2.6 KiB
2.6 KiB
Task: Land AI Design agent activity UI on main
Identity
- Task ID: 20260907-land-design-agent-activity-e3b7a1c9
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit:
7bdb42f26c - Owner: codex-root
- Status: Ready for Integration
Scope
- Record and verify the root
mainlanding of reviewed candidate7bdb42f26c60747fbabf3bb3a00e3df3477a46a3. - Promote this root landing task as the current-state integration owner while preserving the retired candidate task record as immutable evidence.
- Preserve the three pre-existing untracked task records byte-for-byte and keep them outside this task's commit.
Intent And Constraints
- The candidate was fast-forwarded only after exact branch, ancestry, dirty-path, and fingerprint preflight; do not rewrite its product tree.
- Do not reset, stash, clean, stage, or edit unrelated work.
- Reuse candidate tests and independent review; run the final root document, drift, ancestry, fingerprint, and status gates that can detect landing-specific failures.
Outcome
mainwas fast-forwarded fromda29294979da4ce041edf992b590ee6ea170a44fto the exact reviewed candidate7bdb42f26c60747fbabf3bb3a00e3df3477a46a3.- The landed tree contains Main-normalized public Design activity, operation-scoped Renderer reconciliation, terminal convergence, and ordered optimistic-user/activity/provisional-reply groups.
- The three adopted task records retained preflight fingerprints
728a9d4a20d4f0c4fee82177807c07e2a207264c,2df2c08a55c2670f99588d3511deb1e533a6c97c, and0538a686602b1ee7ef907880d65f5cf176b9916f; they remain excluded from this task.
Verification
- Candidate evidence: 69 focused tests, TypeScript, focused ESLint,
pnpm run build:vite, andgit diff --checkpassed. - Independent client activity integration review: PASS after the two multi-operation findings were fixed and covered.
- Final root
check_project_docs.py, task-awarecheck_doc_drift.py, andgit diff --checkpassed.mainremained at the exact candidate, the candidate is an ancestor, no non-document delta exists, and all three adopted fingerprints remained unchanged.
Follow-ups
- Add an explicit snapshot/cursor reseed contract for a Gateway
cursor expiredresponse in a separate transport-resilience task.
Promotion Candidates
- Applied: ADR-007, system overview, module map, data flow, domain rules, and current integrated state define operation-scoped public activity as transient presentation, not Design authority or model reasoning.