# Task: Complete current remote main merge ## Identity - Task ID: 20260907-complete-current-merge-b61e4a93 - Mode: Integration - Branch: main - Worktree: D:\Datas\OthersProjects\makelore - Base commit: 4b894c7e320cdf829888f63f501d176f051be7d7 - Owner: codex-root - Status: Ready for Integration ## Scope - Take over the already-started merge of local `main@4b894c7` with fetched `origin/main@918f8f8` after the user's explicit authorization. - Resolve the seven remaining conflicts across AI Design source/tests and canonical project memory, preserving compatible intent from both histories. - Verify the reconciled tree and create the ordinary two-parent merge commit locally. A remote push is not part of this request. ## Intent And Constraints - Preserve the remote Canvas right-side Works rail, central active production plan, stable `@图片N` reference flow, retired Prompt Museum surface, retired Learning module, directory-only project creation, non-blocking `/chat` entry, and Project Configuration-owned Plugin workspace. - Preserve the local Main-normalized, operation-scoped `design.assistant.progress` activity projection alongside the existing single provisional assistant delta. Neither projection may become a conversation, Current Specification, authorization, or chain-of-thought surface. - Resolve semantic conflicts from base/ours/theirs and source-task evidence; do not choose a side mechanically, rewrite history, abort/reset/stash the merge, or alter unrelated user work. - Keep all adopted foreign task records byte-for-byte unchanged. In particular, leave the three pre-existing untracked task records outside this task's commit. - Retain existing external acceptance limits: no production deployment, paid Provider, signed-package, real-account, or publication success is claimed by a local merge. ## Outcome - Reconciled local `main@4b894c7` with fetched `origin/main@918f8f8`; the index now has no unmerged paths and is ready for the ordinary two-parent merge commit. - Combined the remote central Canvas plan, right-side Works rail, plan history, stable reference aliases, and inline Quote flow with the local operation-scoped activity panel. Pending user message, activity, and provisional assistant reply remain one ordered group; completed activity follows its canonical user turn. - Reconciled ADR-007, architecture maps, business rules, and current state around one Current Specification authority. Removed the obsolete required-Agent entry from current state and did not restore Learning or the Prompt Museum Renderer surface. - Preserved the remote directory-only project flow, non-blocking no-Agent chat entry, Project Configuration Plugin sheet, all staged source-task history, and the three pre-existing untracked task records. - No history rewrite, remote push, package, deployment, publication, database change, paid Provider call, or historical user-data mutation was performed. ## Verification - Pinned package manager: `pnpm@10.33.4` confirmed through Corepack. - `pnpm run typecheck` — passed. - Focused Vitest across Image Canvas, Workspace Store/Route/adapter, youth plan, and reference aliases — 6 files / 90 tests passed. - `pnpm run lint:check` — passed with 0 errors and 5 existing warnings in `src/pages/Home/index.tsx` and `src/pages/Makelore/index.tsx`. - `pnpm run build:vite` — Renderer, Electron Main, Preload, and utility worker passed; only existing Browserslist, mixed-import, and chunk-size warnings were emitted. - Targeted Electron E2E across Canvas, retired Learning navigation, Code project identity/navigation, Project Configuration, and Plugin flows — 12/12 passed. - `pnpm test` — 225 files / 1,933 tests passed and 2 skipped; one unchanged test in `pi-agent-server-process-real.test.ts` failed its two-second timing assertion. The test and Pi worker/write-lease/Agent Server blobs are identical in base, both parents, and the merge index. An isolated run completed the functional path in 3.139 seconds but still exceeded the threshold; a later isolated run timed out during slow process startup. The separately skipped pressure test passed 1/1. Full-suite green is not claimed, and no unrelated threshold or Pi code was changed. - Conflict-marker scan, unmerged-path scan, and `git diff --cached --check` — passed. - Required project-document structure and task-aware drift/ownership checks — passed; adopted foreign task-record fingerprints remain intact. ## Follow-ups - The existing Pi real-process two-second timing test remains a separate Windows test reliability/performance follow-up; this merge provides no evidence of a Pi code regression and does not change its behavior or threshold. - Push `main` only if the user separately requests publication to `origin`. ## Promotion Candidates - Applied in this integration: ADR-007, module map, system overview, business rules, and current state now describe the combined central-plan/reference layout and operation-scoped transient activity contract. No further promotion is pending.