docs: record final PI planner approval
This commit is contained in:
1 parent
6d2232c32f
commit
2e1b90b770
1 file changed
+16
-6
@@ -8,7 +8,7 @@
|
|||||||
- Worktree: D:\Datas\OthersProjects\makelore-pi-release-proof-3e725ac7
|
- Worktree: D:\Datas\OthersProjects\makelore-pi-release-proof-3e725ac7
|
||||||
- Base commit: 977445ba450f4ad32b6e6db2caf048517513ab39
|
- Base commit: 977445ba450f4ad32b6e6db2caf048517513ab39
|
||||||
- Owner: codex-root
|
- Owner: codex-root
|
||||||
- Status: Ready for Planner Re-review (PI-150 remains externally blocked by native non-WSL Linux evidence)
|
- Status: Implementation and Spec Pass; PI-150 externally blocked by native non-WSL Linux evidence
|
||||||
|
|
||||||
## Scope
|
## Scope
|
||||||
|
|
||||||
@@ -117,6 +117,12 @@
|
|||||||
- QG-004/QG-005 remain `Explicitly Waived / Accepted Risk`, with
|
- QG-004/QG-005 remain `Explicitly Waived / Accepted Risk`, with
|
||||||
`realTurnVerified=false`; concurrency, credential isolation, and protocol
|
`realTurnVerified=false`; concurrency, credential isolation, and protocol
|
||||||
compatibility against real Provider accounts are not claimed as Pass.
|
compatibility against real Provider accounts are not claimed as Pass.
|
||||||
|
- The planner's fourth fixed-range review closed both remaining P1 findings,
|
||||||
|
reported `Standards: Pass` and `Spec implementation review: Pass` with zero
|
||||||
|
new P0/P1/P2 findings, and independently reconfirmed the Windows packaged
|
||||||
|
delayed Provider milestone plus failure-injection/retry cleanup. The PI-150
|
||||||
|
gate itself remains `Blocked / Not Done` only because native non-WSL Linux
|
||||||
|
desktop/compositor evidence is still absent.
|
||||||
|
|
||||||
## Verification
|
## Verification
|
||||||
|
|
||||||
@@ -170,14 +176,18 @@
|
|||||||
provider-shaped smoke issued six requests per protocol (distinct cold, warm,
|
provider-shaped smoke issued six requests per protocol (distinct cold, warm,
|
||||||
and abort-isolation paths); real Provider verification remains false by the
|
and abort-isolation paths); real Provider verification remains false by the
|
||||||
explicit waiver.
|
explicit waiver.
|
||||||
|
- Planner re-review of `ead9d1d..6d2232c` passed the fixed diff and
|
||||||
|
documentation gates. Its independent Windows packaged rerun measured cold
|
||||||
|
and warm Provider-first milestones at `127/129 ms`, both sourced from
|
||||||
|
`pi.assistant_message_start` and strictly later than `agent.start`; cleanup
|
||||||
|
unit tests passed `2/2`, and the real 4+4 injected-failure run retained the
|
||||||
|
same handle for a successful retry with every PID, counter, permit, dispatch,
|
||||||
|
lease, and Provider request returning to zero.
|
||||||
|
|
||||||
## Follow-ups
|
## Follow-ups
|
||||||
|
|
||||||
- Request planner re-review of `ead9d1d..09841c8`. In addition to the earlier
|
- Planner re-review is complete: Standards and Spec implementation both pass,
|
||||||
packaged subagent, correlated timeline, and real 4+4 fixes, this range makes
|
the two remaining P1 findings are closed, and no new finding was raised.
|
||||||
Provider first-event timing response-backed with delayed-response assertions
|
|
||||||
and makes pressure cleanup bounded, failure-safe, and retryable with both
|
|
||||||
unit and final-product fault-injection evidence.
|
|
||||||
- Do not start PI-160 or integrate the candidate while PI-150 remains blocked
|
- Do not start PI-160 or integrate the candidate while PI-150 remains blocked
|
||||||
by the native non-WSL Linux platform evidence boundary. If the planner finds
|
by the native non-WSL Linux platform evidence boundary. If the planner finds
|
||||||
no new implementation defect, keep PI-150 as the active frontier until that
|
no new implementation defect, keep PI-150 as the active frontier until that
|
||||||
|
|||||||
Reference in new issue
Block a user