# Task: Integrate AI Design agent activity UI ## Identity - Task ID: 20260907-integrate-design-agent-activity-b7d3f1a8 - Mode: Integration - Branch: codex/20260907-integrate-design-agent-activity-b7d3f1a8-integrate-design-agent-activity - Worktree: D:\Datas\OthersProjects\.codex-worktrees\makelore\20260907-integrate-design-agent-activity-b7d3f1a8 - Base commit: da29294979da4ce041edf992b590ee6ea170a44f - Owner: codex-root - Status: Ready for Integration ## Scope - Integrate client source commit `81b524a02c2cf51304090afa8fb89d27c72c5d2b` from exact base `da29294979da4ce041edf992b590ee6ea170a44f`. - Promote the operation-scoped AI Design activity projection into canonical client memory. - Verify Main event normalization, Renderer reconciliation, conversation rendering, and existing Design streaming behavior. ## Intent And Constraints - Render only the server's fixed public lifecycle stages beneath the matching optimistic user message. - Keep `design.assistant.delta` as the single provisional assistant-text stream and the right-side Living Form as the Current Specification projection. - Never render raw chain-of-thought, prompt/provider/tool payloads, or a duplicate global “整理进度” banner. - Preserve stable operation identity and existing unknown-result reconciliation. - Do not touch or adopt unrelated changes in the root worktree. ## Outcome - Fast-forwarded the exact source commit from the recorded base without conflict. - Integrated Main-normalized public Design activity, operation-scoped Renderer reconciliation, terminal-event convergence, and the conversation-attached activity panel while preserving optimistic user messages and canonical assistant replacement. - Fixed two integration-review findings: a later chat no longer erases earlier completed/unknown activity, and each pending operation now renders its user message, activity, and provisional assistant stream as one ordered group. - Promoted the accepted transient-activity boundary into ADR-007, architecture maps, data flow, domain rules, and current integrated state. - No server contract, database, billing, Quote/Task, navigation, package, deployment, publication, or Provider behavior changed. ## Verification - `pnpm exec vitest run tests/unit/image-workspace-store.test.ts tests/unit/image-canvas-page.test.tsx tests/unit/works-square-design-workspace.test.ts tests/unit/image-workspace-route.test.ts` — 69 passed. - `pnpm exec tsc --noEmit` — passed. - Focused ESLint across all eight changed TypeScript/TSX files — passed. - `pnpm run build:vite` — passed; only existing chunk-size, dynamic-import, and stale Browserslist-data warnings were emitted. - `git diff --check` — passed. - Independent integration review — PASS after the two multi-operation findings were fixed and covered. ## Follow-ups - Add an explicit snapshot/cursor reseed contract for a Gateway `cursor expired` response in a separate transport-resilience task. ## Promotion Candidates - Applied: ADR-007, system overview, module map, data flow, domain rules, and current integrated state now define operation-scoped public activity as transient presentation rather than Design authority or model reasoning.