Verify combined navigation, drafts and workspace delivery contracts
Electron E2E / Electron E2E (macos-latest) (push) Waiting to run
Electron E2E / Electron E2E (ubuntu-latest) (push) Waiting to run
Electron E2E / Electron E2E (windows-latest) (push) Waiting to run

This commit is contained in:
鲨鱼辣椒 committed 2026-10-14 00:29:58 +08:00
1 parent a106dc16f5
commit 592ff38f00
3 files changed
+26 -12

No files matched your search

@@ -25,7 +25,7 @@
## Outcome
- Canvas implementation complete: Agents-style navigation/composer/Markdown, 64px identity header, resizable 42/58 workspace, current output preview and historical selection, one persistent editable production card, <=899px compact panel switching. Hidden videos pause; modal Escape does not change split focus; compact creation no longer opens two dialogs.
- Coordinated integration, normal main push, live temporary-application update and worktree retirement remain pending. Canvas source2ca6e31; Code-navigation chat completed product source d287d5ac (handoff15848cd). The committed effective Renderer non-project-doc delta from baseline70166d2 was applied through Git three-way merge, preserving Canvas and all current Sidebar/TOOL/SKILL/knowledge-upload fixes; its live verification is blocked by Mac lock. Channel-adapter chat completed source979596f. Its non-project-doc product/test/README delta was also three-way merged cleanly. Combined typecheck/scoped ESLint and all443 selected units passed. The accepted non-project-doc code deltas were three-way merged before recording source ancestry with a metadata-only merge of Code15848cd and channel979596f. This preserves source commit history without changing their read-only task records or importing canonical-memory changes into feature mode; no Yuxi files were changed. Required unlock question is pending; no app mutation has occurred in this task.
- Coordinated source integration complete. The final product tree includes Canvas2ca6e31, effective Code/sidebar/advanced source d287d5ac / handoff15848cd and channel979596f; ancestry mergea106dc1 preserves both delivered histories. Normal main push and immutable packaging follow final evidence commit. Live temporary-application activation and worktree retirement still await native saved/quit/UI verification. Canvas source2ca6e31; Code-navigation chat completed product source d287d5ac (handoff15848cd). The committed effective Renderer non-project-doc delta from baseline70166d2 was applied through Git three-way merge, preserving Canvas and all current Sidebar/TOOL/SKILL/knowledge-upload fixes; its live verification is blocked by Mac lock. Channel-adapter chat completed source979596f. Its non-project-doc product/test/README delta was also three-way merged cleanly. Combined typecheck/scoped ESLint and all443 selected units passed. The accepted non-project-doc code deltas were three-way merged before recording source ancestry with a metadata-only merge of Code15848cd and channel979596f. This preserves source commit history without changing their read-only task records or importing canonical-memory changes into feature mode; no Yuxi files were changed. Required unlock question is pending; no app mutation has occurred in this task.
## Verification
@@ -36,6 +36,9 @@
## Follow-ups
- Combined actual Electron/browser fixtures: 18 unique cases passed (Canvas/channels4, community9, Code/navigation5). Three-way integration exposed inherited assertions for the replaced community entry, current attachment thumbnails, the existing filter query and the new toolbar/record-dialog layout; test-only fixes retain behavior/geometry/first-send/draft/attachment/navigation checks. Type/scoped lint and whitespace checks passed. Controlled screenshots and complete passed logs are preserved outside the source worktree.
- Native CUA independently confirmed Mac locked on 2026-10-14; the user unlock question remains unanswered. Do not activate files, quit/launch the app, finalize a false UI receipt or retire the owned source tree until the required native confirmation is possible. Other selected chats are idle/completed.
- Finish both user-selected chat dependencies before staging combined runtime. Inspect fresh pointer, actual compatibility symlink and Main source; never reuse the rejected broad Code visual variant. Preserve unrelated primary checkout task record and stable profile/runtime/dependency links during cleanup.
## Promotion Candidates