docs(marketplace): close release a acceptance

This commit is contained in:
brother7 committed 2026-08-30 11:50:06 +08:00
1 parent 474c6f7688
commit 40df677a31
1 file changed
+35 -7
@@ -8,7 +8,7 @@
- Worktree: D:\Datas\OthersProjects\makelore-plugin-marketplace-client-5f8b3d72 - Worktree: D:\Datas\OthersProjects\makelore-plugin-marketplace-client-5f8b3d72
- Base commit: 1ca8deb54b7b530ab8c5b6a5b7e613730c3b97ec - Base commit: 1ca8deb54b7b530ab8c5b6a5b7e613730c3b97ec
- Owner: codex-root - Owner: codex-root
- Status: In Progress - Status: Completed
## Scope ## Scope
@@ -148,6 +148,16 @@
## Outcome ## Outcome
- Marketplace Release A MakeLore implementation and live acceptance are complete.
The final R6 source commit
`32f703e1f4e41b1e7314bd63c6a034c1e412c9fb` was integrated as product commit
`c56ddb9d3b14990f5dcd4f12eaa58d925e569292`; final reviewed documentation head was
`474c6f7688fb728641da5f567e42bbf05ad45117`.
- R7 Standards and Spec independently passed the fixed range
`1ca8deb54b7b530ab8c5b6a5b7e613730c3b97ec...474c6f7688fb728641da5f567e42bbf05ad45117`
with zero actionable findings. XMA-01 then passed all twelve Release A groups.
Production trust activation remains HOLD only because the official Ed25519 public
key has not been supplied; the packaged app correctly fails closed without it.
- MLM-00 completed. The coordinator unit is isolated from the exact accepted P0 - MLM-00 completed. The coordinator unit is isolated from the exact accepted P0
evidence head, both documentation gates pass, semantic overlap is clear, and no evidence head, both documentation gates pass, semantic overlap is clear, and no
client product file changed before opening MLM-01. client product file changed before opening MLM-01.
@@ -354,15 +364,33 @@
documentation-drift, task-context completion, sole-parent, and clean-worktree gates documentation-drift, task-context completion, sole-parent, and clean-worktree gates
passed. No trust key, package layout, packaged resource, or artifact verifier changed, passed. No trust key, package layout, packaged resource, or artifact verifier changed,
so artifact packaging was not repeated before the fresh fixed-range review. so artifact packaging was not repeated before the fresh fixed-range review.
- MLM-06 R7 Standards task `20260830-marketplace-mlm06-standards-r7-a8c4e291`
and Spec task `20260830-marketplace-mlm06-spec-r7-b7d5f3a2` both returned PASS
with zero findings at exact clean head
`474c6f7688fb728641da5f567e42bbf05ad45117`. They rechecked Package Store cleanup,
Stable/Beta channel authority, system-included Data Service projection, account
cache/intent, effective resolver/registry/Pi lifecycle, Main/Renderer authority,
packaged trust reachability, and Release B exclusions.
- XMA-01 used the signed-in packaged Windows application at that exact head against
the real reviewed server and PostgreSQL. Marketplace and Data Service catalog/detail
were visible; account A Library state was isolated from account B; package install,
project enablement, Agent assignment, Pi materialization, immutable update/freeze,
cached rollback, lifecycle/account switching, and unknown-key fail-closed behavior
passed. System-included Data Service exposed no account/device download action.
- Final x64 staging, electron-builder, Windows artifact verification, and packed
Marketplace/Pi proof passed. `Makelore-2.0.0-win-x64.exe` was 208,235,670 bytes with
SHA-256 `738A2F6573C502281787F418EA666C6E62C287CA0EC13C6EB22369DAB0B3FFFA`.
The aggregate wrapper's only deviations were two external GitHub uv 0.10.0 download
reset/timeouts; exact cached uv 0.10.0 binaries were verified and used for the
successful x64 stage/build. No tracked client file changed during acceptance.
## Follow-ups ## Follow-ups
- Run fresh fixed-range MLM-06 R7 Standards and Spec reviews from the post-R6 - Production activation remains HOLD until the official Ed25519 public key is built
coordinator documentation checkpoint. Use one remediation owner only if a into MakeLore. The matching server private key must remain deployment-secret-only;
supported Release A finding remains. no production key was generated or committed.
- Keep XMA-01, production activation, deployment, publication, push/PR, and every - Release B remains closed behind PROVIDER-GATE. No hosted Provider/runtime, metering,
Release B/Provider/hosted ticket closed until both repository reviews pass and the refund, Plugin Charges, XMB-01, deployment, publication, push, or PR was started.
required external inputs exist.
## Promotion Candidates ## Promotion Candidates