From 0148b91a15b238ced26782b9a1e70e438f4b61bc Mon Sep 17 00:00:00 2001 From: brother7 <7brother7@gmail.com> Date: Thu, 13 Aug 2026 17:24:25 +0800 Subject: [PATCH] =?UTF-8?q?=E8=AE=B0=E5=BD=95=E8=BF=9C=E7=A8=8B=E4=B8=BB?= =?UTF-8?q?=E5=88=86=E6=94=AF=E6=8E=A8=E9=80=81=E8=AE=A4=E8=AF=81=E9=98=BB?= =?UTF-8?q?=E5=A1=9E?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit --- .../tasks/20260813-sync-push-main-9c2f71.md | 28 ++++++++++++++++--- 1 file changed, 24 insertions(+), 4 deletions(-) diff --git a/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md b/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md index a98f51d..886bb80 100644 --- a/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md +++ b/.project-docs/30-worklog/tasks/20260813-sync-push-main-9c2f71.md @@ -8,7 +8,7 @@ - Worktree: D:\Datas\OthersProjects\makelore - Base commit: 4fbd1d3b24493532ce479729da2c5e5e1709c8a9 - Owner: codex -- Status: In Progress +- Status: Blocked ## Scope @@ -127,9 +127,22 @@ Gate result: configuration. Two Channels specs were removed because the remote product consolidation removed their UI, route, and Host API rather than relocating them. Stable test IDs were restored to the retained proxy settings controls. -- The merge is fully verified and ready for an independent final review and - normal push. The final merge commit and remote equality are recorded after - those operations complete. +- Created merge commit + `29c458f07dd40bf8f66d4fbb2acb6fe2a1277cd7` with local preparation commit + `1c85bc04547a72ec76074480245f623e37f9cd30` as first parent and fetched remote + tip `f4113a872f7cd6aee6829c9597c882846bc4085b` as second parent. +- Independent read-only Sol review returned `PASS` with no P0-P3 findings after + checking topology, retained local features, remote consolidation, course + skill parity, documentation, E2E strength, security boundaries, and + dependency consistency. +- A normal `git push origin main` was attempted and rejected by the remote with + `Failed to authenticate user`. A read-only batch SSH check also returned + `Permission denied (publickey,...)`; the configured HTTPS credential helper + has no usable username/secret for this host. No force option was used and no + remote ref changed. Local `main` and the completed merge remain intact. +- Completion is blocked only on the user authenticating this machine for + `git.nianxx.cn`. Keep this integration task owned and do not release it until + a normal push succeeds and `origin/main` is verified equal to local `HEAD`. ## Verification @@ -142,6 +155,10 @@ Gate result: - `pnpm run test:electron:windows` — 3/3 passed. - `pnpm run test:e2e` — rebuilt Renderer/Main/Preload and passed 24/24. - `git diff --check` and `git diff --cached --check` — passed. +- Independent final review — `PASS`, no P0-P3 findings. +- Merge topology — verified first parent `1c85bc0`, second parent `f4113a8`. +- Push — attempted normally, rejected before ref update because remote + authentication is unavailable on this machine. ## Follow-ups @@ -152,6 +169,9 @@ Gate result: probing a Windows port owner. The queue regression is now deterministic; a future performance change should distinguish an attached runtime before skipping that lookup so attached-runtime restart behavior remains intact. +- Authenticate `git.nianxx.cn` through the local Git credential manager or an + authorized SSH key, then resume this same task to push and verify remote tip + equality. Do not paste a personal access token into the task conversation. ## Promotion Candidates