7.0 KiB
7.0 KiB
Task: Integrate all completed changes and push main
Identity
- Task ID: 20260902-integrate-all-push-c93a7f21
- Mode: Integration
- Branch: main
- Worktree: /Users/inmanx/Documents/lwltAPI
- Base commit:
3062ed5f04 - Owner: codex
- Status: Ready for integration
Scope
- Audit every local branch and linked worktree against current
mainandorigin/main, preserving unknown or duplicate working-tree state. - Integrate source commits
6f9fd0f(AgentBus account workers) andb1fe533(display-only dashboard metrics) with currentmaincommit3062ed5(bounded dashboard filtering). - Resolve overlapping dashboard, authorization, AgentBus, release, and test changes semantically without regressing accepted mobile/dashboard behavior.
- Promote accepted AgentBus worker-routing, dashboard display/filter, and bounded-query facts into canonical project memory.
- Run repository, TypeScript, control-plane, legacy, build, extension/package, and project-doc checks; then push
maintooriginwithout force and verify the remote tip.
Intent And Constraints
- The user explicitly authorized merging all current changes into the main branch and pushing the result to the repository.
- Keep the fixed single-organization authorization model, leadership-only read dashboard, business-facing projection, organization-wide ERP FIFO, and existing write-safety gates.
- Apply the source task's user-confirmed metric-card behavior: summary cards are display-only; explicit form controls own filtering and default to all results.
- Apply the source task's user-confirmed AgentBus model: one channel binds one non-admin employee account; tasks keep an immutable assignee; only one fresh matching browser/ERP worker may execute for that account; administrators manage and inspect but do not claim another assignee's work.
- Do not read
.env, deploy or restart services, apply migration 018, reload the extension, access ERP, mutate runtime tasks/accounts/channels, or send external business data. - Do not modify source task records or task-prefixed supporting records. Keep duplicate or already-integrated dirty worktrees untouched after proving their effective changes are represented by commits reachable from
main. - Use a normal non-force push only after all required checks pass and
origin/mainis confirmed not to have advanced unexpectedly.
Outcome
- Audited all 13 linked worktrees and every local branch after fetching
origin. The account-system, password, dashboard scale/mobile, roster, prior integration, and older branches are ancestors or patch-equivalent to changes already represented onmain. - Compared every dirty path in the roster source worktree against source commit
e68fcc1; all 23 paths matched byte-for-byte or matched the recorded deletion, proving that no unique roster product/release change remained outside the already merged history. - Kept source-task-only records and superseded/empty operational branches out of the integration tree. The older kanban selected-card commit was not replayed because its accepted status presentation was already carried by the mobile integration and its click-to-filter behavior is explicitly superseded by the display-only metric-card decision.
- Finalized and reverified AgentBus source task
20260902-agentbus-account-routing-b62f19e4as commit6f9fd0f, then merged it throughb5f5847while retaining the dashboard query changes already onmain. - Integrated display-only dashboard source commit
b1fe533through merge commitcc09506, preserving the 20-row bounded query, abort/timeout feedback, mobile layout, rankings, business-facing attention-state merge, and explicit filter form. - Resolved both merge rounds' static-asset conflicts with one combined cache token instead of choosing either side mechanically. Source task records remain unchanged in their source commits/worktrees as required by Integration Gate ownership.
- Advanced the synchronized Chrome extension release to
0.5.164, archived0.5.163, added migration018_agentbus_account_workers, and retained manifest/source/ZIP consistency. - Promoted the accepted channel-owner → employee account → immutable task assignee → one matching fresh browser/ERP worker chain into AUTH-001, architecture, data flow, domain rules, current state, evidence, commitments, and integrated history.
- Recorded the final dashboard contract: five summary cards are display-only, the explicit status filter defaults to all results, and dashboard reads use one bounded read-only transaction with selective hydration and page-only detail projection.
- Pushed local
maintoorigin/mainwithout force after a fresh fetch proved the remote had no unseen commits. - No database migration, service restart, extension reload, ERP access/write, runtime task/account/channel mutation, deployment, or external business-data transmission was performed.
Verification
- Before source commits,
check_project_docs.py, task-aware drift checks,git diff --check, repository hygiene, type checking, full control-plane/legacy suites, builds, extension JavaScript syntax, and package/source/hash checks passed for both the dashboard-filter and AgentBus worktrees. - AgentBus source verification passed repository hygiene 10/10, control-plane 158/158, legacy 264/264, TypeScript no-emit/build, extension/platform syntax, and release consistency.
- The AgentBus merge passed TypeScript, repository hygiene 10/10, and focused account/AgentBus regression 29/29.
- The combined dashboard merge passed focused dashboard regression 5/5, authorization regression 10/10, JavaScript syntax, and staged-diff checks.
- Final integrated-tree verification passed:
node --run check:repo10/10,node --run check,node --run test:control-plane158/158,node --run test:legacy265/265, andnode --run build. check_project_docs.py,check_doc_drift.py --task-id 20260902-integrate-all-push-c93a7f21, conflict-marker scanning, andgit diff --checkpassed on the reconciled tree.- Final
git cherry main <branch>audit found only three patch-equivalent source commits and standalone53a38f2; that older selected-card patch is intentionally superseded as documented above. No unintegrated product/release commit remains. - After the initial fetch,
origin/main...mainreported0 28: the remote had no commits absent locally, and localmainwas 28 commits ahead before the documentation commit and push. - The first non-force push advanced
origin/mainfromffa3340to9eeb0710992f76a91b2bab934186b8c85040936c.git ls-remote origin refs/heads/mainreturned that exact hash, local/remote divergence was0 0, and the worktree was clean before this completion-record-only update.
Follow-ups
- Migration 018, service restart, extension
0.5.164rollout, employee ERP/channel configuration, and the two-cloud-PC staging matrix require a separate explicitly authorized runtime task. - A live internal AgentBus attachment retry and the already recorded ERP read/write verification gaps remain separately authorized work.
Promotion Candidates
- None recorded.