chore(coding): record ML-08 verification
This commit is contained in:
@@ -8,7 +8,7 @@
|
|||||||
- Worktree: D:\Datas\OthersProjects\makelore-data-service-client-b72e4c19
|
- Worktree: D:\Datas\OthersProjects\makelore-data-service-client-b72e4c19
|
||||||
- Base commit: f2456039230f68e3ecb2c8653fc3379c23bbe5ce
|
- Base commit: f2456039230f68e3ecb2c8653fc3379c23bbe5ce
|
||||||
- Owner: codex-root
|
- Owner: codex-root
|
||||||
- Status: In Progress (ML-01 through ML-03 integrated)
|
- Status: In Progress (ML-01 through ML-08 integrated; ML-09/X-01 pending)
|
||||||
|
|
||||||
## Scope
|
## Scope
|
||||||
|
|
||||||
@@ -155,6 +155,13 @@
|
|||||||
this coordinator after cherry-pick; the source record remains in
|
this coordinator after cherry-pick; the source record remains in
|
||||||
`D:\Datas\OthersProjects\makelore-ml07-data-service-sdk-skill-6b4e91c2`.
|
`D:\Datas\OthersProjects\makelore-ml07-data-service-sdk-skill-6b4e91c2`.
|
||||||
The ML-08 frontier is `549069d` plus this coordinator cleanup/record commit.
|
The ML-08 frontier is `549069d` plus this coordinator cleanup/record commit.
|
||||||
|
- Completed ML-08 merge-and-verify on the exact clean product frontier
|
||||||
|
`a981b07faaa64b20bf9aef6353218fef26695ca2`, with fixed client base
|
||||||
|
`f2456039230f68e3ecb2c8653fc3379c23bbe5ce`. ML-01 through ML-07 are present
|
||||||
|
in dependency order through that product HEAD; this step made no product
|
||||||
|
changes. The five required verification commands and their one known E2E
|
||||||
|
failure are recorded below. The product HEAD immediately before this
|
||||||
|
documentation update was `a981b07faaa64b20bf9aef6353218fef26695ca2`.
|
||||||
|
|
||||||
## Verification
|
## Verification
|
||||||
|
|
||||||
@@ -348,6 +355,33 @@
|
|||||||
the Data Service skill assets, registry/display registration, focused tests,
|
the Data Service skill assets, registry/display registration, focused tests,
|
||||||
and the task record. `git diff --check` passed after foreign task-record
|
and the task record. `git diff --check` passed after foreign task-record
|
||||||
cleanup.
|
cleanup.
|
||||||
|
- ML-08 precondition: coordinator branch was clean at product HEAD
|
||||||
|
`a981b07faaa64b20bf9aef6353218fef26695ca2`, based on
|
||||||
|
`f2456039230f68e3ecb2c8653fc3379c23bbe5ce`; no product file was changed by
|
||||||
|
this verification step.
|
||||||
|
- ML-08 command ledger (run in this coordinator worktree):
|
||||||
|
`pnpm typecheck` — exit 0, passed, approximately 5.32s.
|
||||||
|
- `pnpm lint:check` — exit 0, passed with 0 errors and the same 5 existing
|
||||||
|
warnings in `src/pages/Home/index.tsx` and `src/pages/Makelore/index.tsx`,
|
||||||
|
approximately 10.01s.
|
||||||
|
- `pnpm test` — exit 0, passed; main suite 188 files / 1610 tests passed / 2
|
||||||
|
skipped (Vitest-reported 42.86s), followed by the pressure suite 1 file / 1
|
||||||
|
test passed (1.77s). No assertion failure or worker exit occurred.
|
||||||
|
- `pnpm test:electron:windows` — exit 0, passed; 2 files / 4 tests passed
|
||||||
|
(Vitest-reported 1.02s; command approximately 2.34s).
|
||||||
|
- `pnpm test:e2e` — exit 1; its required `build:vite` phases completed
|
||||||
|
successfully, then Playwright ran 26 tests with 25 passed and 1 failed.
|
||||||
|
The failure is the known `tests/e2e/pi-coding-first-chat.spec.ts:575`
|
||||||
|
`locator.selectOption` 30s timeout because combobox `当前对话模型` remained
|
||||||
|
disabled; this is not an E2E pass and remains a release/acceptance deviation.
|
||||||
|
Playwright reported approximately 1.0m for the run. The build emitted only
|
||||||
|
existing dynamic-import and chunk-size warnings.
|
||||||
|
- ML-08 post-command hygiene: `git diff --check` passed; the first drift
|
||||||
|
invocation was unavailable because `python` is not on the PowerShell PATH,
|
||||||
|
then the same `check_doc_drift.py --task-id
|
||||||
|
20260826-makelore-data-service-client-b72e4c19` check passed using the
|
||||||
|
configured bundled Python runtime. Test/build output remained ignored and
|
||||||
|
the worktree was clean before this task-record update.
|
||||||
|
|
||||||
## Follow-ups
|
## Follow-ups
|
||||||
|
|
||||||
@@ -361,7 +395,15 @@
|
|||||||
and ML-07 consumes only that local capability while keeping ordinary
|
and ML-07 consumes only that local capability while keeping ordinary
|
||||||
arbitrary URL opens data-free.
|
arbitrary URL opens data-free.
|
||||||
- The broader ML-00 through ML-09 coordinator task remains in progress; this
|
- The broader ML-00 through ML-09 coordinator task remains in progress; this
|
||||||
record does not claim full client-suite, build, review, or release proof.
|
record now has ML-08 command verification but does not claim ML-09 review,
|
||||||
|
release proof, or live acceptance. The client/server draft PR promotion is
|
||||||
|
externally blocked in this environment because GitLab HTTPS credentials are
|
||||||
|
unavailable non-interactively and `gh`/`glab` are not installed; no draft PR
|
||||||
|
is claimed from this worktree.
|
||||||
|
- ML-09 remains pending for repository-local review and one remediation
|
||||||
|
implementer if findings require it. X-01 remains a TODO after both reviews:
|
||||||
|
exercise real PostgreSQL with a signed-in MakeLore preview and record live
|
||||||
|
acceptance separately; repository E2E results cannot substitute for it.
|
||||||
|
|
||||||
## Promotion Candidates
|
## Promotion Candidates
|
||||||
|
|
||||||
|
|||||||
Reference in New Issue
Block a user