@@ -0,0 +1,95 @@
# Task: Recover Pi integration and merge updater fix
## Identity
- Task ID: 20260826-recover-pi-updater-integration-8f3a6c21
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 48a9189939f3f9a581a76e9d6f5ba2f49879a67c
- Owner: codex
- Status: Verification complete; documentation gate pending
## Scope
- Recover the abandoned Pi integration documentation already present in the
`main` worktree and validate it against the completed Pi source-task records.
- Integrate the updater downgrade-prevention change from source commit
`2e61800fed793b63b3b7804a03a4c7d8617e23d7` into `main`.
- Verify the focused updater behavior, type safety, lint, and production Vite
build before handing back the integrated branch.
- Preserve unrelated untracked task records byte-for-byte and outside this
task's commits.
## Intent And Constraints
- User explicitly authorized force-releasing and taking over the abandoned Pi
integration task.
- Treat completed source task records as read-only evidence; promote only the
canonical Pi documentation that is supported by those records.
- Keep unverified Pi release gaps explicit: real Provider execution, macOS
x64/arm64 packaged artifacts, and native non-WSL Linux remain unverified.
- Apply only the two updater source/test changes from the verified feature
commit so the feature task record remains source-owned.
- Do not modify, delete, or commit
`20260819-package-learning-off-115-9c4d.md` or the superseded Pi integration
task record without separate authority.
## Plan
1. Validate the pending Pi canonical documentation against source-task facts
and current product boundaries.
2. Apply the verified updater downgrade guard and its focused regression tests.
3. Run focused tests, typecheck, scoped lint, and `build:vite`; inspect the
final diff and commit the integrated result on `main`.
4. Run the Task Documentation Gate, release ownership, and report any remaining
foreign-record blocker without weakening or bypassing the gate.
## Outcome
- Recovered and semantically reviewed the pending Pi canonical documentation
against the completed hard-cutover, provider, release-proof, legacy-removal,
and background-run source tasks.
- Integrated the exact updater source/test change from
`2e61800fed793b63b3b7804a03a4c7d8617e23d7` into `main` without copying or
editing its source-owned task record.
- Automatic update channel selection and later channel changes now explicitly
restore `autoUpdater.allowDowngrade = false`, preventing installed `2.0.0`
from treating online `1.1.9` as an available update.
- Preserved both unrelated/unregistered task records byte-for-byte and outside
the staged integration set.
## Verification
- Exact source parity:
`git diff --exit-code 2e61800 -- electron/main/updater.ts tests/unit/app-updater.test.ts`
passed before task-record finalization.
- `pnpm exec vitest run tests/unit/app-updater.test.ts`: passed, 1 file / 15 tests.
- `pnpm run typecheck`: passed.
- `pnpm exec eslint electron/main/updater.ts tests/unit/app-updater.test.ts`: passed.
- `pnpm test`: passed, 181 regular files / 1543 tests passed / 2 skipped,
followed by the pressure file with 1/1 passed.
- `pnpm run build:vite`: passed for Renderer, Electron Main, Preload, and the
release utility worker; existing dynamic-import and large-chunk warnings
remain warnings only.
- `git diff --check`: passed.
- `check_doc_drift.py --task-id 20260826-recover-pi-updater-integration-8f3a6c21`:
blocked only by the two preserved foreign task records listed below.
## Follow-ups
- Human authorization is required to move the unregistered foreign records
`20260819-package-learning-off-115-9c4d.md` and
`20260826-integrate-pi-provider-fix-6e4c2a91.md` out of the `main` worktree
into a recovery directory. Until then the Task Documentation Gate cannot
pass and integration ownership cannot be cleanly released.
- Real Provider execution, packaged macOS x64/arm64 artifacts, and native
non-WSL Linux artifacts remain explicitly unverified Pi release gates.
## Promotion Candidates
- Applied the already-supported Pi hard-cutover facts to the canonical success
criteria, decision index/ADR, architecture, current state, business rules,
evidence index, and commitments.
- No additional updater promotion candidate: the updater behavior is captured
by focused tests and does not change an architectural boundary.