote runtime and Conversation changes are compatible and must be retained.

Outcome

  • Took over the existing root-worktree merge only after the user explicitly authorized takeover, released the stale prior owner through the bundled ownership command, and acquired the exclusive integration lock for this task.
  • Resolved all 15 unmerged paths without aborting or rewriting history. The final tree keeps the reviewed canonical /plugins page, sidebar entry, deterministic legacy redirects, and source-qualified unified projection. The remote predecessor Project Configuration Plugin Services component, helper, page implementations, and tests remain retired rather than creating a second product surface.
  • Preserved the remote Pi runtime-root resolver, complete active-branch history, foreground Snapshot reconciliation, attention-only markers, exact Token Point quota projection, missing-settlement recovery, and serialized write-leased tool batches. The real-process conflict now verifies both the local two-extension Device Package generation and the remote post-acceptance invalid-JSON failure.
  • Reconciled README and canonical architecture/current-state/evidence/commitment records semantically. The staged result is ready for a normal merge with parents 7a37593e4be3c39a9782975de53f56a76dd53ef0 and 8e947b4f0e1ff0409e52a9d528ae3bb240ceb687.
  • Corrected the bundled maintain-project-docs recovery path so explicit --adopt-existing records the Git-index and working-tree fingerprints of known foreign task records. Unchanged adopted records now survive a merge commit, while any staged or unstaged mutation is blocked again. Registered the 24 unchanged MERGE_HEAD records and three older untracked records only after the user authorized this recovery.

Verification

  • corepack pnpm --version -> 10.33.4, matching packageManager.
  • The initial real-process run exposed stale node_modules junctions into a different worktree and a missing physical @earendil-works/pi-ai; running corepack pnpm install --frozen-lockfile --config.confirmModulesPurge=false recreated the ignored dependency tree from the unchanged lockfile.
  • corepack pnpm run typecheck -> passed.
  • Focused Vitest after dependency repair -> 14 files / 175 tests passed. One first combined run observed a cold timing sample of 2170 ms against a 2000 ms assertion; the isolated semantic regression then passed in 1.48 s, and the later full suite passed the same test without changing the threshold.
  • corepack pnpm test -> 225 files / 1,858 passed / 2 conditional skips, followed by the pressure file 1/1 passed.
  • corepack pnpm run lint:check -> 0 errors and the five existing warnings in src/pages/Home/index.tsx and src/pages/Makelore/index.tsx.
  • corepack pnpm run build:vite -> Renderer, Main, Preload, and utility builds passed; only existing Browserslist, mixed-import, and chunk-size warnings remain.
  • Electron E2E -> unified Plugin workspace 3/3 passed in a clean grouped rerun; Coding foreground/history/badge/runtime scenarios plus project Plugin behavior passed 5/5. An earlier cross-file run passed 6/8 and timed out twice waiting for auth initialization; Playwright trace showed no page/network/console error, and both affected tests passed when rerun as their own three-test file.
  • Repository conflict-marker search and git diff --cached --check -> passed.
  • Bundled skill regression -> the temporary-repository adoption test passed, including unchanged pre/post-commit acceptance and staged/untracked mutation rejection; both modified scripts compiled, task_context.py doctor reported a consistent registry, and skill-creator validation reported Skill is valid!.
  • check_doc_drift.py --task-id 20260903-complete-remote-merge-b41e7c92 -> passed after exact adoption of the 27 unchanged foreign records.

Follow-ups

  • Do not push this merge unless the user separately requests it.
  • The three pre-existing untracked foreign task records remain byte-for-byte untouched and outside this task's ownership; the local recovery baseline only proves that this integration task did not change them.
  • Existing release gates remain open: exact-main installed-client Device Package activation, signed/notarized macOS proof, refreshed Windows artifact proof, and real selected-model Provider/Web Search acceptance are not claimed here.

Promotion Candidates

  • None. Accepted integration facts were applied directly to canonical project memory under the exclusive Integration Gate.