docs: record PI-060 planner approval
This commit is contained in:
@@ -8,7 +8,7 @@
|
|||||||
- Worktree: D:\Datas\OthersProjects\makelore-pi-event-projector-91c6a7e4
|
- Worktree: D:\Datas\OthersProjects\makelore-pi-event-projector-91c6a7e4
|
||||||
- Base commit: e79aeffffab16c4c5570971e24d1a20997be681d
|
- Base commit: e79aeffffab16c4c5570971e24d1a20997be681d
|
||||||
- Owner: codex
|
- Owner: codex
|
||||||
- Status: Completed — pending planner re-review
|
- Status: Completed — planner Pass
|
||||||
|
|
||||||
## Scope
|
## Scope
|
||||||
|
|
||||||
@@ -82,6 +82,10 @@
|
|||||||
0.84.2 failed auto-retry and all three summarization-retry events now project
|
0.84.2 failed auto-retry and all three summarization-retry events now project
|
||||||
bounded retry traces and redacted failure state, with `agent_settled`
|
bounded retry traces and redacted failure state, with `agent_settled`
|
||||||
preserving `terminalReason: failed`.
|
preserving `terminalReason: failed`.
|
||||||
|
- Planner re-review of cumulative HEAD
|
||||||
|
`4bbe3f8b1eb383f4b49caa9ad6d3577a955c619d` returned **Pass** with no
|
||||||
|
remaining Standards or Spec finding. PI-060 is Done; the unchanged
|
||||||
|
18-node/31-edge graph now exposes PI-070 as the only Ready Frontier.
|
||||||
- Added a Main-private `PiEventProjector` for exact Pi 0.84.2 live RPC
|
- Added a Main-private `PiEventProjector` for exact Pi 0.84.2 live RPC
|
||||||
shapes. It projects stable message/content-index streams, cumulative tool
|
shapes. It projects stable message/content-index streams, cumulative tool
|
||||||
output, authoritative `toolResult`, retry/turn/compaction boundaries, queue,
|
output, authoritative `toolResult`, retry/turn/compaction boundaries, queue,
|
||||||
@@ -124,11 +128,17 @@
|
|||||||
files / 81 tests after an isolated Windows temporary-file `rename EPERM`
|
files / 81 tests after an isolated Windows temporary-file `rename EPERM`
|
||||||
was rerun successfully; the later full suite passed without recurrence.
|
was rerun successfully; the later full suite passed without recurrence.
|
||||||
- `git diff --check` — passed.
|
- `git diff --check` — passed.
|
||||||
|
- Planner independent re-review — passed: targeted 14/14, all Pi 81/81,
|
||||||
|
typecheck, commit whitespace, and project-docs gates. Independent probes
|
||||||
|
observed `seq 7 -> hydrate 7 -> patch 8`, ordinary retry
|
||||||
|
`retrying -> error/failed -> idle/failed`, and summary retry
|
||||||
|
`compacting -> retrying -> compacting -> error/failed -> idle/failed` with
|
||||||
|
no raw Provider error in Snapshot or diagnostics.
|
||||||
|
|
||||||
## Follow-ups
|
## Follow-ups
|
||||||
|
|
||||||
- Re-submit the cumulative PI-060 commits for planner review. Do not start
|
- PI-070 is the next and only Ready Frontier. PI-100 remains locked until
|
||||||
PI-070 until the planner marks the two review findings closed and PI-060 Done.
|
PI-070 is Done.
|
||||||
- PI-070 owns registered extension tool-detail schemas and interaction response
|
- PI-070 owns registered extension tool-detail schemas and interaction response
|
||||||
behavior; PI-060 deliberately keeps unknown/custom payloads hidden or in
|
behavior; PI-060 deliberately keeps unknown/custom payloads hidden or in
|
||||||
bounded metadata-only diagnostics.
|
bounded metadata-only diagnostics.
|
||||||
|
|||||||
Reference in New Issue
Block a user