Files
LWLT-AIBOT/.project-docs/30-worklog/tasks/20260902-merge-all-restart-b7e3c91f.md
T

6.7 KiB

Task: Merge all completed changes and restart project

Identity

  • Task ID: 20260902-merge-all-restart-b7e3c91f
  • Mode: Integration
  • Branch: main
  • Worktree: /Users/inmanx/Documents/lwltAPI
  • Base commit: 07868f5c02
  • Owner: codex
  • Status: Ready for integration

Scope

  • Inventory all linked worktrees and local branches, distinguishing unique completed changes from branches already integrated or superseded on main.
  • Integrate every safe, task-backed, non-duplicate modification into local main while preserving unrelated or unknown work.
  • Reconcile accepted promotion candidates and the canonical integrated snapshot under the Integration Gate.
  • Run the repository's required validation, plus artifact-specific checks for any release, Skill, or DOCX changes actually integrated.
  • Restart the standard control-plane panel on 127.0.0.1:8786 and verify liveness/readiness after the merged code is running.

Intent And Constraints

  • The user explicitly authorized merging all current modifications into main and restarting the project service in this task.
  • Preserve every pre-existing change. Do not stash, reset, clean, delete, or silently adopt unknown worktree contents.
  • Source feature task records and task-prefixed supporting records are read-only during integration; canonical reconciliation is written only from this integration task.
  • Do not read .env, access ERP, mutate business tasks, deploy externally, reload the Chrome extension, or send data outside the repository/runtime scope.
  • Skip duplicate or superseded branches only after proving their effective changes are already present on main; do not merge stale history merely to create ancestry.
  • Stop for user input if source tasks contain a real product/architecture conflict or if unowned dirty changes cannot be tied to a completed task.

Outcome

  • Audited all ten linked worktrees and every local branch. git cherry showed the account-system, dashboard nice-scale, and mobile-dashboard feature commits already present on main as patch-equivalent integrations; the password-flow, prior integration, and older branches were already ancestors. The standalone kanban-card commit was intentionally not replayed because its accepted behavior is carried by the later integrated mobile-dashboard implementation and replaying the older patch would regress that responsive layout.
  • Identified one unique completed product change outside main: task 20260901-roster-header-error-a4f7, whose verified source worktree still held its changes without a feature commit. Built exact source commit e68fcc1 from that task-backed working tree through an isolated temporary Git index without modifying or adopting the source worktree, then merged it into main as a1b2d2f.
  • Resolved the only merge conflict in control-plane/README.md semantically by retaining both the current three-role/route-authorization contract and the new exact ERP-semantic roster-header contract. No ours/theirs overwrite was used.
  • Integrated passenger-workbook normalizer ltjt-passenger-roster-workbook-v1.3.0, its focused regression coverage, finite header-alias contract, lifecycle mapping/Skill updates, 0.5.125 DOCX, packaged lifecycle Skill, release-manifest hashes, and dated superseded-release archive.
  • Promoted the durable roster-header rule, immutable evidence link, source/merge commits, and integration task into canonical current state, business rules, and the evidence index.
  • Preserved the source task record and its task-prefixed evidence unchanged in the source worktree and source commit e68fcc1; they are intentionally absent from the final main tree because Integration Gate forbids one integration task from owning another task's private project-doc paths. Canonical evidence points to this integration record instead.
  • Gracefully stopped the verified standard 8786 listener PID 77059, relaunched the existing bundled pnpm run dev path from current local main, and observed stable listener PID 7357 across five repeated health samples. Database and schema readiness remained true with required migration 017_user_business_route_authorizations.
  • No ERP access/write, business-task mutation, database-row mutation, Chrome extension reload, remote deployment/push, or external delivery was performed.

Verification

  • node --test --import tsx control-plane/test/passenger-roster-workbook.test.ts: 12/12 passed.
  • node --run check:repo: 10/10 passed; release paths, hashes, packaged Skills, archive links, and repository boundaries are consistent.
  • node --run check: passed.
  • node --run test:control-plane: 156/156 passed.
  • node --run test:legacy: 264/264 passed.
  • node --run build: passed.
  • dist/release-manifest.json parsed successfully; the template, builder, 0.5.125 DOCX, and lifecycle Skill SHA-256 values exactly match the manifest.
  • Official Skill quick_validate.py: passed. dist/lwlt-lifecycle-0.5.125.skill was unpacked and compared recursively with agent设计规范/skills/lwlt-lifecycle/ with no difference.
  • Documents Skill render gate: dist/老挝联泰AI指令表-0.5.125.docx rendered with the bundled LibreOffice and Chinese font configuration to 12 PNG pages; every page was inspected at original resolution with no missing glyphs, clipping, overlap, broken layout, or footer/page-break defect.
  • Before and after restart, GET /health/live and GET /health/ready returned HTTP 200; post-restart readiness reported database=true, schema=true, and migration 017. Five consecutive samples retained PID 7357 and healthy responses.
  • AgentBus was enabled=true, connected=false, and session_ready=false before and after restart; this unchanged external-channel state does not block the panel or database readiness.
  • GET /operations-dashboard returned HTTP 200 and served the current “平台运行看板” shell after restart.
  • check_project_docs.py: passed.
  • check_doc_drift.py --task-id 20260902-merge-all-restart-b7e3c91f: passed after preserving foreign task-owned records only in their source worktree/commit and pointing canonical evidence to this integration record.
  • git diff --check: passed after merge conflict resolution and canonical reconciliation.

Follow-ups

  • A live internal attachment retry was not authorized or performed. When separately authorized, resend a sanitized/approved roster workbook and verify that the runtime accepts the exact mapped header without printing passenger values.
  • Local main was updated and restarted; origin/main was not pushed because the user did not authorize a remote write.

Promotion Candidates

  • None. The source task's compatible roster-header contract, evidence, and integrated source reference were reconciled directly under this Integration Gate.