Files
makelore/.project-docs/30-worklog/tasks/20261009-makelore-product-integration-29d647c5.md
T

8.0 KiB

Task: Integrate implemented community product boundaries

Identity

  • Task ID: 20261009-makelore-product-integration-29d647c5
  • Mode: Integration
  • Branch: codex/20261009-makelore-product-integration-29d647c5-product-integration
  • Worktree: D:\Datas\OthersProjects.codex-worktrees\makelore\20261009-makelore-product-integration-29d647c5
  • Base commit: 0d442ce576
  • Owner: codex
  • Status: Ready for Integration

Scope

  • Integrate the approved product design and implemented source into this isolated integration branch; update canonical architecture, rules, current state, evidence and remaining rollout work. Preserve all source task records and original worktrees.

Intent And Constraints

  • User explicitly authorized transfer of WS 20261008-integrate-product-design-50fdab23, LMS 20261008-integrate-product-design-b23c91e7 and Makelore 20260929-merge-teacher-stream-1e4177fe. Official release --force changed only those registrations/locks; old directories, branches, files and uncommitted contents retained.
  • Concurrent/Planning/Integration Gates Passed: bundled check/start/status matched this task, integration mode, absolute worktree, branch and recorded source base. Required entry, positioning, architecture/domain, accepted decisions, success/evidence/reflection/commitment context and source outcomes/candidates loaded. WS 277/LMS 26/Makelore 146 peer records read; none changed since preceding continuation. Historical Gateway record lacks Intent And Constraints, without a concrete dependency.
  • Project goal: community supplies courses/tools/support and public learning/works; institutions independently manage teaching with optional LMS; Makelore is a creation tool without courses. Current focus: unite separate approved design and implementation histories, amend only later explicitly confirmed behavior, and separate local evidence from deployment. Preserve existing wallet/family/tenant/publication boundaries. No subagents, primary-checkout adoption, main-branch changes, push, deployment, payment or worktree deletion.
  • Decisions: parents recharge while logged into the child's account; permanent manual per-child points; child-initiated publication; no institution labels in ordinary community; no client course UI/context/deep links/learningOrigins. These user decisions supersede the old design's pending recharge choice and client task entry; no new product decision needed. Source verification remains applicable because application code will remain unchanged.
  • Implementation plan after gates: merge the retained WS/LMS design commits into the new integration branches, reconcile canonical text with actual feature contracts, verify source-code equality and unchanged imported task records, check edited links and documentation boundaries, then commit and complete the integration records. Makelore needs only canonical creation/recharge boundaries and status.

Outcome

  • Promoted implemented D01 and the explicitly confirmed creation-only client boundary from source 0d442ce into community-collaboration, positioning, architecture/module/data-flow, permanent-point rules, success criteria, indexes, evidence and current state. Removed obsolete parent-only recharge and client course assumptions. Preserved teachers/agents and retired Learning data rules; no application change.
  • All code, tests, deployment configuration and dependencies match the verified implementation source. This is a local isolated integration branch, not a main-branch promotion, deployment or client release. Shared state records exact Integrated Through source commits and keeps real-world acceptance gaps explicit. All original worktrees, branches and uncommitted files retained.

Verification

  • PASS: git diff from the recorded source base excluding Markdown is empty; untracked files are Markdown only. This proves application/configuration/test equality with the source and avoids repeating unaffected application tests.
  • PASS: 12 added local document links resolve; no missing targets. 0 imported source task/proposal records compare unchanged to the retained design commit. git diff --check (working/staged) and check_project_docs.py passed; canonical text no longer presents implemented collaboration or client courses as pending design.
  • PASS: official check_doc_drift.py after integration commit 12af6aed5d validates canonical ownership and unchanged source imports through shared ancestry. The pre-commit WS check could not yet prove the five staged imports; after recording the real merge parents it passes without adoption, source edits or bypass. All three check_project_docs.py/drift gates passed. Original WS/LMS design checkouts retain their exact HEAD/branch and clean state; original Makelore main retains its HEAD and same three untracked documents.
  • Task Documentation Gate complete: reviewed source-base-to-integrated changes, recorded actual outcomes/verification/remaining rollout work and exact sources, retained all directories/branches, and prepared this final Ready for Integration record. No main-branch merge occurred, so no cleanup action or new cleanup permission is needed.

Follow-ups

  • Promote the completed integration branches to the main branches in a separately coordinated step; preserve the foreign changes already present in the original WS/Makelore checkouts and the LMS feature owner. No main worktree was claimed or switched here.
  • Real institution/course pilot, production OSS/long-video/network, actual payment provider/settlement, native devices and WeChat tool pages remain acceptance work. Automatic adoption receipts are unimplemented; Operations records actual delivery manually. Do not revive cancelled Makelore course features or repeat completed D06/D07 work.

Promotion Candidates

  • Promoted the user-confirmed community/institution/client boundaries and implemented contracts into canonical documents. Exact feature and retained design sources are in current-state Integrated Through. Old historical records stay read-only; current-account recharge and no-course-client policy derive from explicit user decisions, not inferred timestamps. No further product decision or ownership handoff is required for this integration.

Remaining-work review · 2026-10-09

  • Same-task follow-up requested by the user: compare the approved detailed design and later scope decisions with current code, branch delivery and acceptance evidence. Official start/status and Planning Gate passed; peer records are unchanged since integration. Status audit only; no application edits, merge, deployment, real payment or workspace deletion. Findings follow after source inspection.

  • Findings: Confirmed D01 source 281e6dc remains implemented and formally documented. No further course work is pending: user's explicit instruction cancelled it. main remains fe1a3775; current-account recharge code and canonical documentation are on the retained integration branch. Matching installed build, actual payment provider and child-account credit acceptance remain unverified.

  • Cross-project follow-ups: main-branch delivery, coordinated migrations/API/clients, real OSS/media/package/network, institution/course pilot, actual payment and selected native/WeChat/installed-client acceptance. Real course, institution, support/commercial terms and public-display/promotion-use authorization remain business inputs; no new scope inferred from historical pending bullets.

  • Verification for this status review: inspected original approved design, current canonical/ordinary docs, relevant source/configuration, main branch refs and source-to-integrated application equality. Application code unchanged; existing phase-specific test evidence retained rather than rerun. Only own task records and WS task-owned evidence are updated; no main merge, push, deployment, payment, subagent or cleanup.

  • PASS: source-to-integrated non-Markdown diff is empty; current edits remain task-owned documentation only. Official project-docs structure and task drift gates passed for all three repositories; six evidence-report links resolve. Task Documentation Gate completed for this status follow-up.