5.0 KiB
5.0 KiB
Task: Complete current remote main merge
Identity
- Task ID: 20260907-complete-current-merge-b61e4a93
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit:
4b894c7e32 - Owner: codex-root
- Status: Ready for Integration
Scope
- Take over the already-started merge of local
main@4b894c7with fetchedorigin/main@918f8f8after the user's explicit authorization. - Resolve the seven remaining conflicts across AI Design source/tests and canonical project memory, preserving compatible intent from both histories.
- Verify the reconciled tree and create the ordinary two-parent merge commit locally. A remote push is not part of this request.
Intent And Constraints
- Preserve the remote Canvas right-side Works rail, central active production plan,
stable
@图片Nreference flow, retired Prompt Museum surface, retired Learning module, directory-only project creation, non-blocking/chatentry, and Project Configuration-owned Plugin workspace. - Preserve the local Main-normalized, operation-scoped
design.assistant.progressactivity projection alongside the existing single provisional assistant delta. Neither projection may become a conversation, Current Specification, authorization, or chain-of-thought surface. - Resolve semantic conflicts from base/ours/theirs and source-task evidence; do not choose a side mechanically, rewrite history, abort/reset/stash the merge, or alter unrelated user work.
- Keep all adopted foreign task records byte-for-byte unchanged. In particular, leave the three pre-existing untracked task records outside this task's commit.
- Retain existing external acceptance limits: no production deployment, paid Provider, signed-package, real-account, or publication success is claimed by a local merge.
Outcome
- Reconciled local
main@4b894c7with fetchedorigin/main@918f8f8; the index now has no unmerged paths and is ready for the ordinary two-parent merge commit. - Combined the remote central Canvas plan, right-side Works rail, plan history, stable reference aliases, and inline Quote flow with the local operation-scoped activity panel. Pending user message, activity, and provisional assistant reply remain one ordered group; completed activity follows its canonical user turn.
- Reconciled ADR-007, architecture maps, business rules, and current state around one Current Specification authority. Removed the obsolete required-Agent entry from current state and did not restore Learning or the Prompt Museum Renderer surface.
- Preserved the remote directory-only project flow, non-blocking no-Agent chat entry, Project Configuration Plugin sheet, all staged source-task history, and the three pre-existing untracked task records.
- No history rewrite, remote push, package, deployment, publication, database change, paid Provider call, or historical user-data mutation was performed.
Verification
- Pinned package manager:
pnpm@10.33.4confirmed through Corepack. pnpm run typecheck— passed.- Focused Vitest across Image Canvas, Workspace Store/Route/adapter, youth plan, and reference aliases — 6 files / 90 tests passed.
pnpm run lint:check— passed with 0 errors and 5 existing warnings insrc/pages/Home/index.tsxandsrc/pages/Makelore/index.tsx.pnpm run build:vite— Renderer, Electron Main, Preload, and utility worker passed; only existing Browserslist, mixed-import, and chunk-size warnings were emitted.- Targeted Electron E2E across Canvas, retired Learning navigation, Code project identity/navigation, Project Configuration, and Plugin flows — 12/12 passed.
pnpm test— 225 files / 1,933 tests passed and 2 skipped; one unchanged test inpi-agent-server-process-real.test.tsfailed its two-second timing assertion. The test and Pi worker/write-lease/Agent Server blobs are identical in base, both parents, and the merge index. An isolated run completed the functional path in 3.139 seconds but still exceeded the threshold; a later isolated run timed out during slow process startup. The separately skipped pressure test passed 1/1. Full-suite green is not claimed, and no unrelated threshold or Pi code was changed.- Conflict-marker scan, unmerged-path scan, and
git diff --cached --check— passed. - Required project-document structure and task-aware drift/ownership checks — passed; adopted foreign task-record fingerprints remain intact.
Follow-ups
- The existing Pi real-process two-second timing test remains a separate Windows test reliability/performance follow-up; this merge provides no evidence of a Pi code regression and does not change its behavior or threshold.
- Push
mainonly if the user separately requests publication toorigin.
Promotion Candidates
- Applied in this integration: ADR-007, module map, system overview, business rules, and current state now describe the combined central-plan/reference layout and operation-scoped transient activity contract. No further promotion is pending.