Task: Review latest architecture and organize tasks

Identity

  • Task ID: 20260812-architecture-task-breakdown-a83f61c2
  • Mode: Feature
  • Branch: main
  • Worktree: /Users/brother7/Documents/AI/NianAIGC
  • Base commit: 7de3300034
  • Owner: codex
  • Status: Ready for Integration

Scope

  • Review the latest accepted Next.js frontend plus Go backend architecture on main.
  • Reconcile the ADR, canonical architecture, current integrated state, commitments, and the detailed task-scoped proposal.
  • Turn the target design into an ordered, dependency-aware implementation backlog without changing application or deployment code.

Intent And Constraints

  • Treat ADR-003 as an accepted target and ACK-001 as the current deployable truth until compatibility tests and cutover pass.
  • Put executable compatibility contracts before Go implementation.
  • Preserve same-origin HTTP/Cookie behavior, tenant authorization, PostgreSQL concurrency functions, one-shot migrations, single-writer cutover, and rollback capability.
  • Separate production rollout obligations and project-memory debt from the Go migration critical path.

Outcome

  • Confirmed the latest architecture is internally consistent across ADR-003, the system overview, module map, data flow, current state, and the detailed proposal.
  • Organized the work into seven dependency stages: compatibility baseline; Go platform foundation; identity/administration; assets/OSS; billing/usage; jobs/providers/Webhooks/WorkerLoop; frontend/deployment cutover.
  • Identified the hard gate: no Go route migration should start until executable HTTP, Cookie, authorization, database, job, billing, storage, Webhook, and deployment contracts exist.
  • Identified decisions needed before or during the baseline: no-logout Cookie compatibility versus forced re-login, public /api/v1 compatibility obligations, and production traffic/backlog limits.
  • Kept real RDS/ACK rollout, non-root container hardening, and incomplete canonical project-positioning/domain templates as separate workstreams rather than silently expanding the migration.
  • No application, database, test, or deployment file was changed.

Verification

  • Read the three latest architecture commits (4485899, 064e155, and 7de3300) and their affected records.
  • Cross-checked ADR-003 with canonical architecture, current state, commitments, the original architecture assessment, and the detailed migration proposal.
  • Re-inventoried the current API surface: 45 route files and 64 exported HTTP handlers.
  • Concurrent Task Gate and Planning Gate passed on main at base 7de3300; no peer task or semantic overlap was present.
  • Application tests were not run because this was a read-only architecture and planning review.

Follow-ups

  • Start with the compatibility-baseline epic and assign one owner per contract-test file or fixture family.
  • Obtain a product/release decision for Cookie cutover behavior and confirm the support promise for /api/v1 before freezing golden contracts.
  • Keep the existing Node migration Job during early strangler slices unless a separate accepted decision changes its implementation language.

Promotion Candidates

  • None recorded.