Files
makelore/.project-docs/30-worklog/tasks/20260928-merge-agent-single-chat-9911c6df.md
T

4.3 KiB

Task: Integrate one ongoing conversation per delivered agent

Identity

  • Task ID: 20260928-merge-agent-single-chat-9911c6df
  • Mode: Integration
  • Branch: main
  • Worktree: D:\Datas\OthersProjects\makelore
  • Base commit: a1d52c60d8
  • Owner: codex
  • Status: Ready for Integration

Scope

  • Merge source e54f3d2 and 7aa81da into local main; promote the approved account-agent ongoing conversation contract.

Intent And Constraints

  • Concurrent and Planning Gates Passed. Official start/status match Identity and exclusive integration ownership. Loaded required entry, own/source tasks, relevant accepted ADR, architecture/domain/evidence/reflection/commitments and peer task scopes. Historical placeholder scopes remain unknown but have no concrete dependency on this merge.
  • User authorized main merge and explicitly approved releasing completed 20260928-merge-consultation-scope-ml-7b56cbe4 and adopting three known foreign task documents. Preserve them unchanged and exclude them from commits. Source task/proposal remain read-only.
  • Registered the exact unchanged source task/proposal imported by the authorized merge before committing, following the documented source-record adoption procedure. Same-task official resume/status and refreshed Planning Gate passed with unchanged base and scope.
  • Approved account-agent chat replaces visible project/version topics; each accepted execution still freezes project/Pi/version, student payer and readonly tool scope. No changes to Pi project ownership.
  • Observer task 20260928-agent-observer-design-9c41a872 remains uncommitted and separate; authorized coordination sent. Its later merge must adapt durable suggestion delivery/discussObservation to this chat and jointly test idempotency, unread state, scope and focus. Do not import its unfinished code here.
  • Plan: merge exact source without rewriting product files, reconcile accepted canonical rules, verify source product/history preservation and documentation boundaries, then commit/complete. Reuse source verification if product/test tree is identical; rerun only checks justified by integration changes.
  • No new subagents, push, deployment, packaging, paid model calls or cleanup.

Outcome

  • Source 7aa81da (including design e54f3d2) merged conflict-free into local main. Product, tests, README and source records are byte-identical to the verified source; main's separate consultation-scope diagnosis remains preserved.
  • Promoted approved account-agent conversation identity, per-turn project/Pi/version scope, paged persistence, read receipts, drafts and retained legacy archives into the teacher ADR, architecture, domain rules, decision/evidence indexes and Integrated Through.
  • Explicitly recorded that legacy Renderer check-ins stop for delivered-agent chats and the independent observation implementation is not part of this merge. Its later integration must adapt durable advice delivery rather than creating project topics.
  • Three adopted foreign documents remain unchanged and excluded. No push, packaging, installation, deployment or cleanup.

Verification

  • Source verification reused because integration changes only canonical/task documentation beyond the exact source: 365 related tests, Renderer typecheck, changed-file ESLint, Vite build and one real Electron interaction with deterministic Host fixture passed. Expanded Main has the same 66 pre-existing diagnostics; no live paid-model claim.
  • Conflict-free merge, exact product/test/source-record preservation, git diff --check and task-aware documentation drift checks passed. The official gate also verifies the three adopted external records retain their original bytes/index state. Main's earlier diagnosis commits are retained as the first-parent history.

Follow-ups

  • Observer task 20260928-agent-observer-design-9c41a872 must consume this main and complete same-chat suggestion delivery/read receipts/idempotency/scope/focus tests before its own merge. Existing thread coordination is user-authorized.
  • Production/installed-client acceptance and optional task worktree cleanup are separate. No cross-device history synchronization is implemented.

Promotion Candidates

  • Accepted and promoted the source account-agent/per-turn contract under the user's implementation and merge approval; no unresolved product-direction choice. Source task/proposal remain unchanged historical records.