# Task: Finalize extension update main push ## Identity - Task ID: 20260903-finalize-extension-update-a6c4e192 - Mode: Integration - Branch: codex/20260903-finalize-extension-update-a6c4e192-finalize-extension-update - Worktree: /Users/inmanx/Documents/lwltAPI-finalize-extension-update-a6c4e192 - Base commit: 322475860afa81ed43cb59164d815d20590d3125 - Owner: codex - Status: Integrated and pushed ## Scope - Finalize merge commit `3224758`, which combines completed source commits `500034b` and `f08aac0` with the current `origin/main`, including adaptive ERP readiness, extension `0.5.167`, migration 019, central-service OSS publication, ECS Cloud Assistant host deployment, multi-account host locking, tests, release artifacts, and operator documentation. - Reconcile the accepted central-server/multi-Windows-Server update architecture into canonical project memory, preserving the existing unpacked-extension model and recording the user-selected Cloud Assistant boundary as the successor to the earlier Web Store/managed-CRX assessment. - Run the complete repository, release, document and build gates, then update `origin/main` by a normal non-force push. Stop at repository synchronization as the user ultimately requested; do not deploy or restart a service. - Produce a concrete server-colleague handoff covering migration order, environment/RAM/OSS/ECS mapping, one-time profile bootstrap, canary, health checks, rollback, and the boundary between Git synchronization and live production rollout. ## Intent And Constraints - The user explicitly authorized merging all changes from this extension-update line into remote `main`, then clarified that repository synchronization is the terminal action. “All changes” is scoped to the two-commit feature ancestry and its governed artifacts, not unrelated ready-for-integration worktrees. - This task starts at merge commit `3224758`, so both source task records are part of the recorded baseline and remain read-only. The local `main` worktree is owned by task `20260902-migrate-restart-confirmed-4f8c2a71`; do not alter, adopt, stash, reset, or run its local service. - Preserve `AUTH-002` account-scoped execution and assignee-only routing while adding the host-level update gate. Resolve source conflicts semantically; never use wholesale `ours`/`theirs` resolution for canonical documents or safety-sensitive code. - Accept the user's clarified architecture: one independent central Node service controls many multi-account Windows Server hosts; private OSS stores immutable bytes; Alibaba Cloud Assistant executes one-shot bounded PowerShell; no separately maintained LTJT host updater is introduced. - The external replacement of a shared unpacked-extension directory plus extension-owned idle reload does not claim Chrome-native self-installation. Every existing Chrome profile still requires a one-time manual `0.5.167` bootstrap from the shared ProgramData path before auto-update is enabled. - Do not read or print `.env`, credentials, tokens, browser storage, customer data, or database business inputs. Do not force-push, deploy or restart a service, publish a release, enable automatic updates, map production ECS instances, mutate ERP tasks, reload Chrome, or call a real Cloud Assistant command. ## Outcome - Verified merge commit `3224758`, which preserves source commits `500034b` and `f08aac0` together with the latest `AUTH-002` account-scoped queue, force-delete, dashboard, and executable-routing changes already present on remote `main`. - Accepted `EXT-001`: the separate central Node control plane owns monotonic extension releases and host state, private OSS stores immutable package bytes, and ECS Cloud Assistant supplies one-shot Windows execution without adding a separately maintained LTJT updater. - Promoted the host-safety invariant that update start and ERP claim serialize through the same organization boundary. All mapped accounts must be idle before deployment, and every old-version browser remains claim-blocked until it safely reloads and reports the target version. - Promoted extension `0.5.167` as the one-time shared-ProgramData bootstrap and migration `019_extension_host_updates` as the required schema baseline. Automatic updates remain disabled until every profile is bootstrapped and the restricted RAM/OSS/HTTPS/ECS configuration plus one-host canary are complete. - Updated the canonical decision index, architecture, data flow, current state, task history, evidence and rollout commitment. Corrected production documentation to require migration 019 and to keep automatic updates disabled during the first `0.5.167` service deployment. - Kept the user-rejected web-page local-filesystem alternative out of the repository. The final implementation remains the previously completed OSS plus Cloud Assistant design. - A fresh pre-push fetch showed divergence `0 4` and proved remote `main` was an ancestor of the verified Integration tip. A normal non-force push advanced `origin/main` from `f52d9d7` to `efc342c626f4e9c67cb4a1ca0ef791251724e495`. - No production deployment, service restart, database migration, OSS publication, ECS command, Chrome reload, ERP operation, live task mutation, or secret access occurred. ## Verification - Fresh `npm ci --no-audit --no-fund` completed from the merged lockfile in this corrected Integration worktree. - `node --run check:repo` passed, 10/10. - `node --run check` passed. - `node --run test:control-plane` passed, 169/169. - `node --run test:legacy` passed, 270/270. - `node --run build` passed. - `node --check` passed for the extension background and business bridge scripts. - `unzip -t dist/ltjt-order-assistant-0.5.167.zip` passed; SHA-256 is `6822ec660097a8889da8ea4fa22d4091467aa022067bff3bee2ac5406864b679`. - `git diff --check` passed. - After the normal push, local `HEAD`, the `origin/main` tracking ref, and `git ls-remote origin refs/heads/main` all returned `efc342c626f4e9c67cb4a1ca0ef791251724e495`; source commits `500034b` and `f08aac0` were both confirmed as remote ancestors. - This task record is finalized in a documentation-only follow-up commit after that remote-equality check. ## Follow-ups - Server operators must back up PostgreSQL, apply migrations through 019, deploy with updates disabled, bootstrap every profile from the shared `0.5.167` directory, configure least-privilege ECS/OSS/HTTPS values and exact account-to-instance mappings, then enable and canary a higher version before fleet rollout. - The inherited production-dependency audit findings recorded by source task `20260903-service-extension-update-8d42c6f1` remain a separately scoped security-maintenance item. ## Promotion Candidates - None. The user-confirmed update topology and rollout invariants were promoted by this Integration task as `EXT-001`.