Files
NianAIGC/.project-docs/30-worklog/tasks/20260812-integrate-go-design-c12e7b.md
T

2.6 KiB

Task: Integrate Next and Go architecture design into main

Identity

  • Task ID: 20260812-integrate-go-design-c12e7b
  • Mode: Integration
  • Branch: codex/20260812-integrate-go-design-c12e7b-integrate-go-design
  • Worktree: D:\Datas\OthersProjects\NianAIGC-go-docs-integration-c12e7b
  • Base commit: a235266bed
  • Owner: codex
  • Status: Superseded by final validation task

Scope

  • Integrate the approved Next.js frontend plus Go backend design and the explicit implementation progress into canonical project memory.
  • Preserve the distinction between the implemented ACK-001 topology and the accepted-but-unimplemented ADR-003 target.
  • Merge documentation only; exclude all interrupted Go, Docker, Compose, ACK, package, SQL, and application drafts.

Intent And Constraints

  • The user explicitly requested design and progress documentation only, merged to main.
  • Promote the human-confirmed architecture without claiming that the Go backend exists.
  • Retain RDS-001 and RDS-002; mark ACK-001 as current transition state until implementation and cutover.
  • Preserve the occupied main worktree's unrelated untracked runtime configuration task record.

Outcome

  • Added ADR-003 as an accepted target with implementation pending.
  • Added current-versus-target sections to system overview, module map, and data flow.
  • Updated current state, task history, decision index, and commitments with explicit not-implemented progress.
  • Integrated the feature task record and detailed architecture proposal.
  • No runtime, application, database, build, package, or deployment file changed.
  • The first drift check correctly reported that source task-owned records were introduced after this task's recorded base. The prepared canonical state will be committed as a fixed read-only base, this integration lock released, and a fresh Integration Gate task will perform final validation without treating source records as integration-owned edits.

Verification

  • Source documentation commit ed60e74 was cherry-picked as 4485899 onto the integration base.
  • Source feature drift check passed before completion.
  • Canonical changes preserve current ACK-001 facts while recording ADR-003 as future target.
  • Initial integration drift check: blocked on source-record base ordering, not on document content.
  • A fresh Integration Gate based on the fixed source/canonical candidate commit is required before merging main.

Follow-ups

  • Implement ADR-003 in a separate future task only after compatibility tests are executable.
  • Live RDS/ACK/OSS/provider validation remains outside this documentation-only integration.

Promotion Candidates

  • None recorded.