docs: record AI Design outcome integration

This commit is contained in:
2026-09-03 18:26:39 +08:00
parent a16dfd0d6f
commit 14efa99f0c
4 changed files with 193 additions and 0 deletions

View File

@@ -0,0 +1,139 @@
# Task: Integrate AI Design command outcome fix
## Identity
- Task ID: 20260903-design-message-send-client-integration-6f3a8c21
- Mode: Integration
- Branch: main
- Worktree: D:\Datas\OthersProjects\makelore
- Base commit: 4d8b19eeb5e70c97d40d2db68f37ee9f425b54f0
- Owner: codex-root
- Status: Ready for Integration
## Scope
- Integrate completed client source commit
`83f3f134a6779251aaa18f3290308cd9221b038f` from task
`20260903-design-message-send-client-8d3f2a71` onto the current `main`
frontier `4d8b19eeb5e70c97d40d2db68f37ee9f425b54f0`.
- Verify the Main-to-Renderer command-outcome contract on the integrated tree,
record the source under the canonical integrated-state snapshot, and close the
source/integration task ownership lifecycle.
- Do not modify Works Square server code, Plugin navigation behavior, packaging,
deployment, publication, or remote branches.
## Intent And Constraints
- Preserve ADR-007: definitive Agent-run failures settle the matching pending
operation, while accepted commands whose result is transport-unknown retain the
same stable operation identity. Neither case may be described as a generic
message-send failure.
- Cherry-pick only the exact reviewed source commit. Its parent is
`e9875145b41a2cb1827de10d27a4fc6a352704ea`, which is the exact merge base with
current `main`; subsequent mainline product changes have no path overlap with
the source's Main/Renderer Design files or focused tests.
- Preserve the unified Plugin workspace, Coding runtime/reconciliation fixes, and
every other current-main behavior. The source task has no promotion candidate
and does not change architecture direction or public server DTOs.
- Preserve these three pre-existing foreign untracked task records byte-for-byte
and never stage them:
`.project-docs/30-worklog/tasks/20260901-package-122-c5e8.md`,
`.project-docs/30-worklog/tasks/20260901-package-123-d7f3.md`, and
`.project-docs/30-worklog/tasks/20260902-client-hang-diagnosis-a47c9e2b.md`.
- Do not use a destructive reset, stash, clean, rebase, force-update, push,
package, deploy, publish, or call a paid Provider. One soft reset of this task's
newly created local commit was later separately authorized by the user; it kept
the index and worktree intact so the source task record could be registered before
recommitting the identical patch.
## Concurrent Task Gate
- Task `20260903-design-message-send-client-integration-6f3a8c21` exclusively owns
the root `main` worktree at base
`4d8b19eeb5e70c97d40d2db68f37ee9f425b54f0` and holds the Integration lock.
- The previous root Integration task was already `ready_for_integration`; its
normal release was blocked only by the three adopted foreign records. After the
user explicitly authorized recovery, it was released with `--force`; no file was
modified or removed. This task then adopted the same exact foreign records.
- Source task `20260903-design-message-send-client-8d3f2a71` is clean and
`ready_for_integration` in its isolated worktree. Its task record, outcome,
verification, and empty Promotion Candidates were read.
- The only owner created after the immediately preceding all-peer root Integration
gate is `20260903-package-129-a6f2`; it is ready and explicitly owns no product
source change. Plugin implementation/acceptance sources are already represented
in current `main` and do not overlap this source.
- Gate result: Passed.
## Project Context Loaded
- Read the active task, project positioning, success criteria, current state,
decision index, ADR-007, system overview, module map, data flow, business rules,
evidence index, reflection index, commitments, stale-items register, and the
source task record.
- Current authority is one Main-owned Works Square V2 transport and one
server-owned Current Specification. Renderer drafts remain local until a
canonical success; transport ambiguity must retain the original operation ID.
- `project-positioning.md` remains an unfilled repository template, while the
concrete product boundary is supplied by `AGENTS.md`, current state, ADRs,
architecture, business rules, and success criteria. This stale placeholder does
not conflict with the requested bounded integration.
- No source promotion candidate, accepted-decision conflict, or active semantic
ownership conflict was found.
- Planning Gate result: Passed. Integration plan: cherry-pick the exact source,
resolve only if a real conflict appears, run focused and repository-required
verification, update this record and `current-state.md`, commit documentation,
then complete and release both task contexts from clean worktrees.
## Outcome
- Released the stale completed root Integration owner only after the user
explicitly authorized the required force recovery; verified that the three
existing foreign untracked records remained present and unchanged, then acquired
this task's exclusive Integration lock.
- Cherry-picked exact reviewed source
`83f3f134a6779251aaa18f3290308cd9221b038f` without conflict onto current `main`,
creating product commit `a16dfd0d6f48b99899ba84ac63bde4dcd661d067`.
No later Plugin, Coding, package, or project memory behavior was replaced.
- The first automatic cherry-pick committed the source task record before it could
be registered as an unchanged foreign source, so the documentation drift gate
blocked. With explicit user approval, soft-reset only that new unpushed commit,
registered the staged source record through `--adopt-existing`, and recommitted
the identical source patch. No file content was discarded or rewritten.
- The integrated client now distinguishes a definitive failed/cancelled Agent Run
from a command accepted before an uncertain poll/refresh result. Definitive
failures settle pending state and partial streams while preserving the draft;
unknown results preserve the original pending ID, draft, and stream. Youth-facing
copy no longer misreports either outcome as a generic send failure.
- Recorded the exact source and integrated behavior in `current-state.md`. No
promotion candidate or accepted decision required modification; this implements
ADR-007's existing stable-operation and authority rules.
- No Works Square server code, database/API DTO, Plugin navigation, package,
deployment, publication, push, or paid Provider call changed.
## Verification
- Source-path comparison between `83f3f134` and the integrated working tree showed
the source task's files are identical after the conflict-free cherry-pick.
- Focused Vitest: 6 files / 61 tests passed.
- `corepack pnpm run typecheck` passed.
- ESLint over all changed TypeScript/TSX source and test files passed with no
output.
- `corepack pnpm run build:vite` passed for Renderer, Electron Main, Preload, and
utility bundles; only existing Browserslist, mixed-import, and chunk-size warnings
were emitted.
- `tests/e2e/image-workspace-v2.spec.ts` passed 2/2 against the production build.
- Full ordinary Vitest executed 225 files: 224 files / 1,865 tests passed, 2 tests
skipped, and the unrelated Pi real-process Bash-batch test exceeded its existing
2,000 ms timing assertion at 2,433 ms while tests, typecheck, and ESLint competed
for resources. The exact real-process file immediately passed 5/5 in isolation;
its files and behavior are outside this integration diff.
- The isolated pressure suite passed 1/1.
- Independent source-task review had no remaining supported-path P1/P2 finding.
## Follow-ups
- None recorded.
## Promotion Candidates
- None recorded.